OBLYTECH Logo
OBLYTECH Logo

Add an authority document to an agency

To add an authority document to a regulatory agency in Compliance Workspace, open the agency record, select Add in the Authority Documents related list, choose one or more documents, and select Save. You need the compliance_case_manager role. Linking the document keeps each regulation traceable to the rulebook or guideline it came from.

What the link does for traceability

An authority document is the stored record of a regulatory publication, such as a rulebook or a guideline. When you attach one to the regulatory agency that enforces the rule, the regulation gets a fixed reference point. A case or a regulatory change that cites that regulation can then be traced back to the document it came from.

The link is a reference between two records. It does not replace the document’s own fields, such as its version number and validity dates. Read those fields before you attach a document.

Prerequisites, roles and the Regulatory Agency Library

The agency steps belong to the Regulatory Agency Library application. An administrator with the admin role can activate the GRC: Regulatory Agency Library application from the ServiceNow Store. The application includes demo data and provides access to regulatory body profiles. Check whether the demo records are present on your instance before you load real agency data.

Before you start, confirm three things: the regulatory agency record exists, the authority document exists, and you hold the role the step requires. The roles for the work in this guide are:

  • Adding an authority document to an agency: compliance_case_manager.
  • Adding a jurisdiction or a regulatory contact to an agency: compliance_case_manager.
  • Creating an authority document in Compliance Workspace: sn_compliance_ws.corporate_compliance_analyst, sn_compliance_ws.corporate_compliance_manager, or sn_compliance_ws.it_compliance_manager.
  • Clearing the Active check box on an authority document: sn_compliance.admin or sn_compliance.manager.

If your practice areas are not set up yet, the steps for adding an intake form to a practice area cover that related setup task.

Steps to add an authority document to an agency

Use this sequence for each agency record you want to update.

  1. Navigate to All > Compliance Workspace > Lists > Regulatory information > Regulatory agencies.
  2. Select the agency record you want to update.
  3. In the Authority Documents related list, select Add.
  4. Choose one or more authority documents from the list. The example for this step is a set of GDPR guidelines.
  5. Select Save.

After you save, check the Authority Documents related list on the agency record and confirm that each document you chose is listed. If a document is wrong, raise it with whoever maintains the regulatory library before the agency is used on a compliance case.

Choosing the right document to link

Check the Source and Source ID fields on each candidate before you select it. A record imported from UCF shows UCF in its non-editable Source field, so an entry you created by hand with a similar name will look different. Compare the Version, Valid From and Valid To values as well, because two copies of the same guideline can carry different version numbers.

When an agency answers to more than one publication, link all of them in one pass.

For how access works to documents tied to a legal matter, read the page on document access in a legal matter. Check it before a linked document is used in a live case.

Creating an authority document first

If the document is not in the list, create it before you open the agency. Navigate to All > Policy and Compliance > Compliance Workspace, select the Create list, and select Authority document. Fill in the fields below and select Save.

  • Name: the name of the document.
  • Number: read-only, and filled in automatically with a unique identification number.
  • Source: non-editable, and shows where the policy came from. A statement taken from the UCF import shows UCF.
  • Source ID: the identification number the source uses to catalog the document.
  • Version: the version number the source uses to identify the document.
  • Common name: an abbreviated form of the Name field.
  • Category: the category for the document.
  • Type: the document type, chosen from Audit Guideline, Best Practice Guideline, Bill or Act, Contractual Obligation, International or National Standard, Not Set, Organizational Directive, Regulation of Statute, Safe Harbor, Self-Regulatory Body Requirement, or Vendor Documentation.
  • Valid From: the date and time the policy becomes valid.
  • Valid To: the date and time the policy is no longer valid.
  • Url: the URL of the stored authority document.
  • Description: more information about the document.

After you save, the Overview page opens and shows the Description and the record details in the sidebar.

Mapping issues and retiring a document

Mapping issues to the document

Mapping existing issues to an authority document lowers the count of open issues on that document.

  1. From the Overview page, select Issues.
  2. Select Add.
  3. In the Issues pop-up, select the related issue or issues.
  4. Select Add.

To create a new issue for the document, select New. To take an issue off the document, select the issue and click Remove. Remove deletes the mapping between the two records and leaves the issue record in place.

Retiring a document

The Active check box indicates whether an authority document has been retired. To retire a document, go to All > Policy and Compliance > Compliance > Authority Documents, open the document, and clear the Active check box. Use the role listed above for this action.

Documents imported from UCF cannot have Active cleared, because the form is read-only for those records. Plan the retirement with the team that maintains the import instead.

In the Retired state, the New, Add and Remove buttons in the Issues section are not available. If an issue mapping will not change, check the document’s state first.

Jurisdictions, contacts and library roles

An agency record can carry authority documents, jurisdictions and regulatory contacts. Set these up together so the agency’s scope and contacts match its documents.

Adding a jurisdiction

Jurisdictions define the geographic scope of a regulatory agency, so regulatory changes map to the regions that apply. Navigate to All > Compliance Workspace > Lists > Regulatory information > Regulatory agencies, select the agency, and in the Jurisdictions related list select Add. Choose one or more jurisdictions, for example North America, EU or APAC, and select Save. The jurisdictions must already exist.

Adding a regulatory contact

Regulatory contacts are notified about case reporting, case audits and case closures. When you add a contact, decide which jurisdiction the contact belongs to. Navigate to All > Compliance Workspace > Lists > Regulatory information > Regulatory contacts, select New, complete the Create New Regulatory Contact form, and select Save. You can map one contact or several contacts to a regulatory agency.

Library roles and tables

The Regulatory Agency Library reader role, sn_reg_body_mgmt.reader, can access and read regulatory agencies, regulatory contacts and jurisdictions. The writer role, sn_reg_body_mgmt.writer, adds the ability to update and delete those records.

Activating the application installs six tables: Regulatory Agency (sn_reg_body_mgmt_regulatory_agency), Regulatory Contact (sn_reg_body_mgmt_regulatory_contact), Regulatory Agency to jurisdiction (sn_reg_body_mgmt_m2m_reg_agency_jurisdiction), Jurisdiction (sn_reg_body_mgmt_jurisdiction), Auto Date Calculation (sn_reg_body_mgmt_auto_date_calculation) and Agency Profile (sn_reg_body_mgmt_agency_profile).

The many-to-many table, sn_reg_body_mgmt_m2m_reg_agency_jurisdiction, holds the agency and jurisdiction pairs, so a report that lists agencies by jurisdiction can be built from that table. For reporting on other linked records, see adding a business process to operational resilience reporting.

Checks after linking and troubleshooting

Checks after you link documents

Run these checks on one test agency before you train users on the procedure.

  1. Reopen the agency record and confirm each document appears in the Authority Documents related list.
  2. Open each linked document and confirm its Version, Valid From and Valid To values match the source copy.
  3. Sign in as a user with the compliance_case_manager role and repeat the add steps on the test agency.
  4. Sign in as a user with the reader role and confirm that you cannot edit the agency record.

Troubleshooting a document that is missing from the list

When the document does not appear in the list, work through these causes in order.

  1. Confirm the document exists under the Create list in Compliance Workspace. If it does not, create it using the fields described above.
  2. Check your role against the list above. Adding a document to an agency requires compliance_case_manager.
  3. Open the document and check its state. If the Active check box is cleared, the document has been retired, so ask the library maintainers whether a newer version should be linked.
  4. Check that the Regulatory Agency Library application is activated.

Release labels to check before rollout

Menu paths, role names and field lists in this area can differ between releases, so confirm the menu path, role names and Type values on your instance before you train users. For help planning this rollout across your agencies, see ServiceNow implementation.

Questions about agency emails, contacts and linking

Where can I see the emails sent to an agency?

The Overview tab of a regulatory agency shows pie charts of the total emails sent to each regulator domain, so you can compare the volume sent to each domain. From the agency record, you can drill down to the email tracker page, which filters the list to emails sent for that agency.

Can a regulatory contact belong to a jurisdiction instead of an agency?

Yes. The Create New Regulatory Contact form creates a contact for either a regulatory agency or a jurisdiction. Settle the jurisdiction before you open the form.

Can one authority document be linked to several agencies?

The steps above work from the agency record. Confirm on a test agency that the same document can be selected for more than one agency before you plan a shared reference set.

Does clearing Active delete an authority document?

Clearing Active marks the document as retired. None of the steps in this guide delete the record, so keep retirement and deletion as separate decisions.

Which CMMC and NIST SP 800-171 revision must a contractor record against each requirement, and how is a newer NIST revision tracked without replacing the assessed baseline?

A contractor records the CMMC level and the NIST SP 800-171 revision that the contract or subcontract flow-down names, which for CMMC Level 2 is Revision 2 with its 110 requirements. NIST Revision 3 is tracked as a separate, dated record, so the assessed baseline stays unchanged while newer requirements are planned.

Start with the level and revision the contract names

Level 1 covers 15 FAR safeguarding requirements for federal contract information. Level 2 covers 110 NIST SP 800-171 Revision 2 requirements, and Level 3 adds selected enhanced requirements from NIST SP 800-172.

NIST published Revision 3 on May 14, 2024, but that did not rewrite the CMMC final rule, published October 15, 2024. The common mistake is treating the newest revision as the requirement set by default. The record then carries controls the assessed baseline does not score.

What to record against each requirement

Each requirement row should trace back to the contract and forward to its evidence. A usable row holds:

  • The CMMC level the contract requires for the information in scope.
  • The NIST SP 800-171 revision the requirement is drawn from, which for Level 2 is Revision 2.
  • The requirement identifier in that revision, so a reviewer finds the same wording.
  • The implementation status, the named owner, and the evidence location.

Track Revision 3 as its own baseline record

Do not edit the control library in place to move from Revision 2 to Revision 3. Keep one record per revision. The Revision 2 record stays the assessed baseline while the contract names it. The Revision 3 record is a planning reference with its own version value and valid-from date.

In a Compliance Workspace setup, the authority document record is a natural home for each revision. The Version field holds the revision number, and Valid From and Valid To hold the period each record applies. Leave the Active check box selected on the Revision 2 record for as long as the contract names that revision.

Map the two revisions before anything changes

  1. List every Revision 2 requirement in the CMMC level in scope, with its identifier and status.
  2. Create the Revision 3 record and add its requirements with the same identifier fields.
  3. Pair each Revision 2 requirement with its closest Revision 3 match, and flag the unmatched ones.
  4. Change the assessed mapping only after the contract or flow-down names the new revision.

What to ask the prime or contracting officer in writing

Ask which CMMC level and NIST revision the contract names, and whether any flow-down names a different one. As of November 2026, the government has suspended CMMC Phase II while Phase I self-assessments remain in place, so ask how that affects the requirement. Ask whether an assessment or affirmation is tied to a specific revision, and whether work already scored against Revision 2 is affected if Revision 3 applies later.