OBLYTECH Logo
OBLYTECH Logo

Login Access and Session Policy Review for Admin Teams

A Salesforce login access policies session settings review is a scheduled check of three controls: allowed network ranges, permitted sign-in hours and idle session length. For admin teams, it also records who is exempt from each control and why. Running it on a fixed cadence keeps the rules matched to real work.

Why a login policy review needs a fixed schedule

Login rules are usually set once, during a go-live or after an incident, and then left alone. Over the following months people change roles, contractors start, offices move and remote groups add home connections. Rules written for last year’s setup gradually stop matching how people sign in. A fixed review schedule catches that drift while the list of changes is still short.

The review also produces a record. When someone asks why a user can sign in from a particular network or at a particular hour, the answer should be written down with a date and a name. Otherwise each exception becomes a favor that nobody remembers granting.

Gather the current settings before changing anything

Start by recording what is set today, not what the original design document says should be set. Copy each control into a shared sheet with the control name, its current value, the group it applies to, and the date someone last confirmed it. Confirm the exact field and menu names on your own instance before you record them.

Then export the users with their profiles and permission sets. You need that list for the exemption step, since a control means little until you know which people it reaches.

Review the network ranges allowed to sign in

In most implementations, network restrictions are set once and seldom revisited. For each range, ask who signs in from it and whether that is still true. Ranges usually come from office networks, VPN exit points, managed device fleets, or a partner’s fixed address. Each one should trace back to a named owner.

Confirm each range still has a current owner

Ask the owner of each office, VPN or partner link to confirm the address block is still in use. An office that closed years ago often leaves its range behind, and that range becomes a quiet way into the org. Record the owner’s name and the date of confirmation.

Remove ranges that nobody can explain

Remove an unconfirmed range through a planned change, not on the spot. Add it to the change list with the reason, schedule the removal, and tell the people affected. If a user later reports being blocked, the record shows that the change was deliberate and when it happened.

Some users sign in through an external community or portal route instead of the standard login page. Before deciding whether they belong on a network list, compare the routes in Experience Cloud login options so you know which control applies to them.

Check the session timeout against real working patterns

An idle timeout protects a session that someone walked away from. Set it too short and people lose unsaved work during a call, which pushes them toward workarounds such as leaving a browser logged in at a shared desk. Set it too long and an abandoned session stays usable for hours. The goal is the value that fits the work, not the tidiest number.

Group users by how they work. Field staff on tablets, desk staff who keep a record open all morning, and admins who move between configuration screens often need different values. Where your policy allows different values, record which group uses which one. Where it does not, note the groups that feel the setting hardest and whether they have raised it.

Measure the timeout against the organization’s written security standard, not against habit. If no written minimum exists, the review is the place to ask for one, because a setting nobody can justify is hard to defend later.

Set sign-in hours with a clear exception path

Sign-in hour limits suit teams with fixed shifts. They fit poorly with teams that cover several time zones, run on-call rotations or provide weekend support. Before keeping a limit, list who signed in outside the window during the review period. Unexpected activity suggests the limit is too tight or out of date.

Each limit also needs an exception path that is quick to use and leaves a trace: a short request to the admin who owns the setting, a stated end date, and a line in the review record. Without one, people share accounts or ask for blanket removals just to finish their work.

Build the exemption list and record why each entry exists

An exemption is any user or group that a standard control does not apply to. Integration accounts, service users for scheduled processes and executives who travel across many networks often need one. The problem is not that exemptions exist. The problem is that they get added once and then forgotten. Record the following for each entry.

  • Account or group: the user or group name, written as it appears in the org so it can be found again.
  • Exempt control: network range, session timeout, sign-in hours, or a combination.
  • Reason: the specific business need, not a general statement such as “needs access”.
  • Approver: the person who accepted the exemption, and the date they did so.
  • Review date: when the exemption must be reconsidered, and who will do it.
  • Compensating check: what watches this account in place of the control, such as a separate activity check.

Keep exempt access narrow. An integration account that needs a handful of objects is easier to review with a small, purpose-built permission set than with a broad profile shared with other users. The approach is covered in permission set design for small teams.

Assign who prepares, approves and signs off the review

A review needs three roles. The preparer gathers the settings and the user list, then writes up each proposed change. The approver owns the security decisions and accepts or rejects each change and each exemption. The admin makes the approved change and records the date it went live. A small team can combine roles, but the person who makes a change should not be the sole person who checks it.

Keep edit rights on these settings with a short, named list of admins. Each change to a timeout, a network range or an hour window should trace back to a person who can explain it later.

When one person ends up holding all three roles, the second check usually disappears. If you cannot separate the roles, have that person write each change and its reason on the sheet, and have a colleague read the list before the change goes live. For help planning the work itself, see Salesforce implementation.

Run the review on a fixed cadence and keep the record together

Pick a cadence that matches how quickly the org changes. Many teams review quarterly and add an extra pass after a reorganization, a new office, a new integration or a security finding. Put the review on a shared calendar with a named owner. Teams that want an outside view of their first review can start with the Salesforce consulting page.

Keep the sheet, the approved changes and the exemption list together, with dates, the names of the preparer and approver, and the reason for anything deferred. A deferred item carries its original date onto the next review, so it cannot quietly drop out of view.

Test each change before relying on it

Test in a sandbox where the org has one, using a test user that matches each affected group. Sign in from a network inside the new range and from one outside it. Leave the test session idle for the configured timeout. Try a sign-in inside the hour window and another outside it. Record each result beside the change it belongs to.

Schedule the production change for a quiet period, tell the people affected, and share the exception route before the change goes live rather than after the first complaint.

Questions about exemptions, timing and records

Do integration accounts need an entry on the exemption list?

They usually do, especially when the controls they are exempt from would break a scheduled process. Record the process the account supports, its owner and the controls it is exempt from. That gives the next reviewer enough to judge whether the exemption still fits the work.

What should happen when an exempt user signs in from a new location?

Treat it as a question for the exemption’s approver rather than an automatic failure. Check whether the location is expected, such as a conference venue or a temporary project site. If it is, record the change against the exemption with a date and an end point. If it is not, pass the matter to whoever handles security incidents on your team.

How long should a deferred change stay open?

Keep it open until the next scheduled review, and bring it up there with its original date showing. If it has been deferred twice, decide whether the control is still needed at all rather than carrying the item forward indefinitely.

Should the review replace monitoring of failed sign-ins?

No. The review examines the rules and the people they cover at a single point in time. Sign-in attempts and failures happen between reviews and need their own checks. Use the review to confirm the rules are current, and use routine monitoring to catch activity the rules technically allow but nobody intended.