Document access in a legal matter depends on the intake form, the person’s relationship to the matter, and when permissions are processed. With external storage enabled for All or the matter type, attached documents go to the configured external storage system. Access can be granted immediately, through scheduled processing, or on demand.
Check the storage conditions before diagnosing access
Start with the intake form used for the matter. External storage must be enabled, with All or the matter type selected, for matter attachments to be uploaded to that configured storage system. A user’s ability to open the matter record does not establish which document operations that user should have.
Legal Matter Management combines supporting documents with cross-departmental work and milestone tracking. Its record-level security helps protect sensitive matter information. Document permissions add a separate question: which person needs to read, change, or delete material, at what scope, and following which event?
For a controlled test, record the intake configuration, matter owner, assignment group, document location, and affected user’s relationship to the matter. Use nonconfidential sample documents. Keep the expected result specific: opening one document and changing an artifact are different acceptance checks.
The behavior described here applies to the Yokohama access model, also present in Xanadu. Check the configuration and behavior on your instance and release before applying this test plan. For the broader workflow context, see Legal Service Delivery.
Map document access in a legal matter to each persona
The permission model distinguishes both the operation and its scope. Matter-level access, artifact-level access, and document-level access should not be treated as interchangeable. Build your test cases around the following relationships rather than giving everyone the matter owner’s permissions.
- Requester and requested for: read access at document level begins when the legal matter is submitted.
- Group manager: read, write, and delete access at matter level begins on submission or promotion from a legal request.
- Matter owner: the person in Assigned to receives read, write, and delete access at matter level when assigned.
- Collaborators: addition to the Collaborators list grants read, write, and delete access at matter level.
- Watch list users: addition to the Watch list grants read access at matter level, without delete permission.
- Assignment group members: document permissions depend on the Assignment group permission field and are processed on schedule or on demand.
As a review exercise, compare two people on the same matter: a collaborator and a watch list user. Their shared involvement does not imply matching edit rights. Write down the expected operations before testing, so a successful read does not conceal an unintended write permission.
The matter owner can reach documents through the Documents tab of the Artifacts record in Legal Counsel Center. Start there when testing the assigned owner’s experience. Keep wider access decisions aligned with your governance, risk, and compliance security and access design.
Separate approval, task, and delegation access
Some participants need a narrower view than the people managing the whole matter. Ad hoc approvers receive read access without delete permission when approval starts. The scope follows the requested approval: it can concern the matter, an artifact, or a document. Test against the actual item being approved.
A matter task owner receives read access without delete permission to the associated artifact and to documents in that artifact. The relevant trigger is association of the artifact with the matter task or assignment of the task to a user. A task assignment should therefore be tested with its artifact relationship in place.
Delegates receive read access without delete permission, scoped to the matter, artifact, or document according to the delegated duties. For platform delegation, processing is tied to the Resolve platform delegation permissions for legal matter job, running on schedule or on demand. Granular delegation grants access when the user is delegated.
Use distinct test users for these cases. If the same person is also a collaborator, a successful edit would not demonstrate that approval or delegation granted editing rights. This is a test-design precaution: separate overlapping relationships so the result can be explained.
Distinguish permission timing from a missing entitlement
The Process External Storage Permissions scheduled job synchronizes unprocessed permissions for legal matter documents in external storage at its configured intervals. A newly eligible group member may therefore need processing before the expected document access appears. Check timing before changing that person’s relationship to the matter.
- Identify the affected document and the operation that fails.
- Record the user’s persona and the event expected to grant access.
- Check whether that event has occurred, such as assignment or addition to Collaborators.
- For assignment group members, inspect Assignment group permission rather than assuming a fixed access level.
- Determine whether the permission depends on scheduled processing or on-demand processing.
- Repeat the same document operation after the relevant processing and record the outcome.
Users added to a matter can request on-demand document access when they need it before the scheduled job runs. Treat this as a route for processing the user’s permissions, not as a reason to expand their responsibilities. The request procedure above applies to legal requests. It does not show how a matter owner works on the matter screen, so test the matter owner’s path separately.
Record the relationship change, processing route, and observed result together. Those details help distinguish a timing issue from an incorrect permission expectation. For a broader approach to tracking access outcomes, see instance security and access control metrics.
Keep legal request permissions separate from matter permissions
A matter can be promoted from a legal request, but the two access models have differences. On a legal request, the requester and requested for have read, write, and delete rights on their own documents and read access to documents attached by the legal request fulfiller. The matter model gives those personas document-level read access on submission.
Delegation also needs separate expectations. Platform delegates on a legal request can receive read, write, and delete access through the Resolve platform delegation permissions for legal request job. Matter delegates receive read access without delete permission. Granular delegates have read access without delete permission in both models.
For requesting document access on a legal request, the required role is sn_lg_ops.legal_user or sn_lg_ops.legal_fulfiller. The request procedure goes through All > Legal Request > Legal Counsel Center, the list icon, then Lists, Legal Requests, and All. Open the request and use Request Access in Documents.
Keep that procedure labeled as a request action in operating instructions. Requesters can view their legal request documents through Documents on the Standard Ticket page and can delete documents they attached themselves. Avoid using the request experience as the acceptance criterion for a matter owner working through an artifact.
Verify removal as carefully as initial access
For a legal matter, the legal admin can revoke a user’s access to documents. For a legal request, the legal fulfiller can revoke that access, and the removal procedure runs under the sn_lg_ops.request_admin role. Ad hoc approvers lose access after approving or rejecting the requested item, and delegates lose access when the delegation period expires. Include these ending events in testing, alongside the events that grant access.
For the separate legal request removal procedure, the required role is sn_lg_ops.request_admin. In Legal Counsel Center, open the request through the Lists route, select users in Documents Access, and choose Remove Access. The Documents Access tab is visible only to the practice area lead, the manager of the current assignment group, and the assigned-to person.
A visibility condition and an action’s required role answer different questions. Record both when preparing support instructions. Matter-level removal requires the sn_lg_matter.matter_admin role. Legal request removal requires sn_lg_ops.request_admin. The two roles do not cover each other’s records. After a removal test, verify the affected person’s ability to open the document rather than relying on the administrator’s view.
For help planning this work, see ServiceNow implementation.
Questions for the document access rollout
Who can install Legal Matter Management?
Legal Matter Management needs Legal Request Management installed first, and Legal Practice Apps Core is required for every legal practice application. Confirm both before scheduling the install. Treat installation readiness as a separate gate from user acceptance of document access.
Where should an administrator begin configuration after installation?
Begin configuration with legal matter templates and intake forms, because the document access rules depend on how they are set. Set up those templates and finish the remaining configuration before you test access. Prepare a list of matter types and intended participant relationships first, so configuration decisions can be compared with the document access test cases.
Should demo data be used for access testing?
Build the access test cases from the relationships your matters will use, such as matter owner, collaborators, watch list users and assignment group members. Sample records in a test instance may not cover those cases. Build additional test cases around your own intended relationships rather than assuming sample records cover the access decisions you need to validate.
What should a support handover record contain?
Include the affected matter and document, expected operation, user relationship, triggering event, and processing route. Add the observed result and the person responsible for follow-up. Keep confidential document contents out of the handover when the access context is enough to investigate.