Each rate card an AI answer can draw on needs one named owner accountable for its accuracy, effective dates and removal. In freight, that is often the person who approved the rates, not the team that stores the file. Record owners in a source register, and pull a superseded card from the answer set when its replacement is approved.
Assigning an owner to each rate card source
Start with an inventory of all the places the rates an assistant quotes come from. Many freight operations find more sources than they expected. The list usually includes carrier contract rate sheets, spot quote logs, accessorial schedules, fuel surcharge tables, lane-level tariffs from carriers, customer-specific agreements and internal margin rules. Each entry becomes one row in the register.
Give each row a single named person, not a team alias or a shared mailbox. The owner should be able to say, without checking anything else, which carrier or customer the rates cover, which lanes and equipment types they apply to, and when they start and stop being valid. If the person cannot answer all three, the card is not ready to be a source.
Owners move on. Name a backup for each card, and set a review date that falls well before the card expires, so the handover happens while the original owner still has the context behind the numbers.
Cards that arrive as PDF or spreadsheet files need an intake step before they can be registered. For that part of the work, see AI document knowledge workflows.
Building the source register
The register is the one place that says which card an answer may quote. Each row should hold the same fields, so that a reviewer can scan a row and know whether a rate is live. Include these fields:
- Source name and document version, with the storage location of the file
- Card type, such as contract, spot, surcharge or customer agreement
- Owner and backup owner, each as a named person
- Scope: carrier or customer, lanes, origin and destination regions, equipment types
- Effective start date and effective end date
- Status, limited to Active, Pending approval, Superseded and Retired
- Date of the last review and the name of the reviewer
Keep the register separate from the answer system. The assistant should draw only on the cards it was given, so the register is what a reviewer checks when a quoted figure looks wrong. Store the register where finance and operations can both read it, and restrict edits to the owners and their backups. For the wider freight setting around these records, see logistics and transportation.
Retirement records belong in the same evidence trail as your other pricing decisions. If your audit team plans engagements and reports findings in the platform, see audit management for logistics and transportation.
Setting the rule for removing superseded cards
A superseded card leaves the answer set on the working day its replacement is approved. Waiting until the replacement starts creates a window where two cards cover the same lane, and an answer may quote whichever one it retrieves first. Write the removal rule as steps the owner can follow without asking anyone:
- Confirm the replacement has an approved status and a start date.
- Set the old card’s status to Superseded and enter the replacement’s identifier.
- Set the old card’s effective end date to the day before the replacement starts.
- Remove the old card from the answer set and note the time of removal in the register.
- Check that answers for the affected lanes no longer cite the old card.
- Move the card to Retired once the record-keeping period set by finance has ended.
Retired cards do not return to the answer set. If the terms come back later, approve them as a new card with a new identifier, so the history of the earlier card stays intact.
If you want the removal steps to run inside the platform as a low-code app, see App Engine and low-code for logistics and transportation.
Checks before a card enters the answer set
The owner runs four checks before signing off a card. Each one catches a different kind of error. Record the outcome of each check in the register row, including the name of the person who ran it.
- Date check: the start date falls on or before the first day the card will be quoted, and any end date comes after the start date.
- Scope check: the lanes, regions, equipment types and customer names on the card match the register row exactly.
- Unit check: each rate states its unit, such as per mile, per hundredweight, per load or per stop, and the currency is written out.
- Conflict check: no other active card covers the same lane, equipment type and dates without a written precedence rule.
A card that fails the conflict check stays out of the answer set until someone decides which card takes precedence. Ask the owner of the newer card to propose the precedence and the owner of the older card to confirm it. Two people looking at the same pair of cards tend to catch more errors than one person checking alone.
Resolving disagreements between sources
Two cards will sometimes cover the same lane for the same dates. A carrier contract may set one rate while a spot quote from that carrier shows a different one. Decide precedence once, write it into the register, and apply it the same way to each answer that touches the lane. The default should follow your commercial policy, not a convenience rule such as “the newest file wins.”
When precedence cannot be settled, the answer should not present one figure as the rate. It can say that the sources differ for that lane and date, and name the owner who can resolve it. That response is less satisfying to a shipper in a hurry, but it avoids a quote the carrier later contests.
For help planning this work, see AI and ML services.
Handling surcharges, fuel tables and accessorials
Surcharge tables often carry their own effective dates, separate from the base rate card. Give them their own register rows and their own owners. A base rate can be correct while the surcharge table behind it is out of date, and an answer that combines the two will look consistent while being wrong.
Record the basis of each surcharge row, such as the index name and the publication date used for the calculation. A later reviewer can then recalculate the figure without asking the original owner to reconstruct it. Accessorial schedules follow the same pattern: name the carrier or customer, the charge, the unit, and the date the schedule was issued.
Setting the sign-off path for new cards
A new card moves through the same path each time. The submitter uploads the card and creates the register row with the status Pending approval. The owner runs the four checks. The backup reviews the scope and unit entries, since a second reader catches transcription errors in lane codes and units more readily. The owner then sets the status to Active and confirms the start date.
Testing the ownership rules before go-live
Before the first answers rely on the register, run a short test. Pick a sample of lanes that cover each carrier and customer type, then compare what the answer quotes with the active row in the register. Where the two disagree, find out which is wrong before changing either. Failures at this stage are often stale status values rather than wrong rates.
Common ownership failures to watch for
- A card with an owner who left the business and no backup named.
- Pending approval cards older than the agreed window, which usually means the owner lacks the context to approve them.
- Superseded cards still active in saved queries or answer templates after the register shows them as retired.
- Customer terms quoted to a shipper who does not hold that agreement.
- Surcharge tables that were updated in one place and left stale in another.
Many of these failures start as gaps in the register rather than problems in the answer itself. Fix the register first, then review the answer.
Questions about rate card ownership and retirement
Can one person own cards for several carriers?
Yes, but limit the load. An owner who approves cards for several carriers on the same lanes is more likely to miss a conflict between them. Split ownership by lane group or by customer agreement where you can, and keep the backup in a different reporting line when staffing allows.
Should customer-specific rates sit in the same register as carrier contracts?
Keep them in the same register, with a scope entry that names the customer and a separate status for the customer agreement. An answer prepared for one shipper should not draw on terms written for another, and the scope check is where that gets caught.
What should an answer say when a card has expired and no replacement is approved?
It should state that the rate is not confirmed for that lane and date, and name the owner who can provide a current figure. It should not fall back silently to the last known number, because an expired figure looks like a live one to the reader.
Does a retired card need its own review?
Not on the regular schedule. Ask the owner to confirm once that the card no longer appears in any saved query, answer template or spreadsheet that feeds the answer set. Then close the review and note the date in the register row.
Who approves changes to the checks themselves?
The group that owns commercial policy should approve changes to the four checks, with the finance or pricing lead signing off. Log each change with a date and the reason, so you can reconstruct which rules applied to a card when it was approved.