OBLYTECH Logo
OBLYTECH Logo

Data Loader Run Log Standard for Migration Teams

A data loader run log standard for migration teams is a fixed record kept for each data load in a migration. It captures the source file, the operation, the user who started the job, the record counts and the outcome, so a reviewer can trace what each load attempted and when it ran.

Why migration teams need a written run log standard

Migration work repeats the same loads. One object may be loaded several times across rehearsal cycles, a cutover window and a clean-up pass after go-live. Without a shared format, each person records results differently, and the team often cannot answer basic questions later: which file went in, who started the run, and whether the counts matched the source data.

A standard settles the format once. It does not dictate which loader or interface you use. It defines what gets written down, where the record lives and who signs it off. The gap is widest when a load passes from one engineer to another partway through a cycle, because the handover tends to depend on notes that a single person understood.

Fields to record for each load

Agree on these fields before the first rehearsal. Use the same names for each object so a reviewer can sort or filter the log without translating it.

  • Run ID: a unique reference built from the object name, a date and a sequence number.
  • Object and operation: the Salesforce object and the action performed, such as insert, update, upsert or delete.
  • Source file: the file name, a version label and the row count taken before the load starts.
  • Operator and approver: the person who started the run and, if your process has one, the person who approved it.
  • Environment: the org or sandbox that received the load.
  • Start and end times: recorded in one time zone, with that zone written in the header.
  • Submitted, succeeded and failed counts: three separate numbers, not one total.
  • Error output location: where the rejected rows were saved for review.
  • Disposition: the decision taken on the run, such as accepted, rerun or corrected by a follow-up load.

Keep the list short enough that operators can complete it during the run.

Setting up the log before the first load

Create the log in a shared location that both the migration team and the reviewers can reach. Lock the header fields so each entry has the same structure. Decide before the first load who may edit a closed entry, because that decision shapes the audit trail as much as any column does.

  1. Name the log after the migration plan rather than the tool, so the record survives a change of loader.
  2. Publish the run ID pattern to everyone who starts loads.
  3. Write down the sign-off step for each object, including who can approve a rerun.
  4. Set one retention location for the log and the error files that come with each run.
  5. Run a rehearsal with a small file and check that the log can answer the basic questions before the real cycle begins.

Who can start a load depends on the permissions each user holds in Salesforce. Compare those grants with the operator list in the sign-off step, so the people able to run a load match the people you named. The design of those grants is covered in permission set design for small teams.

Log retention rules, access rules and file formats can differ by organization policy. Confirm the fields and file formats on your own setup before you build the template.

For help planning this work, see Salesforce implementation.

Recording each run as it happens

Write the entry while the load runs, not afterward from memory. Open the entry before the job is submitted and fill in the operator, the source file and the environment. Complete the counts and the end time when the job finishes. An entry started after the fact usually misses the file version, which is the first detail a reviewer asks for.

Leave the source file unchanged once a run starts. If someone edits the file mid-cycle, record the new version as a separate run with its own run ID. A changed file under an old run ID makes reconciliation hard, because the counts no longer describe the data sitting in the file.

Handling failed rows

Failed rows need their own handling. Save the error output from each run, link it to the run ID and record how each group of failures was resolved. Group the failures by cause inside the entry, for example bad lookup values, missing required values or rule rejections. A line that says some rows failed tells a reviewer nothing about whether the problem sits in the source data or in the mapping.

If the org blocks records as duplicates during a load, record those rejections as their own group and route the decision through the duplicate review process. The steps for that review are covered in the data steward duplicate review routine.

Reviewing and closing a run

A run closes when someone other than the operator has checked its counts against the source. The arithmetic is simple. Submitted records should equal succeeded records plus failed records. When they do not, the entry stays open until the gap is explained in writing.

The reviewer works through this list before closing an entry:

  1. Submitted equals succeeded plus failed.
  2. The source file version matches the version named in the header.
  3. Each failed row has a disposition recorded against it.
  4. Any corrective load names the run ID it corrects.
  5. The reviewer’s name and the review date appear on the entry.

A closed entry stays as it was written. Any later correction goes into a new entry that points back to the original run ID.

Handling a rerun without losing the trail

A rerun is a new run, even when it uses the same object and the same operator. Treat it that way in the log, and the history of the first attempt stays readable.

  1. Record the disposition of the original run as rerun, with the reason.
  2. Open a new entry with a new run ID, and name the original run ID in the header.
  3. Register the corrected source file as a new version, and record its row count before the job starts.
  4. Close the rerun through the same review steps as the first attempt.

Assigning ownership and review cadence

One named person should own the log for each migration phase. That owner does not need to run each load. Their job is to check that entries open on time, that reviewers close them, and that open entries are raised before the next run on the same object begins. Without an owner, open entries tend to pile up unnoticed until a reconciliation fails.

Set a review cadence that matches the load schedule. A daily review suits an active cutover window. During rehearsal cycles, a review at the end of each batch is often enough. Record the cadence in the log header so anyone who joins the team later can see what was expected.

Ownership also covers data quality issues that surface in the log. When a pattern of failures points at source data rather than the load itself, the fix belongs in the cleansing work, not in a rerun. The approach for that work is described in data quality work for Salesforce migrations, and the run log is usually where the pattern shows up first.

Keeping the log usable after cutover

After cutover, the log becomes the evidence base for reconciliation and for questions raised months later. Index it by object and by migration phase, so a reviewer can find the load that populated a given set of records without reading all entries. Put the run IDs in the migration status report too, so the two documents point at each other.

Keep the log tied to the plan that sets the load order. The run log shows what happened, and the plan shows what was supposed to happen. When the team that runs loads changes partway through the project, the log becomes the handover document. For how a dedicated team is organized to carry that work, see dedicated Salesforce delivery teams.

Questions about building and keeping a load run log

How much detail does a run log need for a small object?

Keep the same fields you use for large objects. A small object has fewer rows, so its failure groups will be shorter and the entry will take less time to complete. Changing the field set for small loads makes runs harder to compare across the migration.

Should the operator’s name appear when a scheduled job starts the load?

Yes. Name the person who set up or approved the schedule in the operator field, and note that the run was triggered automatically. Reviewers need to know who is accountable for the job even when no one was watching it start.

How should a load that stops partway through be recorded?

Keep the entry, mark the disposition as stopped, and record the counts as they stood when the job ended. Before anyone restarts the remaining records, check which of them were already written. The restart then goes into a new entry with a new run ID, as described in the rerun steps above.

How long should teams keep run logs after a migration closes?

Set the retention period with the owners of the migrated data and with any internal policy that applies to your organization. Keep the log at least as long as anyone might need to reconcile the records it describes. Write the chosen period into the log header so the decision is visible.

Does the log have to live in a spreadsheet?

No. A spreadsheet, a table in a document tool or one ticket per run can all work, provided each holds the same fields and follows the same closing rules.