A recovery tier gives a name and one recovery time to a similar range of recovery time objective values, so a group of business applications can share a single target. To set one up in the Classic Workspace, go to Business Continuity > General Administration > Recovery Tiers, click New, enter a name and a recovery time objective, and click Submit.
What a recovery tier does for a group of applications
A recovery tier is a named level. It takes recovery time objective (RTO) values that sit close together and assigns them one recovery time, so the business can plan around a shared target instead of tracking a separate figure for each application. The Recovery Tier record form is where that level is created.
Recovery tiers carry more than a number. They are also tied to expectations for levels of support, escalation and communication, so a tier name may be read by people who never open the record. Choose names with that audience in mind.
Tiers are used in two places. The first is BIA scores and impact assessment results, where a business impact analysis (BIA) is scored. The second is element recovery times. The module calculates the tier on BIAs and on element RTO by selecting the nearest recovery tier maximum time, so a poorly built tier list affects more than the list itself.
Plan the tier set before you open the form
Deciding what the tiers should be is the hard part, and it decides whether later assessments make sense. Work through the steps below before you create the first record. For the wider habits that support this planning, see business continuity management best practices.
- List the business applications in scope, along with the service or process each one supports.
- Ask the owner of each application how long the business can operate without it after a disruption. Record one time value per application, not a range.
- Sort the applications by that time value, shortest first.
- Group applications whose times are close enough that one recovery time would serve them. Each group becomes a candidate tier.
- Name each candidate tier for the impact it describes, and write the names down before you touch the form.
- Count the tiers. The module does not limit how many you can create, but a plan of 4 to 6 tiers is easier to explain to the people who read assessment results.
A made-up example shows the shape. Suppose a plan includes an order entry system and a payment gateway that the business can least afford to lose, a training portal that can wait a day or two, and a document archive that can wait a week. The first two share a short tier, the training portal sits in a middle tier, and the archive sits at the long end. The names describe the reason for each grouping, and the values are a starting point for the owners to confirm, not numbers to copy.
A common shape is a short top tier, such as Tier 1 Mission Critical at 2 hours, and a long bottom tier, such as Tier 5 Non-Essential at 1 week. Keep the same ordering in your own plan. For help planning this work, see ServiceNow implementation.
Create the recovery tier in the Classic Workspace
Configuring a recovery tier requires the sn_bcm.admin role. Confirm that your account has it before you start. The steps below assume you can open the Recovery Tiers list and save a new record.
- Go to Business Continuity > General Administration > Recovery Tiers.
- Click New.
- On the form, enter a name for the tier level in the Name field.
- Enter a value in the Recovery time objectives field. This metric sets how quickly the business should recover an element after a disaster.
- Click Submit.
The form has two fields, Name and Recovery time objectives, so the application list is not entered here. Keep it in a separate planning record and check it against the tiers before you run any assessments. Repeat the steps for each tier in your plan, starting with the shortest, so the record order matches the plan you wrote.
Labels and steps can differ between releases, so check each label on your own instance before you save the first record.
Check the names and times before you run assessments
Name tiers so the label carries the meaning
A name such as Tier 1 Mission Critical works because it gives the rank and the business impact in one line. A name such as Tier A tells a reader nothing when it appears in an impact assessment result. Keep names short, unique and stable.
Confirm each time with the application owner
A tier’s recovery time is a commitment the business will test against. Confirm it with the owners of the applications in that tier, as well as with the person entering the record. Ask whether the figure is the longest acceptable outage or the target for getting the service back. Those two answers are not the same, and mixing them moves applications into the wrong tier.
Leave room between neighboring tiers
The module assigns the nearest recovery tier maximum time, so two tiers with close values leave little room for a clean assignment. Read each tier’s value against the tiers on either side of it. If two tiers would describe the same kind of application, merge them or widen the gap before you finish the list.
How tiers flow into BIA results and element recovery times
Once tiers exist, they shape two outputs: the BIA score with its impact assessment result, and the recovery time an element receives. Both come from the same rule, which picks the nearest recovery tier maximum time. The tier list therefore drives your assessments, and a change to the list changes what that rule returns.
Test the results on a small batch before you run a full cycle. Pick a handful of elements that span your tiers, include at least one that sits near a boundary, and confirm each one receives the tier the owner expects. Fixing a boundary problem on five elements is quicker than fixing it across a full register.
Recovery tiers are one input to a wider recovery plan. For that broader view, see ServiceNow disaster recovery planning. Once assessment results need action, the handling steps are in managing business continuity issues from the workspace.
Common setup mistakes to avoid
Setup problems tend to start in the planning stage rather than in the form. These are the patterns to watch for.
- Creating tiers before the application list is agreed, so names and times get changed after assessments have started.
- Recording recovery times that different people read in different ways, such as a range in one tier and a single figure in another.
- Splitting tiers that differ by a few hours but share the same owner and response, which adds records without changing any decision.
- Naming tiers after their time value, so the label becomes wrong when the time is adjusted.
- Placing all applications in one tier to avoid the grouping decisions.
For a wider list of pitfalls, read common ServiceNow business continuity management mistakes and how to avoid them.
Questions about approving, reviewing and testing tiers
Who should approve the recovery time for each tier?
The people who own the applications should agree to each time, because they carry the consequences when a target is missed. The person entering the record should not settle the figure alone. Note the approver for each tier in your planning record so the decision can be revisited later.
What should I check after I change a tier’s recovery time?
A change to a tier’s recovery time can change which tier the module selects for nearby values. Review the assessments and element recovery times that depended on that tier, and confirm their results still match what the owner expects. Record the reason for the change in the same planning record, so the next reviewer can see why the value moved.
How should I test tier assignments before a full cycle?
Use elements that were not part of the plan, so the test does not only confirm the numbers you started with. Include values exactly on each tier boundary and values one step either side. Write the expected tier and the actual tier for each test. A mismatch shows whether the plan or the entry needs correcting.
How often should the tier list be reviewed?
Review it when the application list changes, when an assessment cycle turns up a mismatch, or when an owner reports that a recovery time no longer matches how the service is used. Agree the cadence with whoever leads business continuity in your organization, and write it into the same planning record as the tier decisions.