OBLYTECH Logo
OBLYTECH Logo

Experience Cloud Site Launch Checklist for Admin Teams

An Experience Cloud site launch checklist is the ordered set of checks an admin team runs before a site opens to users. It covers access, navigation, page visibility, a test login for each audience, and a signed-off rollback plan. Start with access, because a page a user cannot reach cannot be checked from that user’s side.

Many launch problems on a portal-style site are gaps between what the build delivers and what one audience can actually reach. A partner who lands on an empty menu may call the site broken even when each component works on its own. The sequence below puts those gaps in front of the team before users find them.

Run the full checklist in the final pass before launch, and rerun the access and visibility sections after any change to sign-in, page structure or group membership. One change in one area can alter what another audience sees.

Confirm who can reach the site before anything else

Start with access, because the later checks depend on it. List each audience the site serves, such as staff who manage content, external members who sign in to work, and visitors who see public pages. Beside each audience, write the one action it must complete on day one. If an audience cannot name that action, the discovery work is unfinished. If the list is still loose, return to the needs assessment and discovery work before you change any access setting.

Next, confirm the sign-in path for each group. Check which login options each audience uses and whether that method is enabled for the site. Login methods often get configured for the first audience and forgotten for the second, so compare the list with the audience document line by line.

Work through these access checks with the audience list in hand:

  1. Each audience has access that matches its entry in the document, and no group inherits access it was not meant to have.
  2. The public pages are the ones you meant to publish, and nothing internal appears to a visitor who has not signed in.
  3. If people can register themselves, registration is open for the groups that need it and closed for the groups that do not, with the reason written down.
  4. The sign-in screen and the password reset prompt use wording your users already recognize from the other tools they log in to.
  5. Any account created for testing is disabled or removed before sign-off.

Menus can hide a link without blocking the page behind it. Open the direct address of one internal page per audience in a private browser window with no active session. A page that loads when it should not is an access problem, even if the menu did not show a link to it.

Check navigation as each audience sees it

Navigation problems tend to appear when you look from the audience’s side of the sign-in. An admin account can see more of the menu than a member, including pages still in progress, so an admin review says little about what a partner sees. Sign in as each audience and walk the menu in the same order each time, so the results can be compared.

For each audience, check the following in order:

  1. Open each menu item and note any that return an error, a blank page or content you did not expect.
  2. Read each label aloud. Labels should use the words a user would search for, not internal project names or abbreviations left over from the build.
  3. Check that each page gives a way back, through the menu or a home link. A page with no exit pushes the user toward the browser’s back button.
  4. Confirm the menu order puts the task users come for first closest to the top.
  5. Note what the audience sees on the landing page after sign-in, and compare it with the day-one action in the audience document.

Keep a dated record of each menu review, naming the audience, the test account and the browser. When a user reports a missing item weeks later, that record shows whether the group ever saw it, and whether the cause is a setting, a permission or the user’s own account.

Menu structure belongs to the build. The configuration and customization stage is where that structure is set, so fix structural issues there rather than adding links to cover a broken path.

Review page visibility and content state

A page can appear in the menu and still be wrong for an audience. Check each page for three things: its publication status, whether it is shown to the audiences that should see it, and whether its content is final. Draft pages that look finished generate questions after go-live, because users assume the rest of the site is unfinished too.

Build a simple grid with pages in rows and audiences in columns. Mark each cell as expected visible or expected hidden. Then sign in as each audience and compare what you see with the grid. Each difference is either a setting to correct or a grid entry that was wrong from the start. Decide which one it is, and record the decision beside the row so the reason survives the next review.

While you check visibility, read the content as well. Search for placeholder text, leftover test names, dates from an earlier draft and instructions written for the build team. Confirm that images and embedded content load for each audience, because a change in access level can change what a member sees on the same page.

Run a test login for each audience

The test login catches what the grid misses. Use a test account with the same role and group membership as a real user in that audience. An admin account with a similar name can read the site with permissions the user does not have. Label each test account, record who holds its credentials, and disable it at sign-off.

Run the same short script for each audience:

  1. Sign in with the test account, and note the time and the browser used.
  2. Complete the day-one action from the audience document, from the first click to the final confirmation.
  3. Try one thing the audience should not be able to do, such as opening an internal page by its address.
  4. Sign out, return through the link you plan to give users, and confirm the landing page is the right one.
  5. Repeat the first three steps on a phone-sized screen. Menu layouts that work on a laptop often collapse or hide items on a small screen.

Do not skip an audience because it resembles another. Two audiences can share a menu and still differ in what they can open. Read the sign-in screens as someone new to the site, and change any wording that depends on an internal term your team uses.

Record a short test note for each audience: the step that passed or failed, the account, the browser, the date and the tester’s name. After a fix, rerun the whole script for that audience, because a change to access or navigation can alter the later steps.

When a test exposes a gap in the build rather than in a setting, the fix is usually a change of scope and not a late patch. For help planning this work, see Salesforce implementation.

Sign off and plan the way back

Sign-off is a written decision, not an impression that the site looks ready. Name the person who approves access for each audience, record the date, and attach the visibility grid and the test notes. If no one can be named for an audience, its access stays closed until a name is recorded.

Plan the way back before you open the site. Decide who may change access settings after launch, and how a mistake gets reversed. A rollback usually means restoring the previous menu and access configuration rather than removing content that users may already have seen.

Run the full checklist in a copy of the site before production. How recent that copy is, and what data it holds, sets how far you can trust the results. Plan the copy with the sandbox refresh planning notes, so that it matches the build you intend to launch.

Keep the checks running after launch

Launch starts a second set of checks. New users ask questions the test accounts could not predict, and the first weeks show which labels and pages cause confusion. Add a dated note for each change to access, navigation or content, naming what changed, who approved it and which audience it affects.

Reviewing what users post and do once they are signed in is separate work. The community manager moderation routine covers that side once users are active, and it is worth setting up before the first sign-ins arrive.

Questions about launch checks for an Experience Cloud site

How long does a launch pass take?

The run time grows with the number of audiences, pages and menu items, so no single figure fits all sites. Scope the pass during planning and name a person for each section, so the time is set before launch week rather than discovered during it.

Who should run the test logins?

Choose someone who did not build the pages under test. A builder tends to read screens with the design in mind, while a second reader notices wording a user would find confusing.

What if one audience cannot finish its day-one action at launch?

Hold that audience’s access until the action works, rather than opening the site to everyone and fixing the gap afterward. Record the decision with the date of the next check. Users who hit a broken first task often judge the whole site by it, and that impression is slow to reverse.

Does the checklist cover forms, automations and integrations?

No. It covers access, navigation, page visibility and sign-in. Forms, automations, data rules and integrations need their own test plans, and the sign-off record should point to those plans rather than assume they passed. A page can pass each check here and still fail when a user submits it.