To create a threat intelligence report in ServiceNow TISC, choose a published intelligence report template, add relevant Threat Intelligence Library records, save the content, preview it, and publish. Use a case report when the report must follow a specific investigation; use an intelligence report when the findings stand independently of a case.
Choose the right threat intelligence report context
Start with the decision the report should support. An investigation update needs a clear account of the case and its evidence. A broader intelligence assessment may combine actors, indicators, malware, or other library objects without belonging to one case. Choosing the context before drafting prevents a mismatch between the template and the information the analyst expects to insert.
Case Reports draw from the selected case, including its fields, related records, and intelligence. Access follows the case: users and groups need permission to access that case before they can view or interact with its reports. This matters when an investigation contains information that should remain within the case team.
Intelligence Reports use intelligence from the library without requiring a case. Their editor does not show case-specific fields or records. Analysts assemble content through library lists, record selection, slash commands, and table insertion. Choose this context when the subject crosses investigations or when there is no case to select.
A Threat Report library object serves a different purpose. It groups related threat intelligence as a STIX 2.x object with a name, description, and references to other STIX objects. Creating that object is distinct from generating a template-based intelligence report for publication and PDF distribution.
Prepare templates before the analyst starts
Configuring report templates requires sn_sec_tisc.admin. Creating an intelligence report requires sn_sec_tisc.analyst. Keep template ownership and analyst preparation clear so that a missing template can be investigated at the right point. Check the labels, permissions, and availability on your instance and release; the workflow described here follows Brazil.
TISC includes templates for several audiences and reporting purposes. Executive Summary is aimed at senior decision makers and strategic risk, with the emphasis on reasons and implications rather than technical detail. Case Status Report – Threat Actor Profile supports updates during an investigation. Post Investigation Summary – Threat Actor Profile supports the account of findings after investigation.
The intelligence options include Threat Intelligence – Alert, Threat Intelligence – Tipper, and Threat Intelligence Report – Periodic Intelligence Report. Select an alert-oriented format for a defined notification need, a tipper for timely intelligence relevant to the business, or a periodic format for a recurring overview. Decide what the recipient needs to do before choosing the layout.
The supplied templates are published and read-only by default, but they are also turned off. Analysts cannot generate reports from those disabled templates. A published state therefore does not by itself establish that a template is ready for analyst use. Treat availability as a preparation check before asking an analyst to produce the first report.
Editing a template that is already published opens a confirmation that you are changing a published template and must republish it before it appears under Case Reports. Make the content field or related list changes, select Save Content, and then select Publish. A preview is available before publishing.
For case reports, templates can include custom case task form fields and related lists. Review which information belongs in the output before changing its structure. Agree on required sections and audience boundaries through a threat intelligence governance model, especially where different teams maintain the case and approve the report.
Create an intelligence report from the library
- Navigate to Workspaces > Threat Intelligence Security Center > Threat Intel Library.
- Select Reports > Intelligence Reports to open the report list.
- Select New Intelligence Report, enter a report name, and select Next.
- Choose the required published intelligence report template.
- Work in the editable Report Content tab that opens for the generated report.
No case selection is required for this workflow. Before proceeding, compare the chosen template with the intended audience and subject. A report name should help a reviewer distinguish the assessment from a similarly named library object or a previous reporting period. Include enough context to find the correct output later without placing the full conclusion in its name.
Build the narrative around an assessment, the evidence supporting it, and the action or decision it informs. For example, an actor assessment might explain relevant behavior and then connect that assessment to selected indicators and malware records. Treat this as an editorial plan: choosing records does not replace explaining why those records matter.
For help planning this work, see ServiceNow implementation.
Add records and dynamic content deliberately
Within Report Content, use the Expand icon to insert additional content such as Observables or Indicators. Type / to open slash commands for dynamic content. The available capabilities include inserting a record count, selecting a specific record or field, and selecting a system user. Choose the information needed to support the assessment rather than filling the report with available data.
Mention Count inserts the total record count for a selected supported table. Supported tables include Observable, Indicator, Threat Actor, Malware, Threat Report, and Vulnerability, among others. Review what the count represents before describing it. A table total should not be labeled as the number of findings in a particular investigation unless that interpretation has been established.
Record selection lets the analyst choose intelligence records and insert field values. When selecting evidence, check whether the record describes the subject under discussion and whether the chosen field conveys enough context. A short field value can be accurate while still being unclear to a recipient who cannot see the surrounding library record.
Select a User inserts a chosen system user. Use it where identifying a person adds meaning, such as clarifying who should review an assessment. Keep the narrative understandable when read as a document outside the editor. A recipient should not need to reconstruct why a name, count, or object appears.
Apply threat intelligence best practices when deciding which evidence deserves space. Keep supporting detail proportionate to the decision, distinguish observed facts from analytical judgment, and state uncertainty where it affects the recommendation.
Save, preview, and publish the report
Select Save Content to retain changes to the report body and enable Publish. Select Save Details to save report details. Review both parts before publication: a complete narrative with an unclear report name is difficult to retrieve, while saved details do not substitute for saving changes to the content.
Select Preview to generate a PDF preview of the current content. Review it as the recipient would read it. Check section order, the context around inserted records, and whether the conclusion follows from the evidence shown. Use Popout if working in a separate window helps with editing or reviewing the report.
Select Publish when the content is ready. A confirmation message appears before publication. Published reports are read-only. Where further editing occurs, republish before downloading or sharing the revised report. Approve the published PDF rather than the draft in the editor. Republish after any late edit, because the published report is read-only. To reuse an earlier report, select Duplicate from the report overflow menu or the list view. The copy starts in Draft, so give it a distinct name and review carried-over findings before treating it as a new assessment.
A report that will not publish usually means Save Content was skipped after the last edit, so the Publish option stays unavailable. A report that cannot be generated usually means the template is still turned off. Check those two before changing permissions. Include these distinctions in your review of common threat intelligence mistakes so analysts can identify the failed step before changing unrelated settings.
Retrieve and distribute the published output
Intelligence reports appear in the All Reports and Intelligence Reports views. To retrieve one, return to Reports > Intelligence Reports and open the required report. Select Download for the published PDF. Select Share to distribute the report by email, enter the recipient, and select Send. Preview is available before sharing.
The View Intelligence Reports procedure lists the required role as sn_sec_tisc_analyst, while the creation procedure lists sn_sec_tisc.analyst. Preserve that distinction when checking access with an administrator rather than assuming the two spellings represent the same assignment.
Before distribution, check the recipient against the intended audience and the sensitivity of the information included. For a case report, review the case permissions as well. Make report naming, review responsibility, and distribution checks part of the threat intelligence implementation roadmap before scaling recurring production.