Schedule Optimization integration user access requirements

Schedule Optimization integration user access requirements center on sharedservice.worker, the service account that queries data during optimization. Standard work order task fields already have read access. When a Task Filter references custom fields, custom tables, or another task submission table, grant this account the admin role and validate the affected task selection.

Identify what the integration account must read

Begin with the account used by the optimization process, rather than the person who starts a run. The optimization process queries the database as sharedservice.worker, a service account with no admin rights by default. Out of the box it can already read every standard field on the work order task table. The access decision depends on the data referenced by the Task Filter. A filter that stays within standard work order task fields has a different access starting point from a filter that includes a custom field or another table. Record those references before changing the account. A short field inventory makes the decision reviewable and gives testing a defined scope.

For each filter under review, capture the task submission table, the fields referenced, and whether those fields are standard or custom. Include the business reason for each condition. This review should describe the actual configured filter, rather than the fields a dispatcher happens to see on a form.

For the wider scheduling context, see field service schedule optimization. Keep this access review focused on the data that optimization needs to retrieve.

Apply the Task Filter access requirement

Grant sharedservice.worker the admin role when a Task Filter uses a custom field, a custom table, or a table other than the default work order task table to submit work orders. These are specific triggers for the elevated access requirement. Do not assume that a field is covered simply because it appears on a familiar task form.

Missing access can make affected tasks disappear from optimization processing. That omission matters operationally. If the role is missing, affected tasks may be skipped during optimization, which can cause double booking or incorrect assignments. A schedule that appears plausible is therefore insufficient evidence that the worker could read the full intended task population.

Use a review sequence that ties the permission change to its trigger:

  1. Identify the Task Filter used for the scheduling scenario being assessed.
  2. List the fields and tables referenced by its conditions.
  3. Mark the references that are custom or outside the default work order task table.
  4. Record whether one of those references triggers the admin requirement for sharedservice.worker.
  5. Choose representative affected tasks before testing the change.

The access behavior described here is consistent across Brazil, Australia, and Zurich; check it against your instance and release before applying a production change. Treat the account change as a security decision with a named reviewer and a documented reason. That review should acknowledge the required role rather than substitute an unverified narrower role.

Update the correct user record

Navigate to User Administration > Users and search the User ID for sharedservice.worker. Open the matching user record. In its Roles related list, select Edit to add the roles needed for read access to the fields and tables referenced by the Task Filter. For the custom-field and alternate-table conditions above, the stated requirement is admin.

Before making the change, verify that the User ID matches exactly. A similarly named human account is a different identity and would not establish access for the worker. Record the roles present before the change so the reviewer can distinguish an existing grant from the role being added.

After completing the update, inspect the account again and record the resulting role assignment. This is a recommended change-control check: it establishes what was saved before the optimization test begins. Keep the role evidence alongside the filter inventory so the next person can trace the relationship between the configuration and the grant.

A broader access review can use the field service security and access design guidance.

Separate worker access from application roles

Schedule Optimization includes roles for people using and configuring the application. Holding schedule_optimization_user lets a person open the application and start an on-demand optimization run. The schedule_optimization_planner role supports administration configuration and schedule planning activities, and contains assignment_rule_admin.

Those role descriptions concern different actions from the integration user’s database queries. Successful on-demand execution by a person does not establish that sharedservice.worker can read a custom field. Likewise, a planner’s configuration access does not explain whether a task filter meets the worker account’s read requirements.

Record the actor for each test. A test record should distinguish the person triggering an execution, the person reviewing configuration, and the shared integration account. This makes a failed check easier to investigate: application access, configuration capability, and task-data access have separate questions to answer.

Avoid granting a planner role to the worker as an assumed replacement for the stated admin requirement. The relevant requirement is tied to the Task Filter’s referenced data, not to whether the account can perform a planning activity. Use field service integration patterns when mapping account responsibilities across a larger design.

Validate task coverage before accepting the schedule

Build the test around tasks expected to satisfy the filter. As a recommended validation method, select examples covering a standard condition, a custom-field condition, and an alternate table where those configurations exist. Write down why each example should be eligible. That expected set is the reference for checking the optimization result.

Run the relevant optimization scenario and compare the affected tasks with the expected population. Investigate missing tasks before judging whether the resulting schedule is acceptable. Otherwise, a comparison of technician assignments can overlook a task that never participated in the run.

Separate the checks into stages:

  • Confirm that the test task actually meets the configured filter conditions.
  • Confirm the worker account’s role assignment for any custom or alternate-table reference.
  • Check whether the expected task participates in the optimization scenario.
  • Review assignments for conflicts involving the affected workload.
  • Record unresolved exceptions before closing the access change.

A scope sets which groups or territories, which tasks and which policies an optimization run considers. A batch is the timetable that runs one or more scopes. Check that the test uses the intended scope and batch context. Testing a different population can give reassuring results without exercising the access change under review.

Keep the access decision connected to configuration changes

Include a worker-access checkpoint when a Task Filter gains a custom reference or changes the table used to submit work orders. This is a recommended review practice, not a separate product setting. The checkpoint should ask what changed in the filter, what the account must read, and which test demonstrates coverage. Teams that need help setting up the scope and batch context this test depends on can start with ServiceNow implementation.

Keep a compact handoff record containing the filter inventory, the account reviewed, the role decision, the expected task examples, and the validation outcome. If the filter later changes again, this record gives the next reviewer a starting point without treating an earlier successful run as permanent evidence.

Bring these questions into the field service requirements workshop before customization is agreed. Knowing that a proposed filter changes account requirements helps the business and security reviewers assess the design together.

Questions about integration account access reviews

What should an access approval record explain?

The handoff record described above should name the exact filter references that trigger the change, the account receiving the role, and the validation evidence expected.

How can a test avoid using sensitive task details?

Use representative test records and record the conditions they satisfy rather than copying customer details into the handoff record. The review needs enough information to establish task eligibility and coverage; agree on what evidence can be retained with the people responsible for the test environment.

Should access and scheduling acceptance have the same reviewer?

Consider separate review responsibilities when the organization has distinct security and field service owners. One assesses the permission decision; the other assesses whether the task population and resulting assignments meet the scheduling need. Agree on the handoff before testing so unresolved findings retain an owner.

What belongs in a rollback discussion?

Discuss the role change together with the filter configuration that required it. A recommended rollback plan identifies the prior configuration, the person authorized to restore it, and the evidence needed to reassess scheduling. Removing a grant while leaving its triggering filter unchanged needs explicit review.

How should teams handle an incomplete validation result?

Record which expected tasks were checked, which remain unresolved, and who owns the next investigation. Avoid marking the access review complete from a partial sample whose missing cases include the custom references being assessed. Keep the outstanding cases visible in the change record.