OBLYTECH Logo
OBLYTECH Logo

Set up cloud files for audit documents and work papers

To set up audit cloud files and work papers, a workspace administrator creates a Cloud file configuration on an engagement or audit task. The configuration names the table, sets a provider (Microsoft OneDrive by default), marks itself active and defines the condition that controls which action buttons appear in the Cloud files related list.

Roles needed before you start

Cloud file work involves two sets of roles. The Cloud file configuration module is governed by the workspace roles, and the day-to-day document tasks are governed by the audit roles. Confirm each person’s role before the build starts so that nobody is blocked halfway through the setup.

In the Cloud file configuration module, the Workspace administrator role (sn_grc_workspace.admin) has CRUD permissions, which means create, read, update and delete. The Workspace user role (sn_grc_workspace.user) has read permissions. Anyone who creates or changes a configuration therefore needs the administrator role.

The document tasks belong to the audit roles. The Auditor role (sn_audit_ws.auditor) and the Audit Supervisor role (sn_audit_ws.supervisor) can link existing documents and work papers stored on Microsoft OneDrive, and edit and read them based on the access configured for them. Changing the access rules is a Workspace administrator task (sn_grc_workspace.admin), which sets read and write access for users based on defined conditions. Reference linking, which attaches a file already connected to another GRC record, is listed in the procedure under the audit admin and audit manager roles and the Workspace user role, so confirm which of those roles your team holds before you assign it.

For a view of how these roles fit the wider team, read the audit management roles and responsibilities guide before you assign anyone to the administrator role.

Planning which records hold cloud files

Before you create anything, decide which engagements and audit tasks will hold cloud files. Not all engagements need a cloud file setup. A team that keeps working papers in one OneDrive folder per engagement has a simpler job than a team that moves files between several records. Map out the records first so the configuration matches how the team works.

Write down three things for each record type: who owns the files in Microsoft OneDrive, which documents should be sharable with other records, and which roles need write access. Those answers shape the cloud action condition and the access rules you set later.

Creating the cloud file configuration

For help planning this work, see ServiceNow implementation.

A workspace administrator creates the configuration from the Cloud file configuration module. The record holds five fields, and each one controls a different part of the behavior, so fill them in the order given in the steps below.

  • Name: the name of the document access record, for example Engagement document access.
  • Table: the table the document access record applies to, for example Engagement [sn_audit_engagement].
  • Active flag: marks the cloud file configuration as active.
  • Provider: the cloud provider for the document access record. The default option is Microsoft OneDrive.
  • Cloud action condition: filter conditions for the cloud files. The action buttons in the Cloud files related list appear based on these conditions.

Work through the record in this sequence:

  1. Enter a Name that identifies the engagement or audit task type it covers.
  2. Choose the Table that matches the records you planned.
  3. Keep the Provider on Microsoft OneDrive, the default, for files stored in OneDrive.
  4. Write the cloud action condition, then check the operators and fields available on your instance.
  5. Leave the Active flag off while you test the condition.
  6. Test the configuration on one engagement or audit task, then turn the Active flag on once the checks in the final section pass.

Writing the cloud action condition

The cloud action condition controls which action buttons appear in the Cloud files related list. A condition that is too broad shows actions on records that should not have them. A condition that is too narrow hides them from the people who do the fieldwork.

Build the condition in small steps. Start with the one field that separates the records you want from the records you do not, then add a second condition only when the first one leaves files that should be excluded. The field choices depend on the table you selected, so check them before you write the condition.

Linking and editing audit work papers as cloud files

An auditor or audit supervisor works with cloud files from the engagement or audit task record. The aim is to keep each work paper in Microsoft OneDrive, where the file already lives, and to link it to the GRC record. If the team is new to how these records relate, read the plain-language guide to ServiceNow audit management first.

Before the first link, confirm that the cloud file actions appear on the record form and that read and write file access permissions exist for the auditor and engagement leads. Then use this sequence for each work paper:

  1. Open the engagement or audit task record and find the Cloud files related list.
  2. Select Link cloud file. In the File location field, enter the folder path on Microsoft where the file sits, then enter the file name with its extension, for example .docx, .ppt or .xls. Excel, PowerPoint and Word files can all be linked this way.
  3. Decide whether the file should stay on this record only. Select Mark as non-sharable in the same pop-up if it should, because a non-sharable file cannot be linked to another record.
  4. Check the access shown on the file. A source link, which is the first GRC record the file connects to, always gets write access, and a reference link always gets read access.
  5. Edit the file in Microsoft, where the access you checked in the previous step applies.
  6. If the same file is needed on another record, select Link reference file and choose it from the list, which shows sharable files only, rather than linking a second copy.

Work papers held as cloud files stay where they are in Microsoft, and the GRC record holds the link. Agree on a folder layout before the first link is made, because the link is built from the folder path and file name you enter.

Controlling read, write and sharing

Two settings control who can do what with a linked file. The first is the sharable setting on each document. A document can be marked sharable or non-sharable. A non-sharable file cannot be shared with other records in ServiceNow, and its matching cloud file in Microsoft cannot be shared with other records either.

The second setting is access. The Workspace administrator sets file access permissions for users and groups, and only one file access permission record can exist for each combination of Table, Access permission and Users. If a user belongs to several User fields or to a Group field, the higher access applies. A condition that leaves out the fieldwork team blocks the work the access rules are meant to support.

Access also depends on how a file is connected. The first GRC record a file links to becomes its source link and gets write access. Any later record that references the same file is a reference link and gets read access, even when the configuration gives write access to the same users. Keep a copy of the condition text and the access rules in the same change note, so that a later change to one does not quietly change the other.

Checks to run after setup

Run these checks on a test engagement and a test audit task before you open the configuration to the team. Use a test account for each role so that you see what each role sees.

  1. Confirm the configuration shows the Table and Provider you intended, and that the Active flag is on.
  2. Open one record that meets the cloud action condition and one that does not. Confirm the action buttons appear on the first and not on the second.
  3. Sign in as a Workspace user and confirm that the Cloud file configuration module is read-only for that user.
  4. Link one test file from Microsoft OneDrive as an auditor, then confirm the file opens and that its read and write access matches the conditions.
  5. Mark one test file non-sharable and confirm that it cannot be linked to a second record or referenced from one.

Record what you tested and the role you used for each test, so the next administrator can repeat the checks. For the order of this work in a wider rollout, the audit management implementation roadmap sets out the sequence. Before you open the configuration to the team, also review the common audit management setup mistakes.

Questions about cloud files on audit work papers

Which record types support document integration?

Document integration is supported on engagement and audit task records, beginning with the Washington DC release. Check the release on your instance before you plan the work.

Can work papers stored in a SharePoint site be linked to GRC records?

Yes. Documents and work papers stored in a Microsoft SharePoint site can be linked to GRC records in ServiceNow, and team members can collaborate on those documents in SharePoint.

What provider applies if I leave the Provider field unchanged?

The Provider field defaults to Microsoft OneDrive, and the linking steps in this guide use OneDrive file paths. Check the choices in the Provider field on your instance before you change it.

Can one configuration cover both engagements and audit tasks?

Each document access record names one table in its Table field, and only one active configuration is permitted for a given combination of Table and Provider. A second table that needs cloud files therefore gets its own configuration, with its own cloud action condition.

What happens to existing links if a configuration is deactivated?

The Active flag marks the configuration as active. Test what happens to existing links on a test record before you clear the flag on a configuration that live engagements use.