OBLYTECH Logo
OBLYTECH Logo

Run structured workflows for a business impact analysis

A business impact analysis (BIA) predicts what a disruption would do to a business process or business function. In the ServiceNow BCM application, a structured workflow takes the BIA owner through impact categories, dependency assessment, RTO and RPO results and approval by the BCM lead.

What a business impact analysis measures

A business process is a set of tasks an organization performs to deliver a service or product to customers. When that process stops, the cost can show up as lost revenue, legal exposure, workforce disruption or reputational damage. A business impact analysis rates those effects before an outage happens. It also records which applications, technology and vendors each process depends on, because a disruption often spreads along those links.

The output is a set of recovery targets rather than a single score. Each impact category receives a recovery time objective (RTO). The analysis as a whole receives an overall RTO and a recovery tier, and the questionnaire produces a recovery point objective (RPO) for the categories that contribute to it.

Current releases call the interface the BCM UI Builder Workspace. Some releases also use the names Business Continuity Workspace and BCM Configurable Workspace, so match the menu names to your instance and release before you follow a step.

Set up impact ratings before the first assessment

The BCM administrator defines the impact categories and their ratings, and decides whether each rating is tolerable for a business process. The BCM application calculates RTO and RPO from those ratings and from the assessment questions, so the calculations have nothing to work from until the administrator has set up both.

Before you create the first record, ask the administrator for three things: the impact categories in use, the rating labels and their values, and the ratings the organization has marked as intolerable. The questions for each category appear in the Recovery time objective assessment tab, or in the Recovery point objective assessment tab for categories that feed the RPO. The ratings for a category sit in the Impact Ratings related list on the Impact Category record.

Reading the Impact Ratings table

Each rating row has a Tolerable field and a disruption duration. A rating with Tolerable set to false is non-tolerable, and its disruption duration is the candidate RTO for that category. A rating with Tolerable set to true does not set the RTO while a non-tolerable rating exists in the same category.

Sort order decides which rating wins. The calculation reads the ratings in alphanumeric order and uses the first one marked non-tolerable. Number prefixes such as 01 – Low, 02 – Moderate and 03 – High make that order visible.

Calculate the RTO for each impact category

The RTO for a category comes from one of two places. If at least one rating is non-tolerable, the calculation uses the disruption duration of the first non-tolerable rating in sort order. If all ratings are tolerable, it uses the value in the Maximum RTO value field of the template. The calculation does not look for the shortest duration, so a later rating with a shorter duration does not replace the first non-tolerable one.

Take a regulatory impact category where the Low rating is non-tolerable with a disruption duration of 4 hours. The category RTO comes out above 4 hours, even when the Moderate rating has a shorter duration. If Moderate is the non-tolerable rating instead, with a 24-hour duration, the result is above 24 hours. If High is the non-tolerable rating, at 72 hours, the result is above 72 hours. When all three ratings are tolerable and the Maximum RTO value is one month, the category RTO is one month.

Calculate RPO category scores from the questionnaire

An impact category that contributes to the recovery point objective is scored from its questions rather than from a duration. Each impact analysis question in that RPO category carries a numeric value, for example Medium at 20 or High at 30. The category score is the maximum value across the questions in that category, and it is stored in the Impact Category Results table, sn_bia_category_result. The highest category score across all RPO categories then falls within a threshold range in the Score Timeframe Mapping table, and that range sets the RPO.

Because the score takes the maximum, one answer can set the score for the whole category. Review each answer in the category before you submit the analysis. After you save the questionnaire, open the Impact Category Results table and compare the stored score with the highest answer you gave. If the two differ, review the question list for that category before you move on.

Roll up the BIA result and recovery tier

The BIA RTO is the lowest tolerable downtime across its impact categories. The workflow recalculates it when you update the disruption duration of an impact category. A change in one category can therefore move the overall result while the others stay the same, so read the BIA figure again after each edit.

The recovery tier follows from the recalculated RTO. Tiers vary by organization. A sample table maps the RTO values Immediate, 1 Hour and 4 Hours to Mission Critical. Use your organization’s own tier table, because a different table can place the same RTO in a different tier. If the tolerable downtime has no tier in that table, the RTO cannot be calculated at all.

Map BIA results to operational resilience tolerances

Teams that also manage operational resilience can compare these RTO values with their impact tolerances. The impact tolerance and scenario analysis guide covers testing those tolerances against a disruption scenario.

Run the BIA workflow in the right order

The owner moves the analysis through four tasks. The approval buttons need the Pending approval state, so submission comes before approval.

  1. Create the business impact analysis in the BCM UI Builder Workspace.
  2. Assess the impact categories and dependencies, submit the analysis for review, then submit it for approval so it moves to Pending approval.
  3. As the BCM lead, approve the BIA.
  4. Generate a PDF or Microsoft Word copy of the analysis and save it for reference.

Generate the copy after approval, so the saved file matches what the BCM lead signed off. The Generate PDF action is available from the Review state onward, so an earlier copy is possible, but it records the analysis before sign-off. For the workflow as its own page, see the BCM business impact analysis workflow page.

Approve or reject a BIA as the BCM lead

The BIA owner or the BCM lead for an analysis can approve it. The Approve and Reject buttons on the BIA form appear when all three of these conditions are fulfilled:

  • The user has the sn_bia.bia_manager role.
  • The BIA is in the Pending approval state.
  • No approval record has been created for the BIA.

The third condition is the one that is easiest to miss. If an approval record already exists, the buttons stay hidden even for a user who holds the role, so check the approval records on the BIA before you assume the role is missing. For the full approval procedure, see approving a business impact analysis as the owner or BCM lead.

Keep dependencies current with CMDB updates

Dependencies come only from CMDB relationships, and the BIA’s Applies to field sets the asset the lookup starts from. The dependency update configuration can:

  • Schedule automated updates of dependencies from the CMDB.
  • Notify owners, so they review pending updates and then update dependencies by hand.

For critical processes, a scheduled update that waits for review gives the owner a checkpoint before recovery figures move. Configuration steps for dependency updates are in configuring impact analysis dependency updates.

Plan the first analysis cycle

Start with the processes that would cause the greatest damage if they stopped. A short list of critical processes keeps the first cycle manageable and lets owners learn the screens and the calculation on work that matters. Set the review cycle for critical processes with the BCM lead.

Before the first record, agree on four things: who owns each process, who acts as BCM lead for each analysis, which dependencies come from CMDB updates and which will be entered by hand, and which impact categories feed the RPO calculation.

For help planning this work, see ServiceNow implementation.

Check the analysis before approval

Run these checks before you submit the analysis.

  • Each impact category shows an RTO that comes from a non-tolerable rating or from the Maximum RTO value field.
  • Each RPO category has a score recorded in the Impact Category Results table.
  • The BIA RTO matches the lowest tolerable downtime across the impact categories.
  • The recovery tier matches the BIA RTO in your organization’s tier table.
  • Each dependency reflects a recent CMDB update or a manual entry the owner can explain.

If a check fails, correct the input, such as a rating, an answer or a dependency, and let the workflow recalculate. Change the input rather than the calculated figure, since the figure is recalculated from the inputs.

Questions about RTO, RPO and the BIA workflow

What do RTO and RPO mean in a business impact analysis?

The recovery time objective is the length of time an organization can handle a disruption to a process or item without a significant effect on operations. The recovery point objective is the amount of data loss it can handle on the same basis. Both values come from the impact ratings and questionnaire answers described above.

Where can the 360° view be opened during the analysis?

You can open the 360° view at any point while you create a business impact analysis. It shows the analysis together with its associated entities, so you can check relationships while you work through the impact categories.

Can a BIA use the Smart Assessment Engine?

From the Yokohama release, the BIA template is integrated with the Smart Assessment Engine. You can use Smart Assessment alongside the legacy assessment, so confirm which assessment your template uses before you enter answers. The RTO and RPO calculations rely on the Smart Assessment applications, so keep them at a compatible version.