After a Salesforce release, the process owner should review the training material that describes that process before the training team edits wording. The owner checks whether the steps still produce the outcome the business needs. Training staff then handle layout, sequence and clarity, working from a written list of changed areas.
Why the process owner reviews the guide before the training team
A training writer can confirm that a guide reads clearly and that its images match the screen a user sees. The writer cannot confirm that an approval step still follows the rule the business agreed on, because that rule lives with the people who run the process. A release can leave the wording correct while the decision behind it has moved. Reviews that involve only the training team tend to miss that kind of change.
A common failure looks like this: the screenshots are current, the steps run, and the approval threshold in the text still reflects the old rule. Often nobody notices until a case goes through the wrong path. A review that starts with the owner catches the decision change first.
Give the process owner approval rights over content and give the training team editing rights. Neither role replaces the other. The owner can say that a step is wrong. The training lead decides how to write the corrected step so that a new user can follow it without help.
Build a change list before anyone edits a guide
Start from the release items that touch your processes rather than from the full set of release content. Much of a release will not affect your training, and a short list keeps reviewers focused on the parts that do. If your admin team already reviews release items before sandbox testing, start from its notes. The release notes review before each sandbox test step is the natural starting point, so this list only needs to add the training side.
Work through the list in this order:
- Pick out each release item that changes a field, screen, approval or automation that a guide describes.
- Map each item to the training modules and guide sections that rely on it.
- Name the process owner and the training reviewer for each affected module.
- Tag each section as a wording change, a changed step or a changed decision.
- Date the list and record the release it covers, so the review can be traced later.
Items that touch no guide still belong on the list. Mark them as reviewed with no training impact and keep the line. The next reviewer then knows the item was read, instead of wondering whether it was missed.
Assign a reviewer for each type of change
The tag on each section decides who acts first. Use these roles unless your organization has a documented alternative:
- Wording change: the training writer edits the text, and the process owner checks that the meaning has not shifted.
- Changed step: the process owner confirms the new sequence, and the training writer rewrites the affected steps.
- Changed decision: the process owner restates the decision rule first. The training writer then updates the module, and the owner signs off before the module goes back into use.
- Changed label or field name: the admin lead confirms the new name in a test environment before the writer uses it.
Name a deputy for each owner in writing. A review that waits on one person tends to stall the whole cycle. Some teams hand the reviewer role to a standing group when no one inside the business has the time. The dedicated Salesforce delivery teams option is built around that arrangement.
For help planning this work, see Salesforce implementation.
Check each module against a scenario before sign-off
A written review shows intent. A scenario run shows whether the guide still works. Choose one realistic scenario per module, ideally one that users run often, and walk through it exactly as the guide describes. Record the first point where the guide and the screen disagree, then keep going to find out whether later steps still hold.
Pick scenarios from the module’s own goals, not from the release item. A changed field may sit inside a scenario that also touches steps nobody edited, and the scenario run is the place where that interaction shows up.
- Confirm that the test environment reflects the release you are reviewing. Check this on your own instance and release, because configuration changes what users see.
- Use a test user whose access matches the role the module names for each step.
- Follow each step in order, without filling gaps from memory.
- Log each mismatch with the module name, the step number and what the screen showed.
- Send the log to the process owner. The owner decides whether a mismatch is a wording fix or a changed process.
Record each review so the next release starts from the last one
A review record can be short. For each module, keep the release reviewed, the list of changed sections, the owner and reviewer names, the sign-off date and any items still open. Store these in one shared location that both teams can open. When the next release arrives, the reviewer starts from the open items instead of from memory.
The record also answers a question that comes up later, often from a new user or an auditor: who approved a particular change, and against which release. Without it, each side can assume the other checked.
Decide who needs a refresher after a change
Not every change needs a full retraining course. Base the decision on who acts on the change, not on how large the release item looks in the release notes.
- People who perform a changed step get a short note that shows the old step and the new one.
- People who only read the guide get the updated module, with a dated change note at the top.
- People who approve a changed decision walk through the new rule with the process owner before the next approval.
Keep the note short. A refresher that repeats the whole module tends to get skipped, and the old step survives in people’s habits.
Catch guides that drift between releases
Some guides go out of date without any review being triggered. Users find a workaround, stop reporting the problem, and the guide keeps describing the old step. Repeated questions from new users, support tickets that point to the same step and feedback from account owners are early signs. Add them to the review list as a separate item type so they are not lost between releases.
Teams that already review account health can add training questions to that same conversation. The customer success manager account health views page is one place to start for that kind of review. Teams that want release upkeep handled as a standing task can also read about the Salesforce support and maintenance option.
Questions about post-release training reviews
How soon after a release should the review start?
Start as soon as the release items are listed for your environment, so the affected guides are known before users next open them. Waiting for the full cycle to finish can leave a changed step in use longer than intended. Check the timing against your own release calendar, since sandbox schedules differ between teams.
What happens if the process owner is unavailable for sign-off?
The named deputy approves the change. The deputy needs the authority to change the process, not just to review wording. If no deputy has that authority, the item stays open on the record and the module is marked as under review, so people know the content is pending.
Who keeps the review record up to date?
The training team holds the record, since it edits the modules. The process owner adds the sign-off line for each change. Neither side should close an item that the other side has not signed.
What counts as a changed decision?
A decision is a point where the user chooses between paths, such as approve or return, and the rule for that choice comes from the business. If a release item changes the inputs that drive that rule, treat it as a changed decision even when the screen looks the same.
How do we know a guide is accurate if nobody has reported a problem?
A quiet queue is weak evidence that a guide is accurate. Run the scenario check on a sample of modules each cycle, and rotate the sample so that each module is tested over several cycles. Users who have found a workaround often stop reporting, so the drift signals above count for more than the absence of tickets.