Prioritize a WOT for Schedule Optimization

To prioritize a work order task (WOT) for Schedule Optimization, a wm_admin first adds the value and time-penalty optimization features to the relevant policy. A dispatcher with wm_dispatcher then opens the work order task, enters its optimization values and penalties on the Scheduling tab, and selects Update. Review the subsequent optimization run to assess the result.

Enable the policy before changing task values

A work order task can carry information about its importance, but the optimization policy must include the features that use that information. Start with the policy governing the assignment group or territory involved. Changing a different policy may leave the saved task values with no visible effect on the run you are investigating. The role required for this policy configuration is wm_admin. The dispatcher action described later requires wm_dispatcher. Treat these as separate responsibilities in the handoff: the administrator prepares the policy, and the dispatcher maintains the task information. Check the configuration on your instance and release before applying the sequence to production work.

For the wider relationship between policies, objectives, and constraints, see field service Schedule Optimization. For this change, keep the scope narrow: make task importance available to the policy that will evaluate the selected work.

  1. Open All > Schedule Optimization > Administration > Policies.
  2. Open the relevant policy record.
  3. Choose the Objective or Constraint tab and select New.
  4. Use the Lookup icon in Optimization Features to add the required features.
  5. Select Submit to save the configuration.

The required features are Maximize higher value task assignments, Minimize task time penalties (fixed), and Minimize task time penalties (hourly). Include all three in the relevant policy. Together, they let Schedule Optimization consider the task values and penalties during processing.

Before handing control back to dispatch, check the policy record again. Record which policy was changed and which assignment group or territory the test will cover. This gives the administrator and dispatcher a shared reference when they inspect the run results.

Prioritize a work order task for Schedule Optimization

The dispatcher edits the work order task after the administrator has prepared the policy. Optimization values and penalties apply to Schedule Optimization. Treat the change as input to that scheduling process; saving it does not establish that a technician has received the task.

  1. With wm_dispatcher, navigate to All > Field Service > Work Order > All Work Order Tasks.
  2. Open the work order task whose importance needs to change.
  3. Select the Scheduling tab.
  4. Complete the task’s optimization value and penalty fields according to the agreed dispatch decision.
  5. Select Update.

Before editing, write down the operational reason for giving this task greater importance. For example, a dispatcher might need to distinguish a time-sensitive repair from work that can wait. This is a decision for the service team; it should not become an undocumented number chosen simply to make a particular assignment appear.

Use a consistent interpretation of values and penalties across the tasks in the test. A comparison becomes difficult to explain when dispatchers use different meanings for the same input. Agree on the business meaning first, then use the task form to express it.

Keep the distinction between scheduling inputs and dispatch decisions clear. The field service scheduling versus dispatch comparison explains the neighboring responsibilities when teams are deciding who should maintain these inputs and who should act on the resulting schedule.

Test the policy and task together

Use a limited test that can be explained afterward. Capture the selected task, its previous scheduling inputs, the revised inputs, and the policy being evaluated. Choose a run that includes the task’s assignment group or territory, then examine the result against the expected operational outcome.

Schedule Optimization applies policy objectives and constraints when it processes tasks and technicians. Objectives influence assignment priorities. Constraints set the conditions an assignment must meet. A task’s increased importance therefore needs to be evaluated alongside the constraints and available resources in that run.

A sensible test expectation is that the run considers the configured value and penalty inputs. Do not make immediate assignment the sole acceptance criterion. Scheduling conflicts, excluded technicians, and insufficient capacity can still affect the outcome.

  • Confirm that the edited task is the task inspected in the run.
  • Compare the applied objectives and constraints with the intended policy.
  • Check the resources and shifts evaluated during processing.
  • Read validation or exception messages before changing inputs again.

Change one aspect of the test at a time where possible. If policy features, task inputs, and technician capacity change together, the final assignment gives little evidence about which change mattered. Retain the original values so the service team can review its decision without relying on memory.

For help planning this work, see ServiceNow implementation.

Use run results to explain the assignment

The Run Summary module brings optimization activity together for review. Run summaries show the tasks, technicians, and shifts considered, the applied objectives and constraints, and validation or exception messages. Use this information to connect the dispatcher change to the scheduling decision.

Read task outcomes precisely. Optimized means the assignment group or territory was sent to the optimization engine. Task outcomes are Assigned, Unassigned or Unchanged, and excluded technicians appear under Dropped Technicians. Assigned indicates an assignment to a technician. Unassigned means a task that was assigned before the run has been unassigned by it. A task that had no assignment beforehand stays Unchanged in the pending dispatch queue, because the run did not modify it. Error means the assignment group or territory hit a processing problem during optimization. Read its validation or exception messages before judging the tasks inside it. These distinctions matter during acceptance. A task reaching the engine is a different checkpoint from receiving an assignment. Likewise, an unchanged task requires investigation of its circumstances rather than an assumption that the dispatcher failed to save the record.

Review the messages and resource detail alongside the task outcome. Identify the specific reason the expected assignment did not occur before increasing penalties again. This prevents the team from trying to solve a capacity or scheduling issue through repeated changes to task importance.

When reviewing broader scheduling design, use field service scheduling method and workforce setup to place this task-level change within the surrounding setup.

Resolve capacity and calendar issues before retuning importance

Technicians who are not considered for optimization are listed under Dropped Technicians in the run summary. Open that technician’s Run Detail record to read the resource note that explains the exclusion. If the technician expected to handle the prioritized WOT was dropped, investigate that schedule problem before revising the task’s value.

Calendar schedule creation requires agent_schedule_admin. Schedule records define a time zone and schedule type; schedule entries define included or excluded periods. A schedule name by itself does not describe the working periods available to the optimizer. Review the entries and time zone when checking whether the intended availability has been represented.

Conflict tasks need a different investigation. When a task stays unscheduled, open the Work Order Tasks related list on the run summary to see how each task was processed. Check that task’s existing bookings separately. Inspect that booking relationship before treating the result as a policy failure.

When capacity is insufficient, the run can complete with work still unscheduled. Depending on the task’s prior state, it may become unassigned or remain unchanged in the pending dispatch queue. The response may involve manual assignment, additional work schedule capacity followed by configured on-demand optimization, or waiting for another run.

For a clean handoff, keep a short review record containing the task identifier, the selected policy, the run inspected, and the reason for the outcome. Separate the next administrative change from the next dispatcher action. If a schedule needs correction, assign that work explicitly; if the task inputs need reconsideration, retain the business reason for the revision. This makes the follow-up decision traceable without repeatedly changing unrelated configuration.

Questions about prioritization boundaries

Can increasing task importance make a schedule-locked task eligible for reoptimization?

Intraday reoptimization excludes schedule-locked tasks. Treat a lock as a separate scheduling condition during investigation. A change to the task’s importance should not be used as evidence that the task has become eligible for that reoptimization.

Is prioritized event optimization the same as editing a WOT?

No. Prioritized event optimization is a focused intraday mode that reacts to critical events and targets affected tasks and technicians. Editing a WOT supplies task-level optimization inputs.

Can a run summary explain crew assignments?

Run summaries do not show crew assignments or explain crew-based scheduling results. When the work depends on a crew, do not use the absence of crew detail as proof that changing the task’s importance failed.

Should a completed run end the investigation?

No. Completion describes the run, while the task detail describes what happened to the WOT. Retain both in the review record, together with the business expectation. Close the investigation when the team can explain the outcome and identify any remaining operational action.