To generate BIA reports as PDF or Word, open the business impact analysis in Business Continuity Workspace and choose Generate PDF or Generate MS Word. Download the completed file and save it for reference. Use the PDF route when you need a formatted copy for circulation, and the Word route when the recipient will edit it. The split is a working convention rather than a fixed rule, so choose whichever route fits the review.
Checking the BIA record before export prevents sending the wrong analysis
Start with the analysis you intend to distribute. In Workspaces, open Business Continuity Workspace. Switch to List view, select Business Impact Analysis, and open the relevant record. Check its identity and content before generating a file, particularly when several analyses have similar names or describe related business services.
The BIA form export procedure lists sn_bcm.program_manager and sn_bcm.planner as the required roles. Confirm your access for this action rather than assuming that being able to read an analysis gives you access to its export controls. A missing action needs an access and configuration check before you change the underlying analysis.
Check eligibility on your instance and release: Australia specifies a BIA in Review or a later state, while the Brazil procedure starts from a selected BIA without stating that condition. PDF layout improvements begin with Xanadu. Check the installed BCM Core version when comparing output that includes newer report sections.
Before export, review descriptions and ownership information against the record you want the recipient to assess. Generating a file is also a distribution step, so use the review to confirm the information is ready to circulate. Give the person preparing the file a clear purpose: an impact review, a reference copy, or a document for comments.
The Generate PDF action on the BIA form produces a downloadable file
- Open the selected business impact analysis form in Business Continuity Workspace.
- Select Generate PDF.
- Wait for the message identifying the BIA and indicating that its PDF is ready to download.
- Follow the download link in that message.
- Save the PDF on your system, then open the saved file to inspect it.
Treat generation, download, and local verification as separate checks. A completion message tells you the file is available; opening your saved copy establishes that you have the document you intended to keep. Check the analysis name before handing it to a reviewer, especially if you have generated reports for several records during the same session.
The completion message names the BIA it was generated from, so compare that name with the record you meant to export before you download anything. A saved PDF is a snapshot of the record at the moment you generated it. If you edit the analysis afterwards, generate the file again rather than circulating the earlier copy.
Inspect long descriptions and sections that span pages. Compare the visible content with the selected analysis, and check whether the report is readable at the size the recipient will use. If you plan to print it, inspect the saved PDF first and then select Print. This avoids discovering a layout problem after distributing paper copies.
Printing is the last step in the procedure: open the saved PDF or Word copy and select Print. Print from the saved file rather than from the record view, so that the paper copy matches the file you reviewed.
A BIA document export serves a different reading need from a chart or summary metric. If the requirement changes to a visual reporting view, compare the available Core UI report types before trying to make a record document carry that workload.
Word reports come from the Document designer route
The BIA form provides Generate MS Word for a downloadable Word copy. For the Document designer reporting route, the required roles are sn_bcm.manager and sn_grc_doc_design.reader. Keep these requirements tied to that route; the role list for the BIA form PDF procedure does not establish access to Document designer report generation.
- Navigate through All, Business Continuity, and Business Continuity Workspace.
- Open the BIA record from the list view.
- Select More (…) and then Generate MS Word.
- In Generate report, select the report template for the BIA and enter a report name.
- Select Generate, then refresh the record shortly after the generation message appears.
- Open Details and locate the report in the Activity section.
- Download the Word report and save the copy you need.
This route supports keeping generated reports in the ServiceNow instance or Microsoft Office 365. Choose the intended destination and check the resulting document before sharing it.
The Word route produces a copy of the BIA record that you can download once generation completes. For the wider report generation steps, the BCM documentation points to a separate guide, Generating reports using Document designer, which is the place to check before you change how Word reports are built.
Inspect the template selection before generating, because a familiar report name does not show that the template fits a BIA. Verify the document’s subject and sections after download, then keep any editorial changes identifiable when circulating a Word copy for comments.
For help planning this work, see ServiceNow implementation.
PDF layout changes are made in the BIA document template
When the issue is presentation rather than BIA data, examine the document template. PDF template formatting lists sn_bcm.admin, sn_bcm.planner, and sn_bcm.program_manager as required roles. BCM administrators inherit the Document Templates reader and writer roles through sn_bcm.core_manager, enabling work with BCM document templates.
Begin by downloading a sample PDF so that you have a concrete output to inspect. In Business Continuity Workspace, open Document Templates and then All Document Templates. Select the BIA template and choose Edit. Update the template, save the changes, and select Publish to make the template available with the intended attributes.
The template controls include Insert Date for date variables and Insert Table of Contents for a contents section. Add Blocks lets you search for an existing document block and select Insert, or choose Create New Block. Use these controls for a defined reporting requirement, then regenerate a sample BIA to check the result.
Compare the sample before and after the change. Check section order, date placement, page breaks, and the handling of longer values. Do not judge a template from a short analysis alone if the documents you distribute contain much longer descriptions. A representative test record gives the reviewer a better basis for accepting the layout.
The BCM documentation covers PDF template formatting under the title Format PDF templates for BIAs, BCPs, and Events. Read that guide before editing the template so you know which controls apply to the BIA document, and check the result against the sample test record you generated earlier.
If you also manage employee documents, the HR document template and signature workflows explain that neighboring document use case. Keep the BIA template decision tied to continuity reporting requirements.
Repeat generation depends on the retain-attachments property
PDF improvements include BIA asset-owner details and descriptions, a table for plan-asset dependencies, and the PDF creation date on the front page. Review the sections relevant to your analysis instead of treating successful generation as a content-quality check. A formatted report can still need corrections to its underlying information.
For the Document designer Word route, sn_bcm.retain_report_attachments controls whether existing report attachments are retained or replaced. Establish the intended retention behavior with the configuration owner before relying on repeated generation as a record of previous reports. The generation procedure does not assign an administrative role for changing this property.
For a repeatable handoff, use a local file-naming convention that distinguishes the analysis, the intended review, and the format. Keep the downloaded baseline separate from a copy containing comments. If both PDF and Word are requested, compare their content before sending them together; reviewers should know whether they represent the same review baseline or different stages of the work.
When troubleshooting, record which stage failed: the action was unavailable, generation did not complete, the download could not be saved, or the file contained unexpected information. Include the BIA identity, chosen format, selected template where applicable, and the observed message. These details help separate an access problem from a template or content problem.
When you check the Word route, note whether the Generate MS Word action completed, whether the report appears in the Activity section after you refresh the record, and whether the downloaded copy opens with the expected BIA content. Each check separates a generation problem from a file problem.
If the question becomes how data is selected for platform reporting, the report source explanation covers that separate configuration concern. Keep your export check focused on the selected BIA and its generated document.