Fraud score ranges control how a claim’s fraud score appears on the gauge as high, average or low risk. An admin sets the minimum and maximum values on the Config tab, then the value, color and label for each range through Configure Ranges. Changing the ranges means getting the change itself right, putting the roles in place first, and running the checks once the new bands are live.
What the fraud score ranges control
The gauge on the Fraud score tab shows where a score falls between a minimum and a maximum that you define. Each band on that scale has its own color and label, so an adjuster can read the risk level without working out the number. The gauge is the visual display. The overall fraud score is the number shown beside it on the same page.
Roles and scope before you change anything
Configuring the ranges requires the admin role. The people who use the result are different. An adjuster, a processor or a manager can generate and view a fraud score on a claim case or from an adjuster task, and they see the bands you set. Admins can also use the baseline fraud score page as a starting point for a customized scoring page for their own line of business.
The configuration applies beyond the record you edit. Any change made here appears at the Financial Services Operations Core level and applies to all FSO Core applications. Before you adjust a band that a second line of business relies on, list the applications that will show the new gauge. Personal Lines Claims and Commercial Lines Claims both have a fraud score page, so a change made for one can reach the other.
If a Different application scope message appears when you open the record, the procedure includes an optional step: select Edit in original scope. Note which scope you are editing in before you save, so you can confirm the change lands in the application you intended.
Set the minimum, maximum and colored bands step by step
- Navigate to All > Now Experience Framework > UI Builder > Page collections.
- Select the entry CSM default record post-Details > Fraud score > Default.
- If a Different application scope message appears, select Edit in original scope. This step is optional.
- On the configuration panel, open the Config tab and select Ranges. Set the minimum and maximum values.
- Select Configure Ranges. Set the value, color and label for each range.
- Select Apply.
Set the minimum and maximum in step four before you define the bands in step five. The procedure runs in that order, so follow it when you change the scale and the bands together.
Enable the fraud score page on the claim
The Fraud score page has to be enabled on the claim case before an adjuster, processor or manager can view it. The enable procedure is a separate admin task. It starts with the CSM default record page under the CSM/FSM Configurable Workspace, and the page order is then set from that default record page.
The Fraud score page is held in UI Builder as a page collection, alongside the Claim workspace and Claim summary pages. Those entries have similar names, so check the entry you have open before you save a change.
Set variant conditions and page order for the claim case pages
The claim workspace, fraud score and claim summary pages all sit on the claim case. A claims manager, adjuster or processor can view them only after an admin has enabled them, so confirm that your account holds the admin role before you open UI Builder.
- Navigate to All > Now Experience Framework > UI Builder.
- Enable the CSM default record page under CSM/FSM Configurable Workspace.
- From the CSM default record page, set the page order.
- Set the variant conditions on the claims page variants, starting with the record page for the adjuster task.
The record page for the adjuster task is a variant of the CSM default record page. To reach it, go to CSM Configurable Workspace, then Record, then Claim Adjuster Record Page. Set the conditions for each variant separately, because the conditions decide when each record page is used.
Each of the three pages has its own page collection in UI Builder. Open the one you need before you make a change:
- Claim workspace: CSM default record post-Details > Claim workspace > Claim Workspace Default.
- Fraud score: CSM default record post-Details > Fraud score > Default.
- Claim summary: CSM default record pre-Details > Claim summary > Claim Summary Default, or CSM default record post-Details > Claim Summary > Claim Summary On Adjuster.
The claim summary page has two entries, one placed before the details section and one after it.
How the fraud score page reads on a claim
After you select Apply, open a claim case or adjuster task and select the Fraud score tab to see the new bands. The ranges drive the gauge, and the other parts of the page sit beside it, so a reviewer reads them together.
- Score gauge: shows a high, average or low risk score based on the claim data passed in. The ranges you set define the high, average and low bands.
- Fraud score: the overall fraud score number.
- Score trend: the difference between the current score and the previous score.
- Service provider: the name of the fraud data analysis service provider.
- Screening date: the date the claim was screened for fraud detection.
- Indicators contributing to the fraud score: when FRISS is enabled, a list of indicators such as Claim Date Check and Police report, each with its own score and rationale.
- Score history trend: a chart of score history over time by screening date.
- Score history: each score with its screening date, the rationale for the request and the screening requestor.
Generate and regenerate a fraud score on a claim
A fraud score is generated from a claim case record or an adjuster task record. Open one of those records, select the Fraud score tab to view the fraud score page, and then select Regenerate fraud score to generate or regenerate the score. The option is available only on those two record types, so start there when the tab or button seems to be missing.
The score comes from the Financial Services Operations Integration with FRISS. Claims managers, adjusters and processors use that integration to generate and access claim fraud score details. If you expect indicator rows and none appear, confirm that FRISS is enabled for the instance, because the indicator list depends on it.
Read the score trend and score history
The score trend is a short comparison. It shows the difference between the current score and the previous one, so a reviewer sees a rise or a drop before opening any history. The score history trend charts the scores over time by screening date. That is the view to use when you want to see how a claim moved across several screenings.
The score history list gives the detail behind each point. Each entry shows the screening date, the rationale given for the screening request and the requestor. The history also displays how many times the API has run for the claim case. You can filter the history and refresh it on demand, which helps when a claim has been screened more than once and you need to narrow the list.
Where UI Builder fits in the workspace
UI Builder is the tool for this change, and it is where the fraud score page and the other claim page collections are maintained. For background on the tool, read the plain-language guide to UI Builder and workspaces, and for rollout order, the implementation roadmap.
Fraud operations setup around the scores
Fraud score settings sit within a wider Financial Services Operations fraud setup. If your team also runs Intelligent Servicing for Fraud, the configuration tasks in the Australia release run in this order: install the application, assign roles to users, configure service definitions under Fraud Operations > Administration > Service Definitions, configure a playbook in Process Automation Designer, configure CSM Configurable Workspace, edit or create flows in Flow Designer, configure service level agreements under SLA Definitions, configure user groups, and configure assignment rules.
The user group list pairs each group with its roles. Fraud operations analysts and fraud operations investigators receive the sn_bom_fraud.agent role. Fraud operations managers receive sn_bom_fraud.manager and sn_process_optimization_analyst. The assignment rule for the fraud case table, sn_bom_fraud_case, identifies cases that meet set conditions and routes them to agents.
For the wider process around fraud case work, read the guide to submitting a fraud case request to back office agents. For design guidance on UI Builder and workspaces, see the best practices guide. For help planning this work, see ServiceNow implementation.
Checks to run after you change the ranges
- Confirm the minimum and maximum produce the scale you intended, and that each band has a value, color and label.
- Open a claim case in each application that shows the gauge, including Personal Lines Claims and Commercial Lines Claims, and check the new bands.
- Regenerate the score on a test claim, then confirm that the score trend and score history reflect the new screening.
- Ask a user with the adjuster, processor or manager role to open the Fraud score tab on a claim and report whether the labels make sense to them.
- Record the old and new range values in your change log so a later reviewer can trace a shift in gauge labels.
The configuration steps are the same across the Yokohama, Zurich, Australia and Brazil releases. Menu names and screens can still differ on your own instance, so confirm each label before you change live ranges.
Questions about the fraud score gauge
Is the fraud score the same thing as the gauge?
No. The fraud score is the overall number on the page. The gauge is the visual display that places that number inside the bands you configured, with a label for each band.
Can an adjuster change the ranges?
The configuration step lists admin as the required role. Adjusters are listed for generating and viewing the fraud score page. If the configuration options do not appear for your account, ask an administrator to check your role assignments.
Should I regenerate scores after changing the ranges?
Open a claim that already has a score and look at its gauge first. If you want a fresh screening on that claim, select Regenerate fraud score. The new screening then appears in the score history, and the score trend compares it with the previous score.