OBLYTECH Logo
OBLYTECH Logo

Configure the AI agent triggers for offboarding to use Employee Center

To configure the AI agent triggers for offboarding to use Employee Center, open AIA Trigger Configuration, activate Offboarding knowledge transfer trigger, set Portal to Employee Center, and select Update. Apply the same settings to Knowledge transfer record created so managers and departing employees can use the knowledge transfer conversations through ServiceNow Otto.

Prepare the offboarding workflow before changing its portal

This change connects two trigger configurations to Employee Center for the offboarding knowledge transfer plan generation agentic workflow. The workflow collects the manager’s confirmation that knowledge transfer is needed and the document time range, discovers the departing employee’s documents, and presents the resulting knowledge transfer content to the employee for approval. Treat portal configuration as one part of that sequence.

The role required for the trigger configuration task is admin [virtual_agent_admin]. Arrange the configuration work with a user who has that required access. The manager’s later participation has a different requirement: the plan generation task requires manager. Keep configuration access and participant testing separate when preparing your change.

Before editing, identify the offboarding journey configuration that will be used for validation. Its Journey accelerator plan type must be Agentic AI Offboarding Plan Type, and LE activity sets can be personalized must be selected. Record which journey and participants will support the test, so a successful form update can be followed by a meaningful workflow check.

The workflow also requires installed and configured components: AI Agents for HR Service Delivery (sn_hr_ai_agents), ServiceNow Otto for HRSD (sn_hr_gen_ai), Journey designer (sn_jny), AI Search (glide.ais), External Content Connectors (sn_ext_conn), and External Content Connectors SharePoint Online (sn_ext_conn_spo). Check the configuration against your instance and release before proceeding.

For the surrounding journey design, use the guidance on Lifecycle Events builder triggers and employee requests. Record the expected offboarding start separately from the portal setting you are about to change.

Configure the AI agent triggers for offboarding to use Employee Center

Begin with the named manager-facing trigger. Use its full name when locating the record, especially if the instance contains other agentic workflow triggers. A similar onboarding name can lead you into a configuration for a different journey. In the Brazil release, the manager and employee conversations are named Now Assist in Virtual Agent; in Australia and Zurich they are named ServiceNow Otto. Use the name that matches your release.

  1. Open All and enter sn_aia_trigger_configuration.list in the navigation filter.
  2. In AIA Trigger Configuration [sn_aia_trigger_configuration], open Offboarding knowledge transfer trigger.
  3. Check whether Active and Portal are present on the form.
  4. If either field is missing, select and hold the form header, or right-click it, and choose Configure > Form layout.
  5. Move Active and Portal from Available to Selected using the Add icon, then select Save.
  6. Select the Active check box and set Portal to Employee Center.
  7. Select Update to save the trigger configuration.

Adding a field to the form and assigning its value are separate actions. A visible field does not establish that the trigger has been activated or assigned to the intended portal.

After Update, reopen each trigger and confirm the saved Active and Portal values.

Apply the same portal setting to the Knowledge transfer record created trigger

Return to the configuration list and open Knowledge transfer record created. Repeat the field visibility steps if needed, select Active, set Portal to Employee Center, and select Update.

The workflow has two participant phases. In the manager conversation, ServiceNow Otto asks whether knowledge transfer is needed and asks for the document retrieval time range. Later, the departing employee is notified in Employee Center to review the generated summary, and it is shared with the manager only after the employee approves it. Your configuration checklist therefore needs a separate entry for each named trigger.

Lifecycle activity behavior has its own design considerations. Review activity set trigger types when the surrounding offboarding journey also needs attention. Keep the two portal assignments identifiable within that broader work.

Check the activation and conversation dependencies

For activation of the Offboarding knowledge transfer trigger, the required role is admin [virtual_agent_admin]. The activation path starts at All > AI Agent Studio > Create and manage. The Generate offboarding knowledge transfer agentic workflow is duplicated, then its setup proceeds through requirements, user access, and data access to Add triggers.

Within that activation flow, the trigger’s Trigger is OFF toggle changes to Trigger is ON, and Portal is set to Employee Center. The channel setup uses Display in the Virtual Agent widget and sets Assistants where AI agents are discoverable to ServiceNow Otto (default). Save and test is the concluding control in that sequence. In the Brazil release, the duplicate has (Copy) appended to the original workflow name, and you can revise the workflow and trigger names to match your organization’s naming conventions before you save. The activation result is that the system starts the knowledge transfer process with the manager when an employee’s offboarding journey begins.

Include activation of Knowledge transfer record created in the readiness checklist too. The Knowledge transfer document grouper skill must also be active. Activating that skill requires admin [virtual_agent_admin]: navigate to All > Now Assist Admin > Skills, choose Employee > HRSD, locate Knowledge transfer document grouper, and use Turn on.

Employee Center must also be included in the Now Assist in Virtual Agent display experience. If these dependencies still need configuration, the ServiceNow implementation page is the next place to look.

Validate the manager and employee experience

Use a controlled offboarding scenario with the expected manager and departing employee. For the manager task, the required role is manager. Start with an offboarding journey that uses Agentic AI Offboarding Plan Type, then have the manager navigate to All > Self-Service > Employee Center.

The expected manager experience begins with a ServiceNow Otto notification. Selecting the Otto icon presents the departing employee’s name, departure date, and a question about whether knowledge transfer is needed. The manager enters Yes and supplies the document retrieval time range in months. The default retrieval maximum is 25 documents, and the sn_jny.offboarding_kt_ai_search_max_documents system property controls that limit. If fewer resources come back than expected, check the requested period and the configured content sources, and record the current property value before considering a change.

The generated knowledge transfer stage contains a work summary for that period. The manager is then asked whether to publish its tasks. After the manager enters Yes, the conversation provides a journey link and indicates that the employee will be notified to review the transfer. Capture these outcomes as test evidence.

Continue the test through employee review. The departing employee reviews the generated knowledge transfer content and approves it before sharing with the manager. A manager conversation alone leaves that second phase untested. Record the employee outcome and any interruption separately, so the team knows where investigation should begin.

In the Brazil release, the employee side of this phase is the task Review offboarding knowledge transfer summaries using Now Assist. It requires the employee role, and it can start only after the manager has completed the knowledge transfer request for the departing employee. The summary the employee sees is organized by category for the time range the manager entered, and each item includes a description and links to the related resources.

To run the employee review, follow these steps:

  1. Navigate to All > Self-Service > Employee Center.
  2. Select the ServiceNow Otto icon in the notification to open the conversation.
  3. Optionally, select the link to the knowledge transfer summary and check the time range, projects, and resources it contains.
  4. Optionally, edit the summary before approving it. You can add, edit, or delete a project, add a resource with a name, type, URL, and optional note, or move a resource to another project.
  5. In the chat, enter Yes to confirm that the knowledge transfer is complete and ready to share with the manager.

After approval, confirm that the summary reached the manager and that the manager received the completion notice. Record any edits the employee made, because the edited version is what the manager receives. The manager can then share the approved summary with the successors who will take over the departing employee’s duties.

For ongoing ownership of this check, use employee onboarding and lifecycle events best practices to place the validation within your wider journey review process.

If the expected interaction does not appear, investigate in stages. First verify the saved trigger values, then the workflow activation and Virtual Agent channel, then the journey configuration used in the test. Keep a record of the first expected outcome that did not occur. This narrows the next check without changing unrelated settings. If the conversation starts but the summary is unsuitable, preserve that distinction in the incident notes: portal access and content retrieval need different evidence.