OBLYTECH Logo
OBLYTECH Logo

Import threat intelligence feeds

To import threat intelligence feeds into ServiceNow TISC, configure the source, choose its ingestion settings, enable it, and check the resulting records. The CrowdStrike feed imports Falcon Intelligence indicators, actors, reports, malware, and vulnerabilities with their context. Start with explicit record types and filters so the first run has a clear acceptance test.

Plan the threat intelligence feeds import

The CrowdStrike integration sits under Workspaces > Threat Intelligence Security Center > Integrations > Custom. Configuring the premium feed requires sn_sec_tisc.admin. Its initial state is disabled, so finding the card does not mean ingestion has started. The steps here reflect the Brazil release. Older releases such as Xanadu show different feed scopes and menu paths, so confirm the path on your release before making changes.

Decide which intelligence your analysts need before entering credentials. Indicators become observables in TISC; actors become Threat Actors; reports, malware, and vulnerabilities map to their corresponding entities through matching attributes. A successful observable import therefore does not establish that the other selected entity types arrived correctly.

Write an acceptance checklist for the initial run. Include a known source record for each selected type, the intended ingestion start time, expected associations, and the person who will review the result. Choose examples that satisfy your filters. Otherwise, an intentionally excluded record can look like an ingestion failure.

Keep the source selection decision separate from distribution decisions. The page on threat intelligence feeds and sharing helps frame what happens to intelligence after it reaches the repository.

Connect the CrowdStrike feed with the right access

Open the CrowdStrike Feed form and select Edit, then Details. Enter the Client ID and Client Secret associated with the CrowdStrike API client. The required scopes cover Indicators (Falcon intelligence), Actors (Falcon Intelligence), Reports (Falcon Intelligence), Malware Families (Falcon Intelligence), and Vulnerabilities (Falcon Intelligence).

Check the client’s scope assignments before investigating missing entity types. For example, receiving indicators while expecting malware calls for a review of both the selected ingestion types and the Malware Families scope. Treat credentials and ingestion selections as separate parts of the setup checklist.

Use the feed’s scheduling configuration to decide when ingestion begins. Run defaults to On Demand in new feed configuration. Fetch Data From establishes the initial time boundary, with subsequent scheduled runs retrieving incremental data. Choose the boundary deliberately: a narrow window makes review easier, while a broader window supports a historical intake that needs more validation.

For CrowdStrike, the feed retrieves entities updated after the configured ingestion time. Compare a missing record’s update time with that boundary before widening filters. This prevents an administrator from changing a relevant filter when the record actually falls outside the requested period.

Set record types and indicator filters deliberately

Select Additional Settings and then Edit Settings. Under Select record types to ingest, choose Indicators, Reports, Actors, Malware, and Vulnerabilities as required. Leaving record types unselected brings in all record types. Make a deliberate selection when the first run needs a narrower scope.

Configured filters operate together. An actor requirement combined with a report requirement narrows the qualifying set to indicators satisfying both conditions. Review the combined rule as a sentence before saving it: which indicators should pass, and which example should fail?

  • Use Indicator types to ingest to restrict the source indicator types. An empty selection retrieves all available types.
  • Use Malicious confidence of indicators to ingest to select source confidence levels. Leaving it blank includes indicators regardless of malicious confidence.
  • Use Targeted industries of indicators to ingest when the source’s industry associations are part of your selection criteria.
  • Select Fetch indicators only if actors associated to it when an actor relationship is required, and enter comma-separated names under Ingest indicators only associated to these actors where you need a named subset.
  • Apply report and malware family association filters when those relationships form part of the intended intake.

Indicators reach TISC as observables of a fixed set of types: SHA256, MD5 and SHA1 hashes, URLs, domains, IP addresses, mutex names, file names, email addresses, usernames, and IP address blocks. Threat actors, reports, and malware families are mapped to their own TISC records by matching attributes, so the indicator filters above govern only the indicators. If you leave the indicator type selection empty, every available type is retrieved, and a broad first run is harder to validate than a narrow one.

For troubleshooting, retain one accepted indicator and one excluded indicator in the review checklist. Explain the filter decision for each. If reviewers cannot account for the difference, simplify the proposed conditions before expanding the feed.

Selecting Include deleted indicators for ingestion has a specific consequence: deleted indicators become observables only if they were previously ingested, and indicators removed from CrowdStrike receive the Deleted in CrowdStrike tag. Do not treat that selection as a way to collect an unrestricted historical inventory of deleted intelligence.

Map confidence and narrow vulnerability intake

The Mapping of Indicator Malicious confidence to TISC confidence section maps High, Medium, Low, and Unverified to values from 0–100. Agree on these values with the analysts who use confidence in prioritization. Preserve the distinction between source confidence and your team’s interpretation of that confidence.

A matching malicious confidence mapping in Additional Settings overrides the confidence entered in Details. If an imported indicator has an unexpected confidence value, inspect this mapping before changing the general feed value. Otherwise, repeating the ingestion can reproduce the same result.

Vulnerability intake has its own controls. These include Severity of vulnerabilities to ingest, Exploit status of vulnerabilities to ingest, CVSS v3 severity of vulnerabilities to ingest, and CVE IDs of vulnerabilities to ingest. Empty selections for these filters leave the corresponding attribute unrestricted.

Minimum CVSS v3 base score is a strict boundary: vulnerabilities must have a score above the entered value. Include an example at the boundary in your review so that a missing equal-score record is interpreted correctly. Published-date filters can constrain a period when both date fields are populated.

Association filters can require actors, threats, products, or vendors and can narrow intake to named values. CrowdStrike threats correspond to malware in TISC. Keep that terminology difference in the acceptance checklist so analysts examine the correct destination entity.

Each vulnerability association filter works as a pair: a checkbox that limits intake to vulnerabilities with associated records of that kind, and a comma-separated name field that narrows the match further. With the name field empty, the checkbox alone decides which vulnerabilities pass, so test the two controls separately in your checklist.

Record the reason for the confidence and vulnerability choices in your threat intelligence governance model. This gives future reviewers a basis for changing them.

Enable ingestion and validate the stored intelligence

Select Update in the Additional Settings dialog to save the filters, then select Enable for the CrowdStrike feed. Enabling makes configuration fields read-only and hides Save. To revise the configuration, disable the feed, make the change, and enable it again.

Review Integrations Run for execution details. Then examine the imported intelligence against your acceptance checklist. Start with entity types and source update times, move to filter decisions, and finish with mapped attributes and relationships. This order separates an excluded record from an incorrectly represented record.

CrowdStrike relationships can connect entities from the same feed and ingestion, the same feed across different ingestions, or different CrowdStrike feeds. An association spanning runs is therefore not automatically a duplicate error. Check source provenance before deciding that related intelligence is incorrect.

Additional Settings filters also apply when ingesting indicators associated with previously imported indicators, reports, or actors. If a report arrives without an expected indicator, test that indicator against the configured filters. The presence of a parent or related entity does not remove those restrictions.

Once acceptance checks pass, decide which recurring reviews belong in threat intelligence automation. Keep ownership of failed runs and unexpected changes explicit before increasing unattended intake.

For help planning this work, see ServiceNow implementation.

Change the feed without losing the review trail

Duplicating a threat intelligence feed requires sn_sec_tisc.admin. In the Catalog view, select the integration and open Edit on its card. Make the required configuration changes, then use More Actions > Duplicate. The new feed receives a name such as CrowdStrike Feed-copy.

Duplication carries the configuration and associated observables, indicators, and actors. Record which feed is intended for continuing ingestion and how reviewers will distinguish the copy. A copied configuration still needs a separate acceptance decision; matching settings do not establish that its intended use is appropriate.

Before changing an established feed, record its current settings and the reason for the change. Use common threat intelligence mistakes as a review prompt for operational handover.