Run structured workflows for business continuity plans

A business continuity plan is created in the Business Continuity Workspace by opening a new plan from the Planning list, then adding scope, documentation, teams, loss scenarios, recovery strategies and recovery tasks to the plan record. A plan template can generate several of those records automatically.

Structured workflow steps for a business continuity plan

The Business Continuity Workspace, also called the BCM Configurable Workspace, runs the work in a fixed sequence. You create the plan record, attach its asset scope, document recovery capabilities, add associated plans and recovery teams, define loss scenarios with recovery strategies and recovery tasks, and then generate a PDF or Word copy of the analysis.

For help planning this work, see ServiceNow implementation.

Set up roles and ownership before you create the plan

Creating a plan from the New action on the Planning list requires sn_bcm.program_manager or sn_bcm.planner. Creating a plan from a plan template requires sn_bcp.plan_contributor or sn_bcp.plan_manager. The plan owner group list shows only groups that hold the Plan Owner role or an equivalent BCM Manager role.

In the Brazil and Australia releases, the sn_bcp.plan_manager role includes the sn_doc.writer role, which gives read and write access to document templates.

Create the plan record from the Planning list

Go to Workspaces, then Business Continuity Workspace, then Planning. Select New to open the Create Plan form, and fill in the fields on the Details tab.

  • Name: the name of the plan.
  • Template: the BCP template the plan is based on.
  • Type: the classification of the plan, such as IT, Departmental or Enterprise.
  • Business Unit and Department: the units responsible for the plan.
  • Expires: the expiration date for the plan review.

Assign plan ownership

The form needs either a Plan owner or a Plan owner group before it saves. Choose one of three ownership models.

  • Group only: select a Plan owner group and leave Plan owner empty. All members of the group get the same edit rights as an individual owner.
  • Individual only: select a Plan owner and save. This is the legacy model, and it remains supported.
  • Group and individual: select a Plan owner group, then choose a Plan owner from the list, which shows only members of that group. The group owns the record, and the individual is its point of contact.

To assign an individual who is outside the group, select that individual in Plan owner first, then pick the group in Plan owner group, and save. If that individual later leaves the group, group ownership stays in place, and another member can take over the individual role by updating Plan owner.

Scope the plan to assets and recovery objectives

Open the Scope tab and add the asset the plan protects. The tab shows the primary elements defined in the plan template. For the primary asset, the plan record holds Recovery Time Objective (RTO), Recovery Point Objective (RPO), Recovery Tier and a BIA link. Those values are pulled from the latest unarchived BIA record. If you need the analysis behind them, read the business impact analysis workflow.

Mark each asset as a primary scope or as a related asset. You can link a related asset to a primary scope inside the plan, so the relationship appears on the plan record and you can see which assets are affected when the primary scope is operationally down.

Add dependencies and refresh BIA values

When you add a dependency, the system reads the most recent Business Impact Analysis (BIA) record and fills the Finalized RTO and Finalized RPO columns from it.

If the RTO or RPO on the BIA changes after you fetch a dependency, select Update dependencies. The system then pulls the latest related assets and their relationships. A message asks you to refresh the page, and the update is recorded in a snapshot record.

Document capabilities and assign recovery teams

On the Documentation tab, record the recovery capabilities of the plan in documentation sections. The tab has a Sections panel and a Create new section tab. Each section has a Title, a Description, an Order and Contents.

On the Recovery teams tab, assign teams using Name, Description, Groups and Users. Before BCM core 12.x.x, only local recovery teams could be added to a plan. From BCM core 12.x.x, you can add global recovery teams to a plan as well.

Build loss scenarios, recovery strategies and recovery tasks

Add loss scenarios and related asset dependencies

Adding loss scenarios and adding recovery tasks both require sn_bcm.admin, sn_bcm.program_manager or sn_bcm.planner. Open the Loss scenarios tab and select Add. Give the loss scenario a Name and a Description. Then open the Related asset dependencies tab, select Add, choose the dependencies from the list, select Add again, and select Save.

A recovery strategy sets out how the assets in a loss scenario come back, and it is where you estimate the time needed to implement that strategy for each dependency. From the Brazil release, a loss scenario record has related lists for task template groups, task templates, recovery strategies and plan templates.

If the plan came from a template, loss scenarios may already exist. When the plan template has the Synchronize loss scenario assets with recovery strategy assets option turned on, the asset lists stay matched with the recovery strategy automatically.

Add recovery tasks one at a time or in bulk

Open the loss scenario, go to its Recovery tasks tab, and select New to add one task. Each recovery task has these fields: Planned order, Short description, Owner, Dependencies, Planned duration, Phase and Asset recovery level.

To fill the tab faster, select Add groups or Add tasks. The Select task template groups dialog filters groups by the loss scenario’s element definition. For a Loss of Datacenters scenario, only the groups that apply to Datacenters appear.

Set dependencies and task order

The system orders recovery tasks from their dependencies. A task with no dependency can start first and receives the higher assigned order.

A dependency can point only to a task in the same plan or in an upstream plan. An upstream plan lists the current plan as a related plan with the Downstream relationship. Choosing a task from any other plan produces the error “Recovery task dependencies should have a valid upstream dependency.”

A plan with more than 500 tasks does not reorder itself. The system displays an informational message, and you then use the Update dependencies UI action on the plan or recovery task record to set the order.

Check hierarchy, cyclic dependencies and recovery timelines

From BCM 9.x.x, parent and child plans form a hierarchy that decides which plans join an event. When an event is triggered, only the relevant child plans come into scope, and execution and dependencies cascade downward from parent to child. For the wider context, see ServiceNow disaster recovery planning.

The system checks for cyclic dependencies automatically and expects the hierarchy to flow one way, from parent plans to child plans.

From the Xanadu release, nested related plans get better cycle handling. The application detects and highlights problems that could cause a cyclic dependency while tasks run. If you try to add a link that would close a loop, the link is not allowed, and an error asks you to choose a different related plan. Activating plans beyond 10 levels, or creating hierarchical links that span more than 10 levels, also produces an error. The message suggests removing the plan before you save the record.

Generate the PDF or Word report and check ownership

When the analysis is complete, select More actions, then Generate PDF or Generate MS Word, and save a copy for reference. Review the group ownership fields in the report before you file it. From BCM Core 12.x.x, issues and group ownership details appear in separate sections of the PDF and Word reports.

A saved plan is in the Draft state and appears in the List view of the Planning records. When the plan is ready, you can submit it for approval, and the approval details appear in BCM UIB Workspace.

Questions about asset tagging, automated tasks and contributors

What does the Specific option in Tag assets change?

From the Xanadu release, the Tag assets field on a recovery task offers None, Specific and All. Choosing Specific shows the Asset scope field, which sets the assets the task can be tagged with. Tagged assets feed the impacted assets of event tasks. Only assets on newly created event tasks receive the tags.

Who builds an automated recovery task, and what happens when automation fails?

A user with access to the recovery task classifies it as either manual or automated. Administrators or low-code developers build an automation flow, and a user with the BCM planner role or above attaches it to the task. When the task moves to the Open state, the flow runs. If the automated flow fails because of a system error, a user with access to the recovery task can activate the manual task as a backup and assign a backup assignee. The assignee receives a system-generated email and completes the task flow. To rehearse this path before a real event, see business continuity plan exercises.

Who can add or remove contributors on a plan?

Users with the BCP manager, BCM lead or plan contributor role can add or remove contributors from the Contributors panel in the side bar. Contributors with the sn_bcp.plan_contributor role have read, write and delete access to the plan.

What is the Phase field on a recovery task for?

From BCM 9.x.x, BCM administrators set up active phases for plans and events. BCM managers then map those phases to recovery and event tasks. The Phase field on each recovery task is where a task is assigned to one of those phases.