To find roles with access to encrypted columns, use the Check role access for encrypted column skill in ServiceNow Vault. Install Vault and activate the skill first. Review the roles that can reach encryption and decryption keys before planning anonymization of encrypted columns, because anonymization changes data without necessarily changing who can read it.
Define the column and the access question
Start with a named table and column, rather than a general request for everyone who can see sensitive records. The skill identifies user roles with access to encryption and decryption keys in the instance. That makes it a focused input to a permissions review: which roles can use the key access associated with this encrypted field?
Record the table, column, business purpose, and reason for the review. A request to investigate unexpected visibility needs a different follow-up from a request to prepare an erasure job. Keep those decisions distinct in your review notes so a list of roles does not become an assumed approval to change data.
Check the encrypted field configuration associated with the column and identify its cryptographic module. Users need a module access policy on that cryptographic module that grants their role, script or process permission to decrypt. Without one, they cannot read the encrypted column’s data. Connect the finding to your wider role-based access control review when deciding whether the identified access fits the user’s work.
Prepare Vault and the roles for your release
ServiceNow Vault must be installed, and the Check role access for encrypted column skill must be active. These are prerequisites for using the skill. Treat installation, skill activation, and permission assignment as separate checks; completing one does not establish that the other two are ready.
For Brazil, running the skill requires sn_vault_console.vault_console_admin and security_admin. The security_admin role is not part of the sn_vault_console.vault_console_admin role composition and does not appear in the Elevate role list for this requirement. A user with admin must assign it through standard user administration. If the skill reports a missing role or an inactive session role, contact that administrator.
Australia lists sn_vault_console.vault_console_admin for the ServiceNow Otto skill. Zurich lists that same role for the Now Assist version. Check the requirement on your instance and release before requesting access. Do not assume the Brazil combination applies unchanged to older releases, or that an older role assignment is sufficient after a release change.
Give the review an accountable owner. The person operating the skill, the person maintaining encryption configuration, and the person approving a privacy action may have different responsibilities. Document that separation using your security roles and responsibilities so the result reaches someone authorized to act on it.
Run the encrypted-column role check
- Navigate to All > Vault > Vault console.
- In the ServiceNow Otto panel, select Check role access for encrypted column. In Zurich, use the Ask Now Assist panel.
- Specify the details for the encrypted column under review.
- Ask which roles have decryption key access to that column, including read access in the question.
- Capture the returned role names alongside the table, column, release, and review date.
Use a precise request in your own words, such as asking for the roles able to use decryption keys for the identified field. Keep a second column’s investigation separate. That makes the result easier to compare with the relevant encryption configuration and avoids treating a broad conversational answer as a field-specific access record.
Review the output as a list to investigate. For each returned role, record whether its access has a business owner and an accepted purpose. If a role looks unexpected, establish why it is present before proposing a change. The skill’s identification of key access is evidence for that investigation; it does not decide whether the access is justified.
Keep recommendations separate from executed changes. A review can end with accepted access, a request to examine a role assignment, or a request to inspect module configuration. Record which outcome applies and who owns the next action. Avoid bundling role removal into a privacy job simply because both concern the same field.
Interpret access against the encrypted field configuration
The encrypted field configuration connects a table column to a cryptographic module. For configuring encrypted fields, the Brazil role requirement is sn_kmf.cryptographic_manager or sn_kmf.admin, together with security_admin or elevation to security admin. This is a separate action from running the Vault skill, with a separate permission requirement.
Navigate to All > System Security > Field Encryption > Field Encryption Experience > Modules, then select Create new. Confirm you are in the same application scope as the table, then complete the Encrypted Field Configuration form: Type, Table, Column, Active, and Crypto Module. When creating or inspecting a configuration, pay attention to Type, Table, Column, Active, and Crypto module. Work in the correct application scope so the relevant tables are visible.
Interpret the field’s display carefully. Field access is governed by module access policies. Without a module access policy that grants a user, script or system process access, that party cannot encrypt or decrypt data in the module. Check those policies before concluding who can read the column, and do not infer read access from the ability to edit the field.
Use the Key Management Framework overview when the investigation moves from the returned role names to module administration. Keep the review centered on the column’s actual module rather than assuming a table-level business role explains all encryption access.
Also distinguish permissions from encryption coverage. Activating encryption for a column encrypts new data inserted afterward. Existing data requires a separate mass encryption job. A satisfactory role review does not establish that older values have already been encrypted.
Use the findings before anonymization of encrypted columns
For a CLE-encrypted column, anonymization decrypts the value, applies the selected anonymization technique, and encrypts the resulting value before storing it. Users who had access before the job retain visibility afterward. The role review therefore answers who can reach the protected data; the anonymization decision answers what values those people should subsequently see.
Before planning the job, check three prerequisites: the Data Privacy Store application is installed, the Field Encryption Starter plugin is active, and dp.job.enable_map_creation is true. Changing that property requires sn_kmf.admin or sn_kmf.cryptographic_manager. Missing prerequisites block policy activation, job creation, or scheduling, with a message identifying what is missing.
An active row encryption configuration on the same column creates a conflict. A policy containing that combination cannot be activated or scheduled. Resolve the configuration question before treating the access review as evidence that the job is ready. The distinction between a column and a row encryption configuration matters here; review the column-level encryption guidance as part of that assessment.
A Data Privacy Admin must provide explicit in-product consent before the job executes. The prompt asks for OK to acknowledge the conflict with existing encryption, and the acknowledgment is recorded for the job with the encrypted columns processed. If the intended policy leaves encrypted data unchanged, select the No Action anonymization technique instead.
Before proceeding, put the access findings, intended data treatment, prerequisite checks, and consent decision in the same review record. This gives the approver a clear view of both the people who retain visibility and the change being authorized. For help planning this work, see ServiceNow implementation.
For a repeat review, retain the earlier role list and compare it with the new result for the same column. Investigate additions and removals with the configuration owner. This creates a review trail without assuming that an unchanged field name means unchanged key access.
Questions about encrypted-column review edge cases
Can anonymization handle columns using multiple modules?
Yes. Anonymization supports encrypted columns configured with the multi-module method. In your review record, identify that configuration so the investigation covers the associated modules rather than assuming the column has a single encryption context.
Are encrypted journal fields supported?
Yes. CLE-encrypted journal fields can be anonymized and remain encrypted afterward. List the journal field separately in the planned column list so its treatment is reviewed on its own.
Does a rollback leave the restored data encrypted?
Yes. Encrypted data remains encrypted after rollback. Decrypting it then returns the original plaintext values. When assessing an erasure workflow, account for that restoration behavior before considering the review complete.
What happens if encryption or decryption fails during the job?
The failure is logged, with one error per table-column combination to prevent duplicate entries. Investigate the affected combination and establish the outcome for that column before recording the job as meeting the intended privacy action.
Can hierarchical tables be included in encrypted-column anonymization?
Yes. Hierarchical table configurations are supported. Record the table for each reviewed column explicitly so the access findings and the intended anonymization scope can be matched without relying on a parent table’s name alone.