OBLYTECH Logo
OBLYTECH Logo

Configure threat intelligence external sharing

Configure threat intelligence external sharing by defining outbound sharing controls, creating a template with Automated addition to TAXII Collections, selecting the destination collections, and connecting that template to an automated flow. The flow adds matching intelligence records to those collections for trusted partners. Review included fields, related records, and redaction before activation.

Plan threat intelligence external sharing around the collection

Start with the intelligence a partner should receive and the collection that will hold it. Automated collection population and recipient access are separate configuration concerns. Access to each TAXII collection is set on the collection record. Either every user with the TAXII Server API role can read it, or only the users named in Read Access can; adding a record to a collection is therefore one part of the distribution design.

Write a short sharing decision before changing settings: identify the permitted record types, the qualifying conditions, the destination collections, and the information that must stay private. Use that decision to review the template and flow together. A correct trigger cannot compensate for a template that includes unwanted attributes.

Keep the inbound workflow separate. Receiving intelligence through inbound profiles does not configure the outbound action that populates TAXII collections. For the surrounding exchange model, see threat intelligence feeds and sharing. Check labels and available behavior on your instance and release before applying this Brazil-based sequence.

Review the main sharing controls before building a template

Configuring Outbound Intel Sharing Controls requires sn_sec_tisc.admin. Navigate to Workspaces > Threat Intelligence Security Center > Administration > Outbound Intel Sharing, then select Outbound Intel Sharing Controls. The base control starts in the Published state and defines the entities available to templates.

Review the included entities and their required and optional attributes. Observables, indicators, and objects are included in the base configuration. Treat this as the upper boundary of what a template can expose. An entity removed here is unavailable for selection in templates, and removing it also removes it from templates that already include it.

  1. Inspect the main control and identify whether the intended record types are available.
  2. If changes are needed, review dependent templates and pending outbound sharing records before selecting Edit.
  3. Disable associated automation flows before changing the settings they depend on.
  4. Review entity attributes, make the agreed changes, and select Publish.

The editing workflow warns about dependent templates, pending sharing records, and automation failures. Resolve those dependencies as part of the change rather than treating the warning as routine. Removing optional attributes also affects corresponding templates. For wider ownership decisions, use the threat intelligence governance model.

Create a template for automated TAXII collection addition

Creating an outbound sharing template requires sn_sec_tisc.admin. Navigate to All > Workspaces > Threat Intelligence Security Center, select the Administration icon, go to Outbound Intel Sharing, and open Outbound Intel Sharing Templates. Select New and give the template a name and description that identify its intended distribution purpose.

Set Usage Mode to Automated addition to TAXII Collections. This mode exposes TAXII Collections so you can choose the destinations used by the automated action. Do not substitute Automated Sharing simply because the process runs in a flow: the template distinguishes automated sharing from automated addition to collections.

Review the following settings against the sharing decision:

  • TAXII Collections: choose the collections intended to receive the selected intelligence.
  • Enable Redaction: decide whether sensitive information should be replaced during sharing.
  • Default Confidence (0 – 100): provide a fallback for records without their own confidence value.
  • Override TLP: decide whether payload generation should use a specified Traffic Light Protocol value instead of individual record values.
  • System Settings for Sharing: inspect the selected outbound controls and exclusion rules.

Default confidence fills an absent value; it does not describe a blanket replacement of confidence already present. Override TLP has a different purpose: when selected, its specified TLP overrides record-level TLP during payload generation. Keep those effects distinct when reviewing what a partner will receive.

Select Save, then review Template Sharing Controls after the outbound controls have been copied into the template. For help planning this work, see ServiceNow implementation.

Publish and enable a complete sharing template

Within Template Sharing Controls, inspect the entities and attributes rather than assuming the inherited selection matches the partner agreement. Select Add to open Add Entities and Attributes when needed. The available entities depend on the main sharing controls. Use the template to narrow the information selected for this distribution purpose.

Required STIX attributes constrain that selection. Removing too much can produce a validation warning and prevent payload generation or sending. Preserve the required attributes while deciding which optional attributes belong in the shared record. Select Publish after completing the template sharing controls.

A published template is not necessarily enabled. Missing sharing controls can allow saving and publishing while preventing enablement. Main controls left in draft also prevent enablement. Check both levels before connecting the template to an operational flow; otherwise, a visible template can still be incomplete for use.

Enable and Disable appear for published templates. Review the enabled state explicitly, then record the chosen collections and fields in the change record. When diagnosing configuration gaps, the common threat intelligence mistakes guide provides a broader review path.

Connect the automated action to the intended records

Creating or editing the automated TAXII flow requires System Administrator. The sn_sec_tisc.admin role can view it. Navigate to All > Threat Intelligence Security Center > Administration, select Automated Flows, and open Automatically add threat intelligence to a TAXII collection. Inspect the rule details in the flow designer before making changes.

The supplied example triggers when an observable is created or updated. It combines IP address or domain types with the Add to: Sample Collection tag, Malicious reputation, and a threat score of at least 60. Treat these as the sample’s conditions. Choose conditions that express your approved sharing criteria instead of treating that score or tag as a universal requirement.

  1. Review when the flow runs and which records satisfy its trigger.
  2. Under Actions, select the template configured for automated addition to TAXII Collections, using the input label shown in the flow designer on your instance.
  3. Provide the relevant Observable Record, Indicator Record, or Object Record input for the action.
  4. The TAXII flow does not list an Include Related Records option. Check the action inputs in the flow designer on your instance before deciding whether related indicators and objects are added. Where the option does exist on the sharing flow, it adds related records of the selected observables, including indicators and objects.
  5. Select Done, complete the review, and activate the flow.

The action uses its input record and the collections configured in the selected template. Where your flow designer offers an Include Related Records option, it expands the addition to related records of the selected observables, including indicators and objects. Review that expansion deliberately: a narrowly selected observable can carry relationships that deserve a separate disclosure decision.

Document why the trigger qualifies a record and why the selected collection is appropriate. This makes later changes easier to assess when detection scoring, tagging practices, or partner needs change. Consider adjacent threat intelligence automation opportunities after this distribution path has passed review.

Validate the result before widening the trigger

Use a controlled validation set: one record that should qualify, one that should fail a trigger condition, and an observable with related intelligence. Compare the expected collection membership with the resulting records. Check the destination as well as the record content; successful flow execution alone does not establish that the right collection received the intended information.

Inspect optional attributes, confidence, TLP, and any redacted values in the resulting intelligence. Where Include Related Records is selected, check the related indicators and objects too. Record the expected and observed results so that a future template change can be assessed against the same sharing intent.

Changes to the outbound sharing controls are recorded, and each entity that is created, modified or deleted posts a work note to the activity stream. Confirm on your instance which audit records cover outbound share records before relying on them for acceptance. Include audit review in acceptance, alongside collection membership and recipient access. Agree who reviews those records and handles changes to partner access. Expand the qualifying conditions after the narrow test supports the intended distribution.

Questions about maintaining collection sharing

Can an existing template be cloned for another partner?

Duplicate creates a copy of the template and its associated sharing controls. Review the copied configuration before using it for a different partner, particularly where the new relationship requires different destinations or disclosure choices.

What should happen before editing an active template?

Check for pending outbound sharing records and disable dependent automation flows before editing. The template editing workflow warns that changing it while dependent flows remain active may cause errors. Plan the review and reactivation as part of the same change.

Can outbound profiles be managed together?

Yes. With sn_sec_tisc.admin, Outbound Intel Sharing Groups lets you add enabled profiles through Group Members and make the group active for sharing. This supports collective profile management where the distribution design uses profiles.

Do on-demand template access roles define automated flow editing access?

The template’s user and group access settings refer to sn_sec_tisc.int_exch_write for On-Demand Sharing. Apply the separate automated-flow role requirements when assigning people to view or change the collection automation.