An Experience Cloud content publishing workflow is the agreed sequence an article moves through on a community site, from first draft to live page, together with the rules that decide who may change, approve, publish and take down each piece of content. Writing these steps down prevents stale announcements, unreviewed posts and articles that nobody owns.
The Experience Cloud content publishing workflow has four stages
A workable model for a community site has four stages: drafting, review, publishing and retirement. Some teams add a translation or legal check between review and publishing, and that is a reasonable addition. The four core stages stay the same, though, because each one answers a separate question: is the content worth writing, is it correct and suitable, is it visible to the right people, and is it still current?
Drafting sets the purpose and the audience
The author records what the article is for, who it is written for and the access level it needs before writing begins. A notice for signed-in members reads differently from a guide that a visitor might find through a search, and the difference affects both the wording and who can see the page. A draft without a stated audience tends to come back from review with the audience question still open, which costs a full review cycle.
Review checks accuracy and fit before anything goes live
The reviewer compares the draft against its source material, confirms that links and dates still work, and checks that the tone suits the community. Where the team is large enough, the person who wrote the article and the person who reviews it should be different people. The review decision records the reviewer’s name and the date, so the approval can be traced later without relying on memory.
Publishing puts reviewed content in front of its audience
Publishing is the step where a reviewed article becomes visible. Decide in advance whether the article goes live straight away or on a set date, and record which publisher made the change. After it goes live, the publisher opens the page as a guest and as a signed-in member of the audience the article was written for, because access problems rarely show up in an editing preview.
Retirement removes or replaces content that has expired
Articles reach a point at which they stop being correct. Retirement is the stage that handles that point, and it needs a written trigger rather than a vague expectation that someone will remember. Common triggers include a change to the product or process an article describes, a policy change, a dated announcement whose date has passed, and a replacement article going live.
Assigning roles and decision rights before content moves
Roles decide who can move content from one stage to the next. Write them down before the first article is drafted, because roles defined after a problem tend to fit that problem rather than the process as a whole. Keep the list short enough that people can recall it without checking. A common set is an author, a reviewer, a publisher and a content owner for each subject area.
The content owner decides whether an article should exist and whether it should still be live. That role should be able to unpublish outdated content, either directly or by instructing a publisher to act. Writing this down prevents two common problems: an article removed by someone who was not responsible for the subject, and an expired notice that nobody feels able to take down.
Service design work often defines the same kind of handoff across support teams, and the thinking carries over. Read the service workflow design notes for how a handoff can be written as a named receiver and a release condition. For help planning this work, see Salesforce implementation.
Setting review criteria that each draft must pass
A checklist gives reviewers the same questions each time, and consistency matters more than the length of the list. Use the points below as a starting set and adjust the wording to suit the community.
- The article names its audience and access level in the opening paragraph or in its record.
- Each factual claim traces to a source the reviewer can name inside the organization.
- Links point to pages that exist and that the intended audience is allowed to open.
- Dates, version numbers and names are correct on the day of review.
- The article contains no personal details about members, staff or customers.
- The title tells a member whether the article is relevant before they open it.
Reviewers who find a failing point should return the draft with the reason written against that point, not with a general comment. That habit shortens the second review because the author knows exactly what to change. Comments left on published articles are a separate matter and follow their own routine, described in the community manager moderation routine.
Controlling who can see each article before and after publishing
Access problems are a frequent reason an article passes review and then fails in use. Confirm the audience setting before publishing, and record which sign-in route the audience uses to reach the site. The login options for Experience Cloud sites page covers the sign-in choices members have. A member who cannot sign in the expected way will not reach a protected article, whatever its audience setting says.
After publishing, the publisher opens the article in two states: as a guest, and as a member who should be able to see it. If a member cannot reach an article that the reviewer approved for that audience, treat it as a publishing defect. Pull the article back to draft, correct the audience, and publish again after a second check.
Recording each publishing decision
The record should hold the article title, the author, the reviewer, the publisher, the publishing date and the intended audience. A short log like this answers later questions without a search through email threads. Staff who inherit a community often find the record more informative than any written policy, because it shows what was actually decided and by whom.
Unpublishing and updating content that has gone out of date
Unpublishing is a decision rather than a tidy-up task. Before removing an article, the content owner confirms that it is out of date, checks whether a replacement already exists, and chooses one of three outcomes: update the article, archive it or remove it. Archiving keeps the history available to staff without leaving the article in front of members, which suits articles that answered a question at one time but still hold reference value.
Deciding between updating, archiving and removing
Update an article when its subject still matters and its facts have changed. Archive it when it describes a period, release or decision that has ended and staff may still need the history. Remove it when the article is wrong, duplicates a newer article or contains information that should not be public. Write the reason beside the decision, so the next reviewer does not reopen the question from the beginning.
Telling members where the replacement is
When members are likely to have read or bookmarked an article, add a short note at the top that says it has been replaced and links to the newer article. A stale page with no pointer generates follow-up questions, and the note takes minutes to add. Check the link after the change. A replacement that is not yet live leaves the reader at a dead end, which is a worse outcome than the stale page it was meant to fix.
Keeping live content current through scheduled checks
Retirement works best as a scheduled task. Set a review date when each article is published, and run a short sweep at a fixed interval to list articles whose review dates have passed. The sweep does not need to read each article in full. It needs to flag articles that describe time-bound facts, such as release details, schedules, deadlines and event information, so a reviewer can check them first.
The sweep also catches articles that depend on a process that has since changed. The Salesforce support and maintenance page addresses the ongoing care that keeps a platform in working order, and the same discipline applies to content: one named owner keeps the list, checks it on a schedule and acts on the results. Changes to how the site is built, as opposed to how content moves through it, belong in a separate change record, and the configuration and customization notes cover that side of the work.
Questions about roles, reviews and unpublishing
How many review rounds should an article need?
A second round is usually enough. If a third round is needed, the purpose or audience was probably unclear at drafting, so fix the brief before editing the text again.
Can one person draft, review and publish the same article?
Small teams sometimes have no choice. In that case, the publishing record should show that one person handled all three steps, and a second person should read a sample of those records each quarter.
Should a scheduled article be reviewed on the day it goes live?
Review it close to the publishing date, because facts can change between approval and release. Then recheck the date and links on the day itself, and note the recheck in the record.
What happens to replies on an archived article?
If the site lets you close replies on an archived article, do so, so that members are not invited to reply on content that nobody maintains. Post a short closing note that points to the replacement or to the reason for archiving, and record the decision with the article.
Who keeps the publishing records up to date?
The publisher writes each entry at the moment of publishing, because a record written later is often incomplete. The content owner then reviews a sample of entries at the end of each quarter and asks for corrections wherever the record and the article disagree.