OBLYTECH Logo
OBLYTECH Logo

Manage business continuity issues from the workspace

To manage business continuity issues without opening a plan, use the List view in Business Continuity Workspace. The Issues, Issue remediation tasks, and Issue triage modules bring separate work queues into the workspace. Browse the relevant state filter, review existing records, or select New in the Issues list toolbar to create an issue.

Start with the right list for managing business continuity issues

Begin in Business Continuity Workspace and use its List view. Choose the module that matches the work you need to inspect. An issue describes the problem being tracked; a remediation task is work created against an issue; triage records are listed in their own Issue triage module, filtered to records classified as BCM. Treating these as separate queues helps you ask a precise question before opening a record.

The Issues module brings together issues associated with continuity plans and events. This is the starting point for reviewing problems across those records, rather than moving through individual plans to find their Issues related lists. Use this wider view when preparing a review of outstanding continuity concerns or checking whether a previously identified problem already has a record.

Check these module names, dependencies, and permissions on your instance and release. The workflow described here follows the Brazil behavior. GRC: Profiles is a prerequisite for issue management; the integration also involves GRC: Issue Management, while GRC: Advanced Core provides issue triage. A missing module should prompt an application and access check before anyone concludes that its records are absent.

Browsing existing issues first shows whether a finding is already recorded

  1. In List view, select Issues.
  2. Choose New, In progress, or Closed to display the matching issues.
  3. Review the relevant existing issue before deciding whether the finding requires another record.
  4. To create an issue directly from this module, select New in the list toolbar.

The word New appears in two different contexts. As a state filter, it narrows the records you see. In the list toolbar, New starts creation. Keep that distinction clear when explaining the workflow to someone who is learning the workspace; asking them to “select New” without naming the location can lead to the wrong action.

Before creating a record, prepare a short account of the observed gap, the affected continuity activity, and the evidence that would let another person investigate it. These are recommended preparation steps, rather than a claim that the creation form contains particular mandatory fields. Describe the actual observation separately from the proposed fix so that a reviewer can assess the problem without accepting an untested solution.

For example, a continuity exercise might reveal that a recovery handoff depends on information the receiving team cannot access. Record what information was unavailable, when the handoff was attempted, and which recovery activity was affected. Avoid turning an uncertain cause into an established fact. A clear description makes the issue easier to evaluate and helps the next reviewer decide whether it duplicates an existing finding.

Review remediation tasks and triage as separate queues

Select Issue remediation tasks when the question concerns work created against issues. Its state filters are Open and Closed. Start with Open when preparing an action review, then inspect the relevant task records. Keep the discussion about the task’s work and its connection to the issue, rather than treating the task list as another copy of the issue list.

A closed remediation task and a closed issue are different records. When checking progress, review the issue as well as the work attached to it. As a team practice, ask whether the completed action addresses the described gap and what evidence supports that judgment. A task status alone is a weak basis for deciding that the wider continuity problem has been resolved.

Select Issue triage for triage records classified as BCM. The available filters are Unassigned and All. Use Unassigned to inspect records that need attention to assignment, and All to broaden that review within the module’s scope. All refers to the module’s BCM triage records; it should not be interpreted as a list of unrelated records across the entire platform.

The triage module requires GRC: Advanced Core. If it is missing, ask the administrator to check that dependency and the user’s access. Do not create replacement issues merely because a reviewer cannot see the triage queue. First establish whether the problem is module availability, permissions, or the absence of a matching record.

When a list appears unexpectedly empty, check the selected state before escalating. Compare the question being asked with the filter currently in use, then check access and application availability. Record the module and filter when asking for help so the administrator can investigate the same view.

Issue access depends on the role and on the action attempted

Issue access differs by role. The roles sn_bcp.plan_contributor and sn_bcp.plan_manager have read, write, and create access to issues. The role sn_bcp.plan_viewer has read access. The roles sn_recovery.event_manager, sn_recovery.event_user, and sn_bcm.program_manager have read, write, and create access. Use those distinctions when checking whether a person should be reviewing records or creating and changing them.

With GRC: Profiles installed, those roles contain sn_grc.compliance_assurance_user, except sn_bcp.plan_viewer, which contains sn_grc.compliance_assurance_reader. Inspect the role records when investigating inherited access. A user’s ability to open a continuity workspace does not by itself establish that the user can perform the next issue action.

Adding or creating an issue through a plan also requires write access to that plan. A plan, recovery event, or exercise in a state that prevents edits, such as Archived, cannot be used for that association action. This matters when someone can inspect an issue from the list but cannot add it to the intended continuity record.

The list of issues you can add from a plan shows only active issues to which you have access. If an expected issue is missing from that list, check its state and your access before assuming it was never recorded.

For help planning this work, see ServiceNow implementation.

Verify the connection to continuity records

Creating an issue from the workspace list and creating one from a plan are different starting points. When an issue is created from a plan, its classification is Business continuity management, and that plan supplies the primary source and source reference. Do not assume that selecting New in a general list establishes the intended plan relationship. Inspect the resulting issue and its connected records.

When GRC: Issue Management is installed, the issue record presents Plans, Crisis events, and Exercises as separate tabs under Impacted items. These tabs have Add and Remove actions. Linking a plan does not link an exercise or crisis event at the same time. Check the appropriate tab for the continuity record you mean to associate.

With GRC: Profiles alone, the corresponding related lists appear on the classic issue form. A later linked plan or event becomes a secondary source. Keeping these relationships accurate helps a reviewer understand why one issue is relevant to several continuity activities without manufacturing duplicate issue records for each activity.

The first plan or event that an issue is created from becomes its primary source. Each further plan, event, or exercise you link afterward is recorded as a secondary source. When you review an issue later, that distinction shows which continuity record first surfaced the problem and which ones picked it up afterward.

Unlinking works the same way in both directions. Removing an issue from a plan’s Issues related list removes only the association, and removing a plan or event from the issue record removes only that link. The issue, plan, and event records all remain. A wrong link is therefore corrected by removing the association, not by deleting anything.

Recovery events and exercises support the same association as continuity plans. From an event or exercise record, the Issues related list lets you create an issue or add one that already exists. A new issue receives the same Business continuity management classification and source reference as one created from a plan.

BCM administrators can group related lists into a vertical layout that keeps linked records together under the Impacted Items section. The Record page vertical template and GRC: Issue Management provide that layout, so a reviewer can reach connected plans, events, and exercises without scrolling through a traditional horizontal page.

Use the same relationship check when adapting the workflow to a particular operating environment. The surrounding planning context differs across business continuity management for healthcare, business continuity management for financial services, and business continuity management for energy and utilities. Keep the issue description tied to the actual recovery activity and the affected record.