OBLYTECH Logo
OBLYTECH Logo

Public Government Service Desk Results and Their Definitions

Government service desk results count a different population, clock and resolution rule than an incident SLA does, so they only compare with your own figures once those three are aligned. The Indiana, Miami-Dade and San Diego County figures below each show a different gap to check before comparing.

What a government SLA table counts

Start with the denominator. A percentage on its own says little, and public tables rarely make the underlying count obvious. Indiana’s state IT figures for August 2024 give both halves: 97.32% of incident resolutions fell within SLA, which is 6,906 compliant out of 7,096. That tells you the population was roughly seven thousand incidents in one month for one government operation. It does not tell you the priority mix or the exact timing rules, so the result is a useful operational reading rather than a target you can copy into your own SLA definitions.

Three questions cover most of what a public table leaves out. What population is counted? Which clock starts and stops the timer? Which SLA definition applies when a record carries more than one? Once you ask those, most headline percentages turn into a set of definitions rather than a score.

The same Indiana figures also show why requests need their own line. In that month, requests resolved within SLA reached 84.06%, with 8,751 of 10,411 compliant. A blended figure would land between the two results and describe neither workload. In a ServiceNow instance the same problem typically appears when incidents and service requests feed one resolved-within-SLA figure, and the fix is to separate the two task types at the first step of the calculation. If you are still deciding how each commitment should be defined, the service level management guidance is the place to settle that before any percentage is compared.

Indiana’s Level 1 and survey lines show where first contact breaks down

Two other Indiana lines are more useful as warnings than as benchmarks. The first is labeled “Calls Resolved by Customer Service” and shows 81.77% resolution (1,857 of 2,271) against a 90% target. It looks like a first-contact figure, but it measures resolution at the first support level, and that is not necessarily first-contact resolution. A ticket can sit at Level 1 for part of its life and still close there, and a user can call back after a first conversation. Without the interaction records behind it, the line cannot be treated as a first-contact number.

The second is a user sampling survey in which 97.00% of responses (1,473 of 1,519) fell in the “Meets” to “Outstanding” range. The published counts and the response threshold are worth copying in your own reporting, because they let a reader see how many people sat behind the percentage. The result is still not equivalent to a top-two-box satisfied or very satisfied score, since those response categories are different. Placing the two side by side would overstate what a satisfaction score actually shows.

Miami-Dade and San Diego: first-contact resolution as a target and as a contract definition

Miami-Dade County’s IT service center figures show first-contact resolution at 73% actual for FY2023-24, up from 61% actual for FY2022-23. The county’s FY2025-26 adopted budget also lists 80% as a future value. That 80% is a target, not performance, and the budget does not give the ticket denominator or the detailed first-contact rules. A reader can see the direction of travel, but cannot reproduce the figure in a ServiceNow report.

San Diego County’s case is different because the number sits inside a contract. Its service levels revision, effective September 1, 2024, raised the first-call resolution target from 70% to 73%. The contract definition counts continuous calls and chats, and it includes hot handoffs to other support tiers. Measurement is daily and reporting is monthly. The figure is a contract target, not an observed result, and it is most useful as an example of how a definition can be written.

That definition is the reason the San Diego number and a ServiceNow first-contact figure cannot be set side by side. ServiceNow’s benchmark KPI documentation for the Zurich release measures the share of incidents resolved on first assignment, using a reassignment count of zero. A ticket that passes through a hot handoff in San Diego can count as first-call resolution, yet it could fail the zero-reassignment test. The two measures answer different questions, and a dashboard that labels both as first contact is hiding that difference.

Reading the Australian satisfaction method change

The Australian Department of Parliamentary Services offers the most instructive example in this group, but not for the reason a reader might expect. For 2024–25 its satisfaction measure for ICT service quality came in at 78%, against an 85% target. The measure covered equipment and services, service desk responsiveness, and resolution of issues. The survey drew 387 respondents, and 350 of them indicated ICT use in the previous 12 months.

The useful part is the method change disclosed alongside those statements. Neutral responses had previously counted toward the positive result. The 2025 calculation included only “Satisfied” and “Very Satisfied” responses, so the same responses give a lower positive figure under the newer rule. The performance statements received an unqualified audit conclusion. The lesson for your own reporting is to restate the old and new calculations side by side whenever a method changes, so readers can see how much of any movement is definition.

None of this makes the survey a ticket-level CSAT benchmark. It asks respondents about ICT service quality in general, not how a single closed ticket felt to the person who raised it. The same report ties a separate ICT availability measure to ServiceNow, but that does not make the survey a ServiceNow transactional satisfaction score. Treat it as evidence for measurement design and nothing more.

Using public examples in your own service review

Public results are most useful as a checklist for your own review, not as numbers to measure yourself against. Work through four steps before any figure goes into a steering pack.

  1. Write down the population. Name the record type, the priority mix and the exclusions, and keep incidents apart from service requests.
  2. Fix the clock. Decide whether time is measured in calendar or business hours, and whether resolution means the state change or the closure.
  3. Define first contact from interaction records. If you want a first-contact figure, build it from interaction evidence and an explicit repeat-contact rule, and do not relabel the first-assignment measure to suit it.
  4. Attach the scale to every satisfaction result. Publish the response count, the invitation count, the response rate and the response categories.

Self-service needs its own line. In the Zurich release, ServiceNow’s documented virtual agent call-deflection measure counts incidents and requests submitted through the virtual agent, so the rate can include tickets that were created anyway. Report it beside a count of issues resolved without a ticket. Changes to these definitions belong in your continual improvement management review with a date attached, so that a later movement in the number can be traced to a change in the rule rather than to performance.

If you want an outside review of how these definitions are set up in your own instance, see the ServiceNow ITSM health check.

Frequently asked questions about government service desk results

Can a government SLA percentage serve as my incident SLA target?

Not directly. Indiana’s figure covers one operation for one month, and its priority mix and SLA clocks are not published, so it cannot be matched to your commitments. Set your own targets from your priorities, support hours and contracts, and use public tables to see how results can be laid out.

Is a published first-contact figure the same as ServiceNow’s first-assignment measure?

No. First assignment asks whether a ticket was reassigned, while first-contact resolution asks whether the person was helped in one interaction. Build the two as separately named indicators so the labels cannot drift apart on a dashboard.

Does Miami-Dade’s 73% give me a benchmark I can use?

It is an actual result for FY2023-24, so it carries more weight than a target, but the ticket denominator and first-contact rules are not published. Treat it as one county’s result rather than a figure your team should hit. The 80% value is the county’s goal, not evidence of what is achievable.

What should a satisfaction result be published with?

Show the number of people who answered beside the percentage, and name the response categories that were counted as positive. Without those, a reader cannot judge how many people the result rests on or which answers were counted as positive.

Can a public first-contact figure be reproduced in ServiceNow?

Usually not directly, because public tables rarely publish the ticket denominator or the interaction rules behind the number. The closer match is an internal indicator you define from your own interaction records. Expect it to differ from the public figure even when both are measured carefully.