OBLYTECH Logo
OBLYTECH Logo

Troubleshoot the Jira integration with Agile Development 2.0

To troubleshoot the Jira integration with Agile Development 2.0, enable project logging, reproduce a specific failed operation, and use the resulting details to narrow the investigation. Then check the connection, project association, and mapping for that operation. Missing sprint data and failed exports require different checks, even when they affect the same project.

Enable project logging before investigating the failure

Begin with the project where synchronization failed. Record the affected Jira issue or sprint, the expected destination, the sync direction, and the time of the attempt.

In ServiceNow, open All > Agile Jira Integration > Properties. Select Enable Integration Project Logging, then click Save. This property enables detailed integration project logging. The access distinction matters: sn_jira_int.admin has edit access for this task, while sn_jira_int.user has read access. Have someone with edit access make the change.

After enabling logging, reproduce the affected operation with a controlled example. Compare its result with the project log details. Keep the evidence tied to that project and operation; a successful story import does not establish that an export or sprint import also works. Use the checks below to choose the next investigation based on the symptom.

These settings and behaviors reflect Brazil. Check the controls and integration behavior on your instance and release before changing configuration. For the surrounding setup sequence, see Jira integration setup and mapping for Agile Development 2.0.

Check the connection before changing project maps

Open All > Agile Jira Integration > Jira Instances and inspect the relevant instance record. Connecting Jira requires sn_jira_int.user. Open the record and click Connect. A successful connection changes State to Connected and registers a webhook in Jira. An unsuccessful attempt shows Connection Failed; use the error message to investigate the connection failure.

Keep credential and alias work separate from the connection action. Creating a connection and credential alias requires admin. Creating basic authorization credentials and an HTTP(s) connection requires sn_jira_int.admin or sn_jira_int.user. The credential user needs access to all Jira projects. If a project lacks generated mapping after discovery and import, check that access before rebuilding its configuration.

For Jira Server installations, inspect the connection attributes server_type and server_version. Incorrect server attributes can leave import requests in Processing. Record the actual deployment type before adjusting them. When exports fail, check whether the Jira password has expired. It is one of the export checks, and it is separate from the project map.

When reporting the result, distinguish connection establishment from record synchronization. Note the connection state alongside the failed work item operation. For broader decisions about integration responsibilities and data flow, use Agile Development integration patterns.

Match the failure to the project and assignment group

A connected instance still needs the correct association between a Jira project and an Agile Development assignment group. Before creating that association, the Jira projects and boards must be discovered and imported, the assignment groups must exist, and the project must have a mapping configuration. Verify those prerequisites for the specific project under investigation.

Creating the association requires sn_jira_int.user. Go to All > Agile Jira Integration > Team Integration Settings, click New, and select the Jira project and assignment group. Select the Jira board when board sprint synchronization is needed, then click Submit. Each assignment group takes at most one Jira project and one board.

The board selection is optional when sprint synchronization is unnecessary. A Kanban project needs no board: leave the board field blank and every issue in that project lands in one Agile 2.0 group. Consequently, investigate a missing sprint against the intended board association rather than assuming that successful issue synchronization proves the sprint setup is complete.

Compare the failed record with this association before moving on. Capture the project, board if selected, and destination assignment group in the investigation notes. This prevents testing a different team configuration and treating its result as evidence about the original failure.

Trace export and field failures through project mapping

When an export fails, check whether Enable Export is selected in the integration settings for that Jira project or board. Then review the custom map configuration. An invalid custom configuration can block export, as can a mapped custom field that has not been added to the issue’s default screen scheme. Logging provides context, but these configuration checks still need to be performed.

To inspect the project’s mappings, open Agile Jira Integration > Jira Instances, select the instance, and open the project from Jira Projects. In Table Maps, inspect the relevant record, such as Story or Epic. Check the table map for the failed issue type. Test that type with a single item before relying on it. Check the actual failed type rather than relying on a working Story map.

Separate a missing record from a missing value. If a record arrives but a field is empty, examine the custom field map. If Priority or State is missing, examine the custom workflow state map. Compare equivalent fields. Jira’s Summary is mapped to Short description, and Jira’s Description is mapped to Description. Check the field maps on your Story and Epic table maps, because a custom map can change those pairings. A comparison against the wrong destination can resemble data loss.

A custom table map also needs a business rule to support export. This action requires admin or sn_jira_int.admin. In All > System Definition > Business Rules, open Synch Story with Jira and use Insert and Stay from the context menu. Give the new rule a unique Name, set Table to the Agile Development table covered by the custom map, and click Update. Check that Insert and Stay is enabled before starting.

For help planning this work, see ServiceNow implementation.

Distinguish sprint conditions from update delivery failures

If imported stories lack their sprint association, check whether the sprint has started in Jira. A future sprint is not associated with those stories in Agile Development, and Jira sprint data is updated there when the sprint is active. This differs from a sprint that fails to import: for that symptom, check that Jira sprint dates exist.

Also compare those dates with other sprints in the same Agile Development assignment group. Overlapping dates are another check when a sprint does not import. Keep the assignment group in the comparison; dates from an unrelated group do not establish the condition affecting the failed import.

If a Jira user’s update does not arrive, determine which account made the change. Credentials used to establish the integration should not also be used for record updates. Reproduce the update with an appropriate separate user and compare the result. This isolates the user-related condition without changing maps that may already be correct.

Record which operation passed after a correction and which operations remain untested. A successful sprint import and a successful story update establish different outcomes. For planning controlled follow-up work around synchronization, see Agile Development automation opportunities.

Questions about less obvious Jira synchronization symptoms

Why can Jira Cloud comments appear twice after import?

Investigate the cyclic payload and the connection user’s privacy settings. The email address must be visible in webhook events for that user. Check the account used in the HTTP connection rather than assuming that another administrator’s privacy settings represent the integration account.

Should deleting a Jira project remove its Agile Development stories?

Deleting a Jira project or board does not trigger that cleanup in Agile Development 2.0. The Jira administrator must manually delete the associated stories there. Treat this as a separate cleanup decision, including which records are affected, rather than retrying the project deletion to provoke synchronization.

Why does rich text arrive as garbled text?

The Jira wiki text format is not supported. Examine the source formatting when text arrives but appears corrupted. Preserve an example of the original content and its destination appearance so the investigation distinguishes a formatting issue from a missing record or an unmapped field.

Can a Next-gen project’s subtasks be exported as scrum tasks?

Next-gen subtasks come in only after you set a custom mapping for that task type. Sending them back to Jira is not supported, so a failed export of that kind is expected behavior, not a connection fault. Identify the task type and direction before treating the behavior as a failed export that repeated connection attempts could resolve.

What can restore a missing Next-gen story-to-epic relationship?

A nominal update to the story in Jira can send the epic relationship with that update to Agile Development 2.0. Check the resulting relationship on the destination story after the update. This targeted check addresses the missing association without assuming the entire project must be imported again.