OBLYTECH Logo
OBLYTECH Logo

Vendor Selection Scorecard for Salesforce Partners

Use a vendor selection scorecard for Salesforce partners that weighs delivery experience, method and handover plan against project needs, not price alone. Agree on the criteria and weights before the first sales call, score every candidate against the same evidence, and record the reasons behind each number so the decision holds up after the proposals are forgotten.

A scorecard replaces a price column with a shared method. It forces the team to agree on the needs, write down how each candidate will be judged and tie that judgment to evidence. This page covers how to build it, where the weight should sit, and how to turn the results into a decision you can defend to finance and to the sponsor.

Define what the project needs before you score anyone

A scorecard can only measure fit against a stated need. If you are still deciding which kind of Salesforce work fits, start with the Salesforce services overview before you build the list. Then write a one-page project brief that names the business problem, the teams affected, the systems the work touches and the date by which the first working release must be in use. Be specific about what is out of scope. A partner that reads a vague brief will quote a vague project, and the scores will reflect how well each firm guessed rather than how well it would deliver.

Split the needs into three groups: must-have outcomes, preferred outcomes and constraints. Constraints include internal security review, data handling rules, the number of internal staff who can give time to the project and any fixed dates such as a contract renewal. Constraints work better as pass or fail gates than as scored items. A candidate that cannot operate inside a hard constraint should drop out before scoring begins, which saves time for the candidates who remain.

Set criteria and weights before the first conversation

Agree on the criteria as a group and write the weights down before any vendor call. Weights set after reading proposals tend to favor whichever proposal the reader liked first. A workable structure uses five to seven criteria, each scored on the same scale, such as 1 to 5, with a short written description of what a 1, a 3 and a 5 look like. Without those anchors, two evaluators will score the same answer differently, and the totals will hide the disagreement.

A common set of criteria covers relevant delivery experience, the working method, the handover plan, the team that would do the work, the commercial structure and the quality of the proposal itself. For many projects, delivery experience and handover deserve the heaviest weights. A strong team working from an unclear method still carries risk. Keep the weights in one shared file with a named owner who can explain each number.

Score relevant delivery experience with evidence, not claims

Relevant experience means work that resembles yours in scope, industry, data complexity and the number of teams involved. A partner that has delivered a sales process for a company of similar size tells you more than a long list of client names. Ask for two or three reference projects, and for each one ask which roles the referee played, what was delivered, what changed after go-live and what the partner would do differently next time.

Check whether the people named in the references are the people who would staff your project. Experience held by a senior architect who will spend an hour a week on your account differs from experience held by the consultants who will configure, test and train. Score the proposed team separately from the firm’s history. Ask for the names of the individuals and the share of their time planned for your project. A team chart with job titles and no names should score low on this criterion. For a closer look at how a team can stay in place after launch, see dedicated Salesforce delivery teams.

Be careful with claims about outcomes. A reference that says the project went well is weaker evidence than one that describes a specific problem, the change made to solve it and how the users reacted. Grade evidence on three levels: stated, described and confirmed on a reference call. Reserve the top score for claims a reference call has confirmed. This keeps the scoring honest when two partners make similar promises.

Test the partner’s method against your project phases

The working method describes how the partner moves from a request to a system people use. Compare methods by walking each proposal through the same phases: discovery, design, build, testing, data preparation, training, release and early support. For each phase, ask what the partner produces, who signs it off on your side and what happens when that sign-off is delayed.

Look closely at discovery and design. A partner that moves to build without written requirements will meet the gaps during testing, when change is expensive. Ask how requirements are recorded, how the business owner confirms them and how changes after sign-off are priced and approved. A written change control step is a good sign. A partner that handles change informally may be easy to work with early on, and then struggle to explain why the budget moved.

Ask how testing is organized. A credible plan names the test scenarios, the people who will run them and the conditions for release. Ask how the partner handles data loading, because data quality problems often delay go-live more than configuration does.

Judge the handover plan as a separate scoring block

The handover plan decides whether the system keeps working after the partner’s team leaves. Score it as its own block rather than folding it into method, because many proposals describe the build in detail and say little about the transition. Ask what documentation the partner will produce, who owns the configuration decisions at the end, how administrators and end users will be trained and how knowledge moves from the partner’s team to yours.

Good handover plans name their artifacts. They list design documents, configuration records, test scripts, release notes and a support run book. They also define a support window after go-live with an agreed way to triage issues. Score a plan higher when it names an internal owner for each artifact and sets dates for knowledge transfer sessions.

Check the handover against the team that will run the system. If marketing operations will maintain lead routing after launch, the plan should show how those staff learn the assignment rules and the handoff checks, ideally with sample records they can test themselves. The same question applies to customer success managers who will rely on account health views. Ask the partner to name who answers each group’s questions in the first month. For a closer look at one such handover, review the lead assignment rules and handoff checks that marketing operations teams usually need.

Run the scoring session and record the reasons

Score each proposal independently before the group meets. Each evaluator enters a score and a sentence explaining it for each criterion. Then the group meets and discusses only the criteria where scores differ by two points or more. This keeps the loudest voice from pulling the scores together and makes disagreement visible, which is where the real conversation happens.

Keep the scorecard short enough to revisit. A one-page summary with weighted totals, the main risk for each partner and the open questions is enough for a sponsor. Record the date, the evaluators and the version of the criteria, so the decision can be explained later if the project changes direction.

Run one final check before you shortlist. Ask whether the top-scoring partner would still lead if the two heaviest criteria were weighted at half their value. If the answer changes the decision, the team has not yet agreed on what matters, and the group should revisit the weights before signing anything. For help planning this work, see Salesforce implementation.

Questions about weighting and comparing Salesforce partner proposals

How many partners should go into the scoring round?

Three to five is a workable range. Fewer than three gives you little basis for comparison, and more than five means each proposal receives less attention than it deserves.

Should the lowest price win when two partners score close together?

Not automatically. A close score means the proposals are similar on the criteria you chose, so the next step is to probe the cheapest proposal for what it leaves out. Check whether it covers testing, data loading and training at the same depth as the others, and whether changes after sign-off are priced on a clear basis. A lower fee that drops a phase often costs more by the end of the project.

What should the team do when a partner will not name its staff?

Treat the gap as a weakness in the team criterion and score it low until names and time commitments are provided. Ask for the names in writing and place the commitment in the statement of work, so the people you evaluated are the people who start. Ask how a replacement would be handled if one of them leaves, and whether you have a say in the choice.

Can the same scorecard be reused for a second project?

The structure carries over, but the weights and the pass or fail constraints should be rebuilt for each project. Keep the criteria list and the scoring anchors as a template, and rebuild the weights and gates from the new project brief.

How should a reference call be run so it stays productive?

Send the questions in advance and keep the call short. Ask the referee about one problem the project faced and how it was resolved, then ask about the partner’s delivery team rather than only the sales contact. A referee who speaks openly about a difficult stage is usually more informative than one who only praises the result.