To isolate a host through Carbon Black, open the security incident, select the affected configuration items on its Configuration Items tab, and choose Isolate Host from the Actions on selected rows menu. That action launches the Security Operations – Isolate Host flow, which uses the configured queries to search for configuration items and passes them to the Carbon Black implementation. The implementation gets the sensor ID and turns on network isolation.
How the Isolate Host flow relates to the Carbon Black integration
Its job is to identify the configuration items to act on and hand the work to an integration that can carry out the vendor-specific steps. The high-level flow is independent of any one integration, so another integration that provides an implementation can fulfill the same request.
Three flows make up the Carbon Black side of this work:
- Security Operations – Isolate Host Flow is the high-level flow. It uses the configured queries to search for a set of configuration items and calls an integration to fulfill the request.
- Security Operations Carbon Black Integration – Isolate Host Flow is the Carbon Black implementation. The high-level flow launches it.
- Security Operations Carbon Black Integration- Remove Host Isolation Flow restores communication with an isolated host.
The isolation itself belongs to the Isolate Host capability. That capability restricts system connections between a host and other devices, and it runs against configuration items (CIs). Its flow accepts one or more CIs and, optionally, an implementation. You can name a specific implementation, or let the flow attempt isolation through all implementations.
If no implementations are available, capability actions do not appear in product menus. When the Isolate Host action is missing, check the implementation records first.
Teams comparing this pattern across risk applications can review the integrated risk management integration patterns and the governance, risk and compliance integration patterns.
Configure the Carbon Black integration before the first run
The flow needs a working Carbon Black configuration record, so set that up first. For the wider integration, see the Carbon Black integration page.
- Download the integration from the ServiceNow Store.
- After the installation finishes, open the Carbon Black website and obtain the Endpoint Base URL and API Token from your profile.
- In your instance, go to Security Operations > Integrations > Integration Configurations.
- In the Carbon Black card, select New.
- Complete the fields, then select Submit.
The new record includes these fields:
- Name: the name of this configuration.
- Endpoint Base: the base URL of the Carbon Black API, copied from the Carbon Black site.
- API Token: the API token copied from the Carbon Black site.
- Use MID Server: turn this on to have the integration route its requests through a MID Server.
- MID Server: select Any to use any active MID Server, or pick a specific MID Server name.
- Enable Isolate Host: when this is checked, configuration items you select on a security incident can be isolated from its Configuration Items tab.
Saving the configuration activates workflows. Open the Workflow Editor to review them before the first run. After you select Submit, the integration card appears. To return to the full list of cards, select No in the Show Configurations drop-down list.
For help planning this work, see ServiceNow implementation.
Roles needed for each step
- Downloading the integration and creating the Carbon Black configuration: sn_si_admin.
- Running the Isolate Host flow from a security incident, and running the Carbon Black implementation: sn_si.analyst.
- Configuring capabilities in the framework: sn_si.admin, flow_designer, and action_designer.
- Selecting the Active check box on an implementation record for an installed integration: sn_si.admin.
Run the isolation from a security incident
- Open the security incident record. Your user needs the sn_si.analyst role for this step.
- Open the Configuration Items tab on the security incident related list.
- Select the configuration items to isolate. Check each name before you continue, because a mistaken selection cuts a host off from the network.
- Select Isolate Host in the Actions on selected rows drop-down menu. In the Isolate Host dialog box, choose the implementation, then select Isolate Host. The flow execution audit then appears in the work notes, and the Carbon Black implementation runs the steps listed below.
- Open Security Operations > Integrations > Capability Executions to see the outcome of the run.
What the Carbon Black implementation does in each step
The Carbon Black implementation runs its activities in the order below. When a host does not isolate, the order shows you which step to examine first.
- Legacy: Execution Tracking – Begin (CIs) flow action. It starts the audit record for the run. This action is no longer deployed, enhanced, or supported, and Capability Implementation Execution replaces it, so use the Capability Executions record to review the run.
- Get IP from CI. It determines the IPv4 address associated with each configuration item.
- Collect Carbon Black configurations. It gathers the Carbon Black settings that the rest of the flow uses.
- Get Sensor ID. It gathers the sensor identifiers the flow needs.
- Set Network Isolation Enabled. It turns on network isolation.
- Update Sensor. It updates the sensor so the host or endpoint is isolated, and it returns the Isolate Host result.
- Failure and complete tracking. The Legacy Capability Execution Tracking – Failure and Complete flow actions record how the run ended.
The Collect Carbon Black Configurations flow action returns either Success or Failure. Failure means an error occurred while the configuration was being verified, so read the error text in the activity output first.
Check the scope and gather context before you isolate
Isolation cuts off a host’s network connections, so the selection step deserves a check before the run. The Carbon Black integration’s Use section also lists related actions for the same incident: the Get Running Processes flow, the Block Request flow, and the Isolate Host and Remove Host Isolation flows.
The Get Running Processes and Get Network Statistics capabilities retrieve running processes and active network connections from an endpoint or host.
The Capability – Determine CIs activity decides which CIs enter the workflow. Review the CI list on the incident before you start the run.
Capability settings for each Carbon Black implementation
Implementation records sit under Integration Capabilities (Flows). Navigate to All > Security Operations > Integrations > Integration Capabilities (Flows), open the Isolate Host capability, and select the Capability Implementations tab. Check these fields on the Carbon Black implementation:
- Active: turns the implementation on or off. If you configure the integration from the integration tile, this flag is set to Active automatically.
- Order: the order in which the integrations run.
- Configuration: the integration configuration the implementation uses. Configuring through the integration tile resets this value to the new configuration you created.
- Retry Limit and Retry After: the number of retries allowed for a failed request, and the wait before each retry. Retries apply when the integration is set to retry a request, for example when a license limit has been exceeded for a period or the service is down.
To use the Carbon Black implementation with an installed integration, the sn_si.admin role is needed to select the Active check box on the implementation record. Confirm that the record points to the correct configuration. The configuration name matches the tile name shown under Integration Configurations when Show Configurations is set to Yes.
Troubleshoot an isolation run
- Open Security Operations > Integrations > Capability Executions, find the run, and open its record for the details.
- Read the output of the failing activity. For configuration problems, start with the Collect Carbon Black Configurations result.
- Recheck the Carbon Black configuration fields: Endpoint Base, API Token, the MID Server choice, and whether Enable Isolate Host is checked.
- Confirm that the Carbon Black implementation is active and points to the right configuration record.
Retry the isolation only after you know the cause. A retry against an unchanged configuration typically fails the same way.
Restore communication with an isolated host
The Remove Host Isolation flow unblocks communication with a specified host or endpoint in a Carbon Black system. It is not part of a capability, so it needs a custom orchestration before it can run.
Its activities are:
- Get IP from CI activity.
- If successful, the Collect Carbon Black Configurations flow action.
- The Get Sensor ID flow action.
- A condition that checks whether the device supports isolation and whether its isolation state is not disabled.
- The Update Sensor activity, which returns the Isolate Host result.
Test the restore path on a non-production host first, and check the sensor state after the run.
Release differences to check on your instance
Brazil, Australia, and Zurich label the audit activities with a Legacy prefix, while Yokohama lists the same activities without it. The Brazil and Australia topics were updated in 2026, and the Zurich and Yokohama topics were updated in 2025.
The Carbon Black integration requires a minimum application version of 10.3.1. The Remove Host Isolation details and the capability settings above are taken from the Brazil release, so check them against the release your instance runs.
Questions about Carbon Black isolation runs and settings
How long do completed capability executions stay in the list?
Completed executions are archived after 30 days.
Can I limit how many isolation requests the Carbon Black integration sends?
Yes, on the implementation record. Max Concurrent Reqs sets the maximum number of concurrent implementation requests, and 0 means there is no limit. Total Requests and Total Reqs Period work together to cap the number of requests in a period; for example, four requests per minute.
Why does the scheduled job matter when runs do not start?
The Process Capability Implementations job runs at 15-second intervals and schedules and manages the capability implementation execution flows. You can disable it on the Security Administration Properties page, under Security Incident > Administration > Properties. If runs do not start after you configure the integration, confirm that this job is still enabled.
How do I stop an isolation run that hangs?
Set Timeout Period on the Carbon Black implementation record. It is the maximum duration before the implementation flow is canceled, and 0 means there is no timeout. Pick a value that fits how long a Carbon Black update takes in your environment.
Who owns a hospital security-operations queue in ServiceNow, and which security events must be reported to a central health security operations center?
Under NSW Health’s January 2026 cyber security policy, each health organization must access and monitor its own security-operations queue in ServiceNow. Security events and incidents must be documented and reported to the central health security operations function through the ServiceNow integration.
Separate the monitoring duty from the reporting duty
The policy sets two obligations that teams often merge. The first is that each organization accesses and monitors the queue. The second is that events and incidents are documented and reported to the central function. Watching the queue does not satisfy the reporting duty on its own. If no route carries a queue item to the central function, monitoring can be complete while the report does not leave the hospital.
Assign queue roles inside the hospital
The policy names the organization, not a team, so write the roles down. A workable map covers four functions:
- Triage owner: sets severity on each new item and records the reason.
- Escalation owner: decides which items go to the central function.
- Closure owner: confirms containment and records the outcome on the item.
- Integration owner: keeps the reporting route working and retests it after each release or feed change.
Decide which events fall under the reporting duty
The policy requires reporting of security events and incidents. Each organization has to draw that line itself. Sort queue items into detections with no confirmed effect, incidents where a system or data was affected, and items still awaiting a decision. Give each group a reporting outcome: report, hold with a stated reason, or not reportable. The common failure is reporting confirmed incidents while detections stay in the queue, which leaves the detection stage unreported.
Steps to build the reporting route
- Record the policy section that sets the reporting duty, with its issue date.
- Map every queue state to a reporting outcome.
- Add record fields for the outcome, decision time, decision owner and central reference number.
- Test the route with a sample event before live use, and confirm the central function receives it.
- Repeat the mapping review after each platform release and any change to the detection feed.
Questions to put to a vendor or integrator
- Which SecOps applications and license tiers the proposal includes, and which it assumes you already hold.
- Whether alerts reach ServiceNow directly from detection tools or pass through another platform first.
- Who maintains the central reporting integration after go-live.
What the reporting duty does not change
The policy does not show that buying SecOps replaces detection tooling or prevents breaches. ServiceNow records and routes the queue work. The policy is not an independent assurance finding, so treat it as a statement of duty, not proof that controls work.