OBLYTECH Logo
OBLYTECH Logo

Install the Task Intelligence Admin Console

To install Task Intelligence Admin Console, use an account with the admin role and locate Task Intelligence Admin Console (sn_ti_admin) in All Available Applications. Confirm entitlements, choose an available version, review dependencies, decide whether to load demo data, and complete the installation. Check compatibility and subscription requirements before starting.

Prepare the installation request

The application identifier is sn_ti_admin. Keep that identifier alongside the display name in your change record so the administrator can distinguish the intended application from related components. The installation brings in roles and tables, and it can install associated Store applications and plugins that are absent from the instance.

Before opening the installer, write down the target instance, its release, the intended application version, and the reason for the installation. Treat these as preparation details for your team. They give the administrator a clear starting point and help a reviewer compare the planned change with the application selected on screen.

The admin role is required for this installation action. Assign the installation to a person who has that role rather than assuming that ownership of a ticketing process provides installation permission. Keep later decisions about operational access separate; the installation role does not define the access requirements for subsequent tasks.

For context on where this work fits, see the plain-language guide to Predictive Intelligence. Establish the immediate goal before expanding the change into model configuration or ticket-routing work.

Check application and dependency entitlements

Task Intelligence Admin Console and its associated Store applications need valid entitlements. Check the application’s dependencies, licensing or subscription requirements, and release compatibility for your instance. Make this a readiness decision before proceeding through the installation screens; the presence of an application name in a request does not resolve its entitlement requirements.

A concise preparation checklist helps the administrator make that decision:

  • Identify the instance where the installation is intended to run.
  • Confirm that the application entitlement is valid.
  • Review associated applications and their entitlement requirements.
  • Check the intended version against the target instance and release.
  • Decide who will resolve a dependency entitlement prompt if one appears.

Related applications and plugins may be installed as part of this operation when they are not already present. Review that broader change before treating the work as a single-component addition. In your change notes, distinguish what is already installed from what the proposed installation would add.

If a dependency entitlement is unresolved, pause the installation decision and resolve that item. Recording the affected component and the outstanding entitlement gives the next person something specific to investigate. Repeating the same application search will not answer a licensing or subscription question.

For help planning this work, see ServiceNow implementation.

Find and install Task Intelligence Admin Console

Use the application name and identifier as two ways to locate the same installation target. The available versions appear in the list beside Install. Choose from that list after completing the preparation checks, rather than assuming a version mentioned in an older change record is the one available now.

  1. With an account that has the admin role, navigate to All > System Applications > All Available Applications > All.
  2. Use the filter criteria and search bar to find Task Intelligence Admin Console. You can search by the application name or by sn_ti_admin.
  3. Inspect the available versions in the list next to Install, then select the intended version.
  4. Select Install to open the installation review.
  5. Examine the dependencies shown in Review Installation Details. Resolve any additional entitlement requirements presented during this step.
  6. If sample records are wanted and available, make the demo-data choice before continuing.
  7. Select Install to proceed with the installation.

If the application cannot be found, it may need to be requested through the Store. First confirm that the search is for the correct name or ID and that the chosen filters fit the search. Capture the search result in the change record so the next administrator can distinguish a discovery problem from a dependency problem.

Do not replace the missing application with a similarly named result simply to move the change forward. Keep the requested display name and sn_ti_admin together during review. This gives the installer and reviewer a shared reference without relying on a remembered label.

Choose demo data deliberately

The optional Load demo data check box is available when demo data can be installed. These records illustrate application features and common use cases. Loading them during the first installation on a development or test instance supports an initial evaluation of the application.

Make the choice with the person responsible for that environment. A test instance intended for demonstrations may need sample records, while a test plan built around a controlled set of existing records may have different needs. Record the choice before the final installation action so reviewers understand what data was intended to accompany the application.

Keep sample records identifiable in evaluation notes. If someone later demonstrates a workflow, the audience should know whether the example uses demo data or records selected for acceptance testing. That distinction makes the demonstration easier to interpret and prevents sample behavior from becoming an unsupported claim about your own task data.

The next stage can use the Predictive Intelligence testing and acceptance checklist to organize evaluation. Agree on the evaluation records and expected outcomes before judging the result.

Record completion and handle blocked attempts

After the installation finishes, compare the resulting application information with the version and application identity recorded in the plan. Capture the outcome, the demo-data choice, and any dependencies added. These are recommended handover checks that make the installation traceable for the team taking over.

Keep the evidence proportional to the work. A completion note should explain which application was installed, where it was installed, and what the administrator observed. An installation record should not claim that categorization accuracy, routing quality, or business acceptance has been demonstrated unless separate testing supports those conclusions.

When an attempt cannot proceed, describe the point where progress stopped:

  • Application discovery: record the name or identifier searched and whether the intended application appeared.
  • Version selection: record the versions presented and which version the change expected.
  • Dependency review: record the affected dependency and the unresolved entitlement.
  • Final installation: preserve the displayed outcome and the intended demo-data selection for investigation.

A report such as “the application was found, but a dependency entitlement remains unresolved” is more actionable than “Task Intelligence does not work.” It directs the next review toward the installation obstacle. For later investigation, use the Predictive Intelligence troubleshooting guide to structure the symptoms and evidence.

Hand the completed installation record to whoever owns the next configuration step. Include the decisions made during installation so that person can plan subsequent work without reconstructing the change from scattered messages.

For a blocked attempt, keep the next action small and specific: resolve the named entitlement, confirm the intended version, or clarify the environment. A clearly assigned action is easier to resume than an open request to investigate the entire application.

Questions about installation planning and handover

What should a change reviewer ask for before approving the work?

Ask for a clear application identity, a named target environment, and an explanation of the intended outcome. Request a record of unresolved prerequisites as well. This makes approval a decision about a defined change, rather than approval of a broad request to “enable intelligence” across task processes.

How should two administrators divide the work?

Use a written handover with a clear stopping point. One person can prepare the readiness record while the administrator performing the installation verifies it against the instance. If responsibility changes midway, document the last completed action and outstanding decision before the second person continues.

What should be retained when an installation is postponed?

Keep the reason for postponement, the person responsible for resolving it, and the condition that would allow work to resume. Preserve any relevant observations from the attempted change. This avoids reopening a request later with no explanation of why the earlier attempt stopped.

How can the installation be demonstrated at a handover meeting?

Walk through the change record and the resulting application information, then identify the next planned activity and its owner. Keep questions about future configuration on a separate action list. The meeting should leave participants with an agreed account of the completed change and the remaining work.

What belongs in the decision to close the installation request?

Agree on closure criteria before the work begins. A sensible request separates the administrator’s installation evidence from later evaluation commitments and records outstanding items explicitly. The requester can then accept the completed installation while giving any follow-on work its own owner and acceptance criteria.