OBLYTECH Logo
OBLYTECH Logo

Attest controls with an assessment method in the Compliance Workspace

A control that needs evidence every cycle can be attested through an assessment instead of the classic method. Set the objective’s Attestation method to Attestation, check the inherited fields on its controls, and assessments start when a control enters Attest.

Prepare Compliance Workspace control objectives for attestation

Start with the objective that defines the requirement, then inspect the controls that implement it. An objective supplies shared direction; the related controls carry the assessment work. Keeping those two levels aligned matters when a single objective produces several controls. A template change at the objective can reach associated controls, so establish the intended assessment before starting respondents’ work.

The GRC: Policy and Compliance Management plugin, sn_compliance, supplies the GRC smart assessment template. The assessment route also requires Smart Assessment core (sn_smart_asmt), Smart assessment Migration tools (sn_smart_asmt_mig), Smart Assessment Connected (sn_smart_asmt_conn), and Smart Assessment Designer (sn_smart_asmt_desg). Check that these prerequisites are present before investigating a missing assessment option.

Set the Enable smart assessments on control system property to true. Prepare the assessment template in Smart Assessment Engine, including the migration from a legacy assessment metric type where applicable. Existing objectives retain the classic assessment default; enabling the property is not a reason to assume that older objectives have switched methods. Check this behavior against your instance and release before changing an established assessment cycle.

Plan the relationship between the requirement and its assessment with compliance frameworks and control mapping. A clear mapping helps reviewers decide whether the chosen questions address the requirement represented by the objective.

Create the objective and select the assessment method

Creating a control objective requires sn_compliance.admin, sn_compliance.manager, or sn_compliance.user. Navigate to All > Policy and Compliance > Compliance Workspace, then Compliance library > Control objectives. From the Create list, select Control objective. Complete the identifying information before selecting the attestation configuration.

  1. Enter a Name that distinguishes the requirement from nearby objectives. Use Description to explain the expected behavior and scope.
  2. Record Source, Source ID, and Reference where these identifiers apply. Choose a Parent without creating a cyclic parent-child relationship.
  3. Choose Category, Classification, and Type to describe the objective. Classification includes Preventive, Corrective, and Detective.
  4. Set Attestation method to Attestation for the assessment route. Classic attestation remains the alternative choice.
  5. Review the Attestation field. Selecting Attestation populates it with GRC Attestation by default.
  6. Consider Creates controls automatically when the objective can also serve as the control, then select Save.

Do not treat a populated default as evidence that the template suits the requirement. Review what respondents must establish, which evidence the team expects, and how an answer will be interpreted. For example, an access review objective needs questions that establish whether the review occurred and what the reviewer found. That is a design decision to settle before the control reaches assessment.

The saved objective exposes its related lists. Use those relationships to check that the requirement belongs to the intended policy and citation context. Creating another objective simply to obtain a different template can make the library harder to review; first establish whether the existing requirement and assessment configuration are appropriate.

Check inheritance before moving controls to Attest

A control created from an objective receives the objective’s Attestation method and Attestation values when those fields have values. The generated control’s Attestation method is read only. Its Attestation field can select a different template, and changes to the objective are reflected in associated controls. Review the effective configuration on the controls rather than assuming that the objective form tells the whole operational story.

A control without an associated objective can have its method configured directly. For an objective-linked control, work from the objective’s settings. The assessment configuration can be updated up to the point where the control moves to Attest. Once that transition occurs, the assessment work has started, so finish configuration checks beforehand.

  • Confirm that the selected objective represents the requirement being assessed.
  • Inspect generated controls for the intended Attestation method and template.
  • Identify existing controls that still use Classic attestation before changing the objective.
  • Check whether an associated policy is published: publishing that policy makes the objective form fields read only.
  • Agree which control owner and respondents should participate before triggering their work.

A switch from Classic attestation to Attestation flows down to every control the objective has generated. Completed classic responses stay on each control’s Classic attestation list, so compare those with the new cycle before drawing conclusions.

For help planning this work, see ServiceNow implementation.

Start assessments and give respondents the right access

Moving a control to Attest triggers its assessments. Moving a control into Attest sends its owner and respondents an email that gives the deadline; the subject line names the attestation and the control number. Before starting a cycle, check the participants and the deadline as an operational review. Sending work to the wrong people creates a response problem even when the template itself is correctly configured.

Respondents holding sn_grc.business_user or sn_grc.business_user_lite find their attestations under My Attestations, reachable from the Compliance Workspace Tasks page, the Risk Portal and the Employee Center. These are respondent permissions. Template maintenance and assessment visibility have separate role requirements, so diagnose access against the action the person needs to perform.

The roles sn_compliance_ws.corporate_compliance_manager and sn_compliance_ws.it_compliance_manager can view and edit templates. The sn_compliance.attestation_creator role can create template categories and perform template migration. The sn_compliance.user role can read assessments related to the control category. In Assessment template categories, Category role defines the minimum reader role and must contain sn_smart_asmt.template_reader.

Open and Completed assessment instances both appear in the control’s Attestations related list, so that list is the first place to look when expected work is missing. Check that the expected work appears there and that respondents can reach it. A missing response and a missing assessment instance require different investigations: establish whether work was triggered before asking someone to complete it.

Review results, issues, and interrupted assessment work

A fail leaves the control non-compliant and opens an issue, or updates the Issue source on one that is already open. Once the control is in Attest, a pass clears those issues and the control reads as compliant again. Review those results alongside the assessment responses so that the status has an understandable evidence trail.

State changes can interrupt a cycle. Sending a control back to Draft, retiring it, or marking it Exempt for a policy exception all cancel its open assessments, so decide on that effect before you use any of them. If Exempt is cleared while the control remains in Attest, assessments are triggered again and the control’s Attestation section becomes read only.

Confirm that stopping the open assessments is the intended outcome before you use a transition that cancels them. Note the reason on the control so respondents and reviewers see the same status. A canceled assessment should prompt a check of the control’s state and exception context.

The objective’s Overview brings control assurance, attestations, indicators, and testing status into the review. Use its contextual mappings to understand the related policies and authority documents. For the distinction between assessment evidence and ongoing signals, see continuous control monitoring indicators. Broader validation planning belongs with risk assessment and control testing.

Questions about objective relationships and library maintenance

Can one objective support citations from different authority documents?

Yes. A single objective can map to multiple citations, allowing assessment work to support several requirements. Citation mapping requires sn_compliance_admin or sn_compliance_manager. Open Compliance library > Citations, select a citation, and use Add in its Control Objectives related list to choose the objectives.

Why might an objective be absent when linking it to a policy?

The policy association selector contains active objectives without an associated policy. Check those conditions when an expected objective is absent. The policy must be in review or draft. This association action requires sn_compliance.admin, sn_compliance.manager, or sn_compliance.user and uses Edit in the policy’s Control Objectives related list.

How should an obsolete objective be deactivated?

With sn_compliance_admin or sn_compliance_manager, navigate to All > Policy and Compliance > Policies and Procedures > Control objective. Open the objective, clear Active, and select Update. Use this action when the objective is no longer relevant to its citation or parent objective. Clearing Active and saving also retires every control generated from this objective, so check those controls before you deactivate it.

Does removing a mapped issue delete the issue record?

No. Remove in the objective’s Issues tab removes the relationship to that issue. The issue itself remains. Distinguish an incorrect relationship from an issue that needs resolution before changing the mapping; removing the association is not the same action as closing the issue.