OBLYTECH Logo
OBLYTECH Logo

Control Testing Samples Chosen With AI: Documenting the Selection Logic

When an AI assistant helps choose which items go into a control test sample, the tester still owns the conclusion. The written rationale should record the population, the selection rule, what the assistant received and returned, and each manual change to its list. A reviewer can then trace each sampled item back to the control objective.

Why the selection rationale matters more when an assistant is involved

A sample chosen by hand usually comes with the tester’s own memory of how it was built. A sample chosen with an assistant’s help can look more precise than it is, because the list arrives quickly and reads as finished. Reviewers ask the same questions in both cases: what was the population, could items have been left out, and who decided the final set. The assistant cannot answer those questions for you. The rationale has to answer them in plain terms that stand without the chat transcript.

Define the population and its boundaries first

Before any selection happens, write down what the population is. Name the system or process, the date range, the business unit or entity in scope, and the report or query used to extract the records. Note the record count returned by that extraction. A count captured at extraction is what allows a reviewer later to confirm that the population given to the assistant was complete.

Check completeness against the source system, not against the assistant’s summary. Ask whether the extraction filter could have dropped records, such as entries with blank fields, items moved between periods, or records created after the export ran. Software asset data is a common example: a license record that changed owner mid-period may appear under the old owner in one extract and the new owner in another. If the population came from several extracts, record each one separately and explain how they were combined. Duplicates across extracts tend to produce a sample that looks random but overweights a few items.

Once the population is fixed, keep the extract as a file with its record count in the rationale. Do not rely on the assistant to re-count it later.

Set the selection rule before the assistant runs

The selection rule should exist in writing before anyone asks an assistant for a list. Without that order, the tester can adjust the criteria until the output looks reasonable, and the rationale then describes a rule that was written after the fact. A written rule also gives the assistant something concrete to apply, which makes its output easier to check.

A workable sequence looks like this:

  1. State the control objective in one sentence, along with the attribute the test checks on each item.
  2. Choose the sampling approach your methodology allows, such as random, systematic, risk-based or a combination, and record why it fits the control.
  3. Set the sample size from your methodology and from the control’s frequency or risk rating, and record the figure used.
  4. Define any stratification or risk criteria, such as value thresholds, prior exception history or a recent owner change, with the exact field values that trigger each one.
  5. Decide how replacements are handled when an item is unavailable or out of scope, and name the person who approves a replacement.

Write the rule as plain text in the rationale and date it. If the rule changes after testing starts, record the change, its date, the reason and the approver, and leave the original wording visible rather than overwriting it.

Record what the assistant received and what it returned

The assistant’s inputs and outputs are part of the evidence. Keep the instruction you gave it, the population fields it was shown, and the list it returned. If the exchange ran over several turns, keep the turns that changed the selection. A reviewer who wants to reproduce the list should be able to see the same inputs and the same criteria.

What to keep from the conversation

Save the text of the request and the final output in the workpaper folder. Chat history can be lost, and a later reviewer may not have access to it. Note the date and the tool used. Before pasting anything into an external tool, remove personal data the population does not need, and follow your organization’s rules on which data may be shared with an outside service. If the full extract is too large to share, give the assistant the fields the selection rule depends on, apply the filter in your own data tool, and record that step.

Why an identifier list is not enough

A plain list of item identifiers shows what was picked but not why. Add a table with one row per sampled item. Each row should show the stratum or criterion that selected the item and whether it came from the assistant’s list or was added by the tester. With that table, a reviewer can see whether the assistant over-weighted one category, such as a single location or a single owner.

Review the list against the rule and document each change

Check the assistant’s list against the written rule, not against how reasonable it looks. Confirm that each item exists in the population extract, that its value or date falls inside the rule’s limits, and that no item appears twice. Then check the other direction: that items meeting the criteria were not left out.

Any manual change needs a line in the rationale. Record the item removed or added, the reason, and the person who made the change. Common reasons include an item outside the test period, a record filed under the wrong owner, or a duplicate. A change made only to produce a neater spread of items moves the sample away from the rule, so treat it with caution. If a change could affect the test result, the reviewer should see it before the conclusion is written.

Check coverage and guard against selection bias

An assistant can favor items that look unusual or that match the wording of the request. That can suit a risk-based test. It can also skew a sample that was meant to be random. Compare the sample’s distribution with the population on the fields that matter, such as owner, location, value band, age and status. Where the difference is large, the rationale should state whether the rule produced it.

Look for gaps as well. A sample with no items from a small but in-scope group cannot support a conclusion about that group. Either add items from the group under a documented rule, or state the limitation in the conclusion so the reader knows what the test did not cover.

Assemble the evidence file for review

Keep the rationale, the population extract with its count, the written rule, the assistant exchange, the final list and the change log together in one folder. Date each document and label the rule with its version. A reviewer should be able to open the folder and follow the sample from the population to the final list without asking for missing pieces.

Recurring controls need the same structure in each period, with new content. Each cycle requires its own population extract and selection record, even if the rule has not changed. Teams working in a governance platform can file the folder against the control record, and the policy and audit evidence page covers related workflow. Where the sample draws on software license or asset records, the software asset compliance page is the closer match.

For help planning this work, see AI and ML services.

Monitoring the assistant’s output over time

If the same assistant is used across many control tests, its behavior can drift as the underlying model or the prompt template changes. A small check on past selections helps show whether the output still follows the written rules. Re-run one or two earlier rules on a known population and compare the result with the saved list. Explain any differences in the file before the new cycle begins. The approach used to check AI answers against a fixed set of expected results is covered in the small evaluation set for AI answers guide, and the wider question of whether a deployed AI feature still behaves as expected is addressed in the quality drift in production AI features guide.

Questions about documenting AI-assisted sample selection

Do I keep the assistant’s list if I change most of it?

Yes. Keep the original output alongside the final list, and show which items were removed or added and why. The gap between the two is evidence of how the tester applied judgment, and a reviewer may ask about it.

Can the chat transcript serve as the rationale?

It can support the rationale but should not replace it. A transcript mixes reasoning with false starts and may not be retrievable later. A short standalone document that states the population, rule, method and changes is easier for a reviewer to follow.

How early should the selection rule be written down?

Before the assistant is asked for a list. If the rule was drafted after seeing the first output, record that fact in the rationale and date the draft. Presenting a rule as if it came first weakens the file.

Who should approve the final sample?

The tester who performs the test usually prepares it, and a reviewer independent of that work should approve it. Record both names and dates in the rationale. Where your methodology names a specific approver for replacements, use that role.

What if the population is too large to share with the assistant?

Give the assistant the fields the rule depends on, such as owner, value, date and status, rather than the full record set. Apply the filter in your own data tool, record the step and its output count, and confirm the assistant’s list matches the filtered population.