OBLYTECH Logo
OBLYTECH Logo

Configure SLA properties

To configure SLA properties, use an admin account and open All > Service Level Management > Properties. Choose SLA Engine, SLA Logging, or SLA Repair according to the behavior you need to change. Record existing values, adjust the relevant property, and test calculation, diagnostic, or repair behavior before applying the change broadly.

Configure SLA properties against a specific requirement

The admin role is required for this configuration procedure. Begin with a concrete outcome: reduce unnecessary recalculation of old breached records, investigate a condition evaluation problem, or make repair controls available. These outcomes lead to different property groups. Changing several groups together makes it harder to explain the result.

  1. Open All > Service Level Management > Properties.
  2. Select SLA Engine for calculation and engine behavior, SLA Logging for diagnostic settings, or SLA Repair for repair activation.
  3. Record the property name, current value, proposed value, reason, and test case.
  4. Validate the proposed change in a nonproduction instance with representative task SLAs.
  5. Compare the outcome with the original requirement before scheduling the production change.

Check the available settings and current values on your instance and release. Defaults can differ between new and upgraded instances, and a property described below may require manual creation or may be absent from the properties page. Use the baseline you recorded when reviewing the result.

If the issue concerns which agreement should attach to an incident, first review incident SLA configuration. A property change should have an identified engine, logging, or repair requirement behind it.

Control calculation limits and time fields

In Service Level Management > Properties > SLA Engine, com.snc.sla.calculation.percentage controls the Actual elapsed percentage beyond which the SLA – update calculations scheduled job stops routine time calculations. Its default is 1000. This limits ongoing updates to records that have remained breached for a long time.

Treat zero and blank as distinct choices. A value of 0 stops calculations; leaving the property blank allows calculation across SLAs without this percentage cutoff. Before changing it, identify whether your concern is a stale active record or an old breached record that has passed the cutoff. Those cases call for different investigations.

com.snc.sla.maximum_duration sets the maximum SLA definition duration in days and defaults to 1095. Review the required definition duration before raising this limit. The maximum is a configuration boundary; it does not choose a duration for an individual agreement.

com.snc.sla.calculation.use_time_left defaults to false. Enabling it uses business_time_left for breach calculation instead of business_percentage. The percentage field is rounded to two decimal places, so 99.995% is stored as 100%, causing the task SLA to be marked breached. Include a near-boundary record when assessing this setting.

glide.sla.calculate_on_display defaults to false. When enabled, displaying a Task form recalculates Task SLA records, which can increase form load time. Test both the freshness of displayed values and the experience of opening the form. A calculation improvement needs to be assessed alongside its effect on users.

com.snc.sla.always_populate_business_fields determines whether a task SLA without a schedule receives business field values matching its actual values. False leaves those business fields empty. The default is true for new instances and false for upgraded instances. Include an unscheduled record in testing so that reporting changes are visible.

Review engine execution and breach handling

com.snc.sla.engine.version is a choice property with 2010 and 2011 options; its default is 2011. com.snc.sla.engine.async determines whether the 2011 engine runs asynchronously after task insert or update operations and defaults to false. Record both values before investigating differences in when SLA processing occurs.

com.snc.sla.compatibility.breach defaults to false and supports the older representation of breached status in the stage value. Enable it when reporting requires that older behavior. Prefer the breached flag when the reporting requirement permits it, and inspect dependent reports before changing compatibility behavior.

com.snc.sla.default_conditionclass names the Script Include class that evaluates conditions for the 2011 engine. Its default is SLAConditionBase. It can identify a custom extension of that class. Treat a change here as a condition evaluation customization: document the extension and test both records that should qualify and records that should fail the conditions.

For related customization decisions, see adding custom business rules to an SLA. Keep the reason for changing the condition class explicit so that later troubleshooting can distinguish configured behavior from an unexpected result.

com.snc.sla.calculate_planned_end_time_after_breach defaults to false. Enabling it continues recalculation of Planned End Time after breach. For zboot customers, this property is unavailable on the SLA Engine Properties page. Test a breached record when reviewing whether continued deadline recalculation matches the operational requirement.

Handle agreements that attach after breach

A task update can attach an SLA that is already breached. For example, increasing the priority of an older incident can make a shorter resolution commitment apply. Examine this case separately from an SLA that attaches before its deadline and breaches later.

com.snc.sla.workflow.run_for_breached defaults to false. With that setting, a workflow specified in the SLA Definition does not run when the task SLA is already breached at attachment. Enable it if that attachment should start the configured workflow, then test the resulting actions against the intended escalation sequence.

The flow equivalent is com.snc.sla.flow.run_for_breached. It is absent from the base system and must be created manually when required. Navigate to All > System Properties > All Properties and select New. Set Name to com.snc.sla.flow.run_for_breached, Type to true | false, and Value to true. TaskSLAFlowSNC reads the value at runtime.

Use SLA retroactive start and pause configuration when reviewing the timing context, and SLA breach escalation and notification when checking downstream actions. Validate the attachment scenario before approving a broader behavior change.

For help planning this work, see ServiceNow implementation.

Target logging and make repair available deliberately

Open Service Level Management > Properties > SLA Logging. The Logging level for… properties target specific Script Includes invoked through a task SLA. Their default level is Notice. Start with the component involved in the symptom so that the captured output remains focused on the investigation.

  • com.snc.sla.task_sla_controller.log targets TaskSLAController; com.snc.sla.task_sla.log targets TaskSLA.
  • com.snc.sla.condition.log targets SLAConditionBase; com.snc.sla.workflow.log targets TaskSLAworkflow.
  • com.snc.sla.calculatorng.log targets SLACalculatorNG; com.snc.sla.repair.log targets SLARepair, which requires repair to be enabled.

The available levels are Emerg, Alert, Crit, Err, Warning, Notice, Info, and Debug. Debug captures detailed information for fault finding. Record the original level before a diagnostic change and restore the agreed baseline when the investigation ends. A temporary logging change should have a defined test record and observation window.

com.snc.sla.log.destination controls output placement. The default sends output to Database and node logs. The alternative sends output to node logs alone. Database and node output using gs.log is visible as system logs in ServiceNow; node output using gs.print appears in log files. Confirm the destination before concluding that a reproduction generated no evidence.

For repair activation, open Service Level Management > Properties > SLA Repair. com.snc.sla.repair.enabled activates the Repair modules and UI Actions when true. It defaults to true for new instances and false for upgraded instances. Verify activation separately from the success of a repair operation; making controls available is an access point for the process.

Before closing the change, compare the same records before and after the adjustment. Check calculated fields, the expected workflow or flow activity, and the location of diagnostic output as applicable. Record a failure as a failed test rather than compensating with an unrelated property change. If more than one setting needs adjustment, repeat the comparison after each step so the final configuration has an explanation that can be reviewed.

Questions for planning SLA property changes

What should a property change request contain?

Include the observed symptom, a sample task, the exact property, its current and proposed values, and an expected result. Add the person responsible for reviewing that result. This turns a broad request to fix SLAs into a change that another administrator can assess.

How should the test records be selected?

Select records that expose the proposed change and records that should remain unaffected. Include relevant differences in schedule, elapsed time, and attachment timing. A comparison record helps show whether the observed result belongs to the setting being tested.

When should a proposed change be rejected?

Reject or revise it when the expected result cannot be demonstrated, when dependent reporting becomes misleading, or when the operational impact exceeds the agreed requirement. Preserve the test findings so that the next investigation starts with evidence rather than the same assumption.

What belongs in the handover after testing?

Provide the approved values, test record identifiers, observations, remaining questions, and restoration values. Explain who will check the production outcome and what would trigger restoration. That record gives the next administrator a reason for the configuration as well as a list of settings.