OBLYTECH Logo
OBLYTECH Logo

Check vulnerabilities in a software bill of materials

To check software bill of materials vulnerabilities in ServiceNow, review the components from an uploaded SBOM in SBOM Workspace. Install and activate SBOM Response, Vulnerability Response, and the NVD and CWE jobs needed for vulnerability data. Then look at the component findings, confirm that enrichment has run, and pick which findings should become application vulnerable items.

Prepare the applications before checking component findings

An uploaded file gives you a list of components to look into. To see their vulnerabilities and enhanced vulnerability data, the supporting applications and integrations must be in place. Treat installation, ingestion, enrichment, and remediation as separate checkpoints. A good upload does not mean the vulnerability review is done.

In the Brazil release, activate the applications in this order: Vulnerability Response and its dependencies, Vulnerability Response Integration with NVD, Data Model for SBOM, SBOM Core, and SBOM Response. Vulnerability Response must come before SBOM Response. Check these requirements against your instance and application release before changing configuration.

SBOM Response includes the OSV.dev and Deps.dev integrations. Activate it after Vulnerability Response, Vulnerability Response Integration with NVD, Data Model for SBOM and SBOM Core. The vulnerability-checking workflow also needs the National Vulnerability Database integration and the Common Weakness Enumeration scheduled jobs. Both must be installed and active to get enhanced data. The NVD integration is a separate subscription, so confirm you have a license before you plan activation. Have the administrator distinguish an application being present from its required jobs actually being active.

Use sn_sbom_resp.sbom_analyst for the component vulnerability review. To upload SBOMs by hand or through the REST API, the role is sn_sbom_core.sbom_ingest. The sn_sbom_core.admin role also allows uploads and SBOM data administration. Give people the access for the task they do. Upload access alone is not all the permissions they need.

If the prerequisite checks expose wider configuration gaps, the Vulnerability Response health check is a related way to review readiness.

Find software bill of materials vulnerabilities in Components

With the analyst role, go to All > SBOM Workspace > Components. You can look at vulnerability information in two ways. Use the visualization and its component list, or open one component record. Use the list to pick where to dig in. Then use the record to understand a finding.

  1. Select the BOM Entities with Vulnerabilities visualization.
  2. Review the component rows and their CVE and CWE totals. A component can have many vulnerabilities.
  3. Inspect Fixability where entries are available, so that remediation discussions include the available fix information.
  4. If the columns are missing, select the gear icon, choose Edit columns, add the columns from Available, and select OK.
  5. Open a component record from the list below the visualizations and select Vulnerabilities.

Zero totals or blank values mean the view has no vulnerability values for that component. An empty Vulnerabilities list means no known vulnerabilities are tied to the record. Before you use that result to accept a risk, find out whether the expected applications, integration runs, and component data were there for the review.

Write down the component name and the exact version you checked next to each result. A finding for one version of a library says nothing about another version. So the decision should name the version in the uploaded inventory.

Check enrichment when the findings look incomplete

The OSV.dev Integration – Comprehensive and the Deps.dev Integration answer different questions. The first brings vulnerability data for package versions into the instance. The second supplies the version data used to flag stale and abandoned components. Version age helps explain maintenance risk, but it does not replace a review of vulnerability records.

The OSV.dev Integration – Comprehensive record is installed and active by default with SBOM Response, but you must initiate it on demand from its integration record. To set it up and start it, use the sn_vul.app_configure_integrations role and go to All > Vulnerability Response > Administration > Integrations.

Imported vulnerability data for the OSV.dev Integration – Comprehensive is stored in the Application Vulnerable Entries and National Vulnerability Database Entries tables. You can see it on the Vulnerability tab of entity records and in the Libraries module. The integration sends package identifiers in batches. The batchSize parameter on the Open Source Vulnerabilities Instance record defaults to 75 package URLs per API call. Leave that default in place unless you have a specific reason to change it, because a different batch size can affect performance.

The Deps.dev Integration is installed with SBOM Response, is active by default, and is set to run weekly. It finds components in the Stale and Abandoned states. Editing its schedule needs the sn_vul.app_configure_integrations role. If the team changed the schedule, include that change when you look into missing or old version context. Check the integration record before you decide that a component has no newer version.

The Deps.dev Integration flags a component as Stale when its version is more than two major versions behind the latest published version and more than two years behind it. It flags a component as Abandoned when it has not been updated for more than two years. These limits live in the system properties sn_sbom_resp.pkg_stale_version_threshold, sn_sbom_resp.pkg_stale_threshold, and sn_sbom_resp.pkg_abandoned_threshold. You can find them under All > System Properties > All Properties. The two time limits are stored in months. The version limit is a plain number. Note the current values before you change them.

SBOM Response also has code-trigger integrations for internal workflows. Do not start those records by hand with Execute Now. Tell the comprehensive or scheduled record apart from the internal code-trigger record before you start work. Similar purposes do not make their execution methods interchangeable.

Starting with version 4.0 of SBOM Response, stale or abandoned components can show as Non-compliant in the Policy as Code Engine (PaCE) interface in the SBOM Workspace. The scheduled job that makes those results is Run PaCE policies for SBOM Response. It is off by default. Decide whether your team needs those policy results before you turn it on. It is separate from the vulnerability enrichment above.

For an incomplete result, collect a short chain of evidence: the uploaded inventory, the component version, the integration record that applies, and the findings now shown on the component. This gives the administrator a specific data path to investigate. A general report that “the SBOM has no vulnerabilities” conceals which checkpoint needs attention.

Use component context to decide what needs action

Select All Components, then open a record with its Name link. The component can show Stale, Abandoned, and Vulnerable under its name, alone or together. Review the current version, the latest published version, and the version history in the right panel. This shows you the version you are assessing.

Use the record tabs to build the review. Overview gives component details. Hashes shows imported hashes. BOM Entities shows the linked entities. These views help tie a library finding to the submitted inventory. They also let reviewers split a question about what a component is from a decision about how to fix it.

In Vulnerabilities, look at the vulnerability identifiers, summaries, and related details. CVE details are grouped by severity. CWE entries are broken down by how likely the component can be exploited. A vulnerability identifier can open the enhanced record in Vulnerability Response or Application Vulnerability Response. The AVIs tab on the same component record lists any application vulnerable items linked to the component. They appear when creation rules match it to a known vulnerability. Check that tab before you open a new item, so the same finding is not tracked twice.

Build the handoff around the affected component version, associated BOM entities, vulnerability details, and available fixability information. Ask the application owner to assess the proposed change against their application context. The vulnerability and exposure response page covers the neighboring response work once a finding needs coordinated action.

For help planning this work, see ServiceNow implementation.

Create application vulnerable items from selected findings

Finding a vulnerability and creating a tracked application vulnerable item are two separate events. SBOM Response supports creation rules that turn matching component findings into application vulnerable items. Use this when the team needs a defined response record, not a review that ends at the component screen.

To create a rule you need sn_sbom_resp.manage_avi_rule and the SBOM Response application. Go to SBOM Workspace > AVI Creation Rules, select New, and fill in Name, Active, Execution order, Description, and Conditions. Select Save after you review the matches you intend.

Lower execution values run first. Plan the order so that findings requiring special handling are evaluated ahead of broader rules. Conditions can pick vulnerability severity, and extra conditions can narrow the match. Review a proposed rule against a known component before applying broad criteria to an entire uploaded inventory.

The rule runs on its own after the next upload. It can also run on demand from AVI Creation Rules with Execute Now. After creation, check the new AVI record for Source equal to SBOM and Scan type equal to SBOM-SCA. These values show that the response item came from SBOM data.

Agree who will investigate, approve a version change, and verify the replacement inventory. Technology teams coordinating application ownership can use the related Vulnerability Response for technology and software guidance when designing that handoff.