To set up the Attended Robot application for attended automations, install the Windows agent, add your RPA Hub instance in Connection Manager, sign in, and allow access. Then check the user assignment and bot process readiness before running an automation. Robot Calendar scheduling is a separate procedure for unattended robots.
Choose the attended execution model before installing
Attended Robot runs automations that need human intervention. Start by identifying the person who will use it and the desktop task that needs their participation. An attended robot maps to one user, so include that identity in your setup record rather than treating the installation as a shared background worker.
Unattended Robot is also a Windows software agent, but its execution does not require human intervention. This difference affects the setup path: a requirement to run work at planned intervals through Robot Calendar belongs to unattended execution. Installing Attended Robot does not turn an attended process into a calendar-driven unattended process.
For example, a user-assisted desktop task and a background job scheduled for a particular hour need different execution plans. Decide which behavior the business needs before arranging access or packaging the automation. The broader ServiceNow RPA capabilities help place desktop automation within the workflow design.
Prepare the Windows machine and installation access
Installing Attended Robot requires the admin role. The later connection setup lists no required role, while running an attended automation requires sn_rpa_fdn.rpa_assisted_user and snc_internal. Keep these action-specific requirements separate when arranging access.
Download and unzip the Attended Robot installation file before starting. Check available resources after the operating system, patches, and base software are installed. The installation requirements include:
- A minimum Intel processor with 1 vCPU, 4 GB of RAM, and 20 GB of free disk space.
- Recommended resources of an Intel processor with 4 vCPUs, 8 GB of RAM, and 50 GB of free disk space.
- Windows 10, Windows 11, Windows Server 2016, or Windows Server 2019.
- .NET Framework 4.7.1 or later, with DPI scaling deactivated.
- Microsoft Edge WebView2 Runtime for the ServiceNow login screen.
Check these requirements against your instance and release before deployment. Desktop In Desktop has separate execution requirements, so do not assume that meeting the installation minimum also establishes readiness for that mode.
Confirm WebView2 is present rather than assuming that Windows supplies it. Some Windows 10 releases include it by default. Resolve a missing prerequisite before troubleshooting credentials, because the login screen itself depends on this runtime.
Install and set up the Attended Robot application for attended automations
- Open Attended Robot.msi on the Windows machine.
- In Welcome to the Attended Robot Setup Wizard, select Next.
- In Select Installation Folder, keep the default folder and select Next, or choose a destination through Folder or Browse and then select Next.
- In Confirm Installation, select Next to begin installing.
- When Installation Complete appears, select Close. Check that the Attended Robot icon appears on the desktop.
Next, double-click the desktop icon to open Connection Manager. Select Add New to register the RPA Hub instance. In Add ServiceNow Instance Details, enter Name and URL for the intended instance. Use a recognizable name so that the user can distinguish environments when choosing a connection.
Mark as default controls whether that instance becomes the default connection. If you clear it, opening Attended Robot brings up Connection Manager each time. Choose this deliberately: a workstation used across environments needs a clear way for its user to recognize the intended destination.
Launch in default browser opens the login screen in the machine’s default browser. Select it if that is the intended authentication route, then select Save. Adding an instance entry records the connection details; continue through authentication and consent before treating setup as complete.
Authenticate and grant the connection permission
In the RPA Hub section of Connection Manager, select the instance. In the ServiceNow dialog box, select Proceed for the first setup. When changing the RPA Hub instance, select Connect instead. Enter the username and password, optionally choose a domain from Domain, and select Log in.
If Launch in default browser was selected, authentication appears there. Check that the selected instance and the intended user’s identity agree before continuing.
Connection Manager also asks whether Attended Robot may connect to the instance and access data. Select Allow to grant that permission. Selecting Deny prevents further progress. A completed sign-in and a granted connection permission are separate checks in the setup sequence.
For a controlled handover, record the machine, user, instance name, and outcome of the connection test. Keep passwords out of the handover record. The aim is to give support enough context to reproduce the user’s route without passing around their credentials.
Check bot process readiness before the first run
A working connection does not establish that an automation is ready to execute. Before testing, check that a package has been created and that robot licenses are available. The bot process must have Process Type set to Attended, its life cycle stage status must be Published, and the executing robot must have life cycle stage status In-Use.
Assign the attended user or a group to the attended bot process. Also check sn_rpa_fdn.allow_rda_robot_auto_assignment. When this property is false, an attended robot record must already exist for the assigned RPA Assisted User. When true, an attended robot license must be available for automatic record creation when the automation executes.
Run the test as the intended user with sn_rpa_fdn.rpa_assisted_user and snc_internal. In the Attended Robot dialog box, choose the attended bot process and select the Run icon. Use a test case with an expected outcome that the user can recognize, including the point where their participation is needed.
If the first run cannot start, check the process type, life cycle values, assignment, and license availability before changing the workstation installation. Record which prerequisite failed and have its owner resolve it. This keeps a missing RPA Hub configuration from being mistaken for a local installer problem.
Check both execution and the resulting business data. A run that starts successfully may still need validation of the information entered or produced. Agree on that acceptance check before handing the workstation over. For broader operational measures, see Integration Hub KPIs and metrics.
For help planning the rollout, see ServiceNow implementation.
Handle scheduling as a separate unattended configuration
Robot Calendar creates schedules for unattended robots. Before using that route, create a robot with Robot Type set to Unattended, connect it to an unattended bot process, and check that the process is not Retired. This is a separate configuration decision rather than another step in attended workstation setup.
Creating a calendar schedule requires sn_rpa_fdn.rpa_release_manager, sn_rpa_fdn.rpa_developer, sn_rpa_fdn.rpa_support_user, or sn_rpa_fdn.rpa_admin.Either the RPA developer (sn_rpa_fdn.rpa_developer) or the RPA support user (sn_rpa_fdn.rpa_support_user) must appear in the associated bot process’s Managed by Group list. Do not extend these scheduling permissions to the attended execution action.
Navigate to All > Robotic Process Automation > RPA Hub Workspace. From Lists, open Administration, then Robots, open the robot, and select Robot Calendar. Select New Schedule, choose the bot process, and continue to its schedule form. Selecting a Published process prompts a change to In Maintenance.
Use Preview to inspect schedule conflicts before saving. Save stores the schedule; Save and Publish also publishes the bot process. Review the execution model again if an attended setup request has become a scheduling request.For broader integration planning, see Integration Hub for technology and software.
Questions about setup edge cases
Why did a new connection profile disappear from Design Studio?
If RPA Desktop Design Studio is open when a profile is added in Attended Robot Connection Manager, the profile does not appear in Design Studio’s Connection Manager. Adding a profile there can overwrite the entry. Restart Design Studio after adding the Attended Robot profile.
Why is an assigned automation absent from the selection list?
Bot processes with Embedded Task Automation enabled do not appear in the Attended Robot selection list. Check that setting when investigating an absent process rather than repeatedly reinstalling the agent.
Can the user keep working while an automation runs?
Desktop In Desktop runs an automation in a desktop session and supports simultaneous work. Two limits matter here. On a machine running Zscaler, the main session loses its connection when Desktop In Desktop starts, which can leave the robot unresponsive. On Windows 10 or Windows 11, Credential Guard can prompt for credentials unexpectedly. Its icon appears when Enable Desktop In Desktop is selected on the Bot process form. Assess its infrastructure requirements before choosing this mode.
How can the user stop a running attended robot?
Select the stop icon, then select Yes in the Confirmation dialog box. Include this action in user handover so that the person knows the supported stop sequence before their first business run.