OBLYTECH Logo
OBLYTECH Logo

Field Service Dispatch Records Linked to Service Cases

A dispatch record and the service case it came from should show a shared status without both records owning the same field. Settle three things before go-live: which record drives the case status, which role may change it, and what happens to the case when a dispatch is canceled. Written rules help prevent the conflicts that tend to appear after launch.

Decide which record owns each status value

Start with two lists: each status the dispatch can carry and each status the case can carry. Some pairs will look obvious, such as a completed dispatch and a case waiting on the customer’s sign-off. Others will not. A dispatch in a scheduled state does not mean the case is in progress in the same sense, because the case may still be waiting on a parts decision or a call back to the customer.

Write each pairing as one line in your design notes. Give the dispatch status, the case status it corresponds to, and the record that wins when the two disagree. Keep the list short. If a status describes something inside the visit, such as a travel stage, leave it on the dispatch and do not copy it onto the case. Copying detail upward creates a second place to keep current, and stale values usually come from there.

Map the handoff from case to dispatch

A dispatch normally starts when the case reaches the point where a visit is the next step. Agree on that trigger before anyone builds it. A vague trigger, such as “when the team thinks a visit is needed,” produces dispatches that nobody can explain a week later. Name the case status or case reason that justifies a visit, and make that the single route into dispatch creation.

The dispatch should carry what the technician needs to act and nothing more. A workable set is:

  • The reason for the visit, written in the case’s own words
  • The site or asset the visit concerns
  • The window the customer asked for
  • A link back to the originating case

Keep the link back to the case one-way for status purposes. The dispatch may reference the case, and the technician should be able to open it from the visit, but the fields that set the case status should come from one named place. Two-way editing is where ownership disputes often begin, because each side assumes the other side holds the change.

Set who may change the shared status

Permissions shape the process as much as the status values do. For each change, write down which role is allowed to make it. A dispatch coordinator will typically move a dispatch from scheduled to dispatched. A technician records arrival and completion on the visit. The person who closes the case should be the one who owns the customer outcome, which is often a service lead rather than the technician who attended.

Check the access each role receives on your own instance and release, rather than trusting the role names on a planning sheet. Access comes from the permission design, and it is easy to grant more than the process intended when a small team reuses the same grants across several jobs. To keep those grants readable, see how to keep permission sets simple for a small team.

Record the answer for each of these decisions:

  • Who may create a dispatch from a case
  • Who may move a dispatch between states
  • Who may set the case to closed
  • Who may cancel a dispatch, and who may reopen the case afterward

If the answer for any line is “anyone on the service team,” the rule is not doing its job, and the conflicting updates you are trying to prevent will return.

Define what a canceled dispatch does to the case

Cancellation is where shared status usually breaks, because it is entered quickly and under pressure. A canceled dispatch does not mean the job is finished. The customer still has a problem, and the case still needs an owner. Before release, choose one of three outcomes for each cancellation reason and record the choice:

  • The case returns to the working status it had before the visit was created, so the queue sees it again.
  • The case moves to a holding status that names the reason, such as waiting on a new visit date.
  • The case closes, provided the cancellation reason shows the problem was solved without a visit.

The third option needs a guard. A cancellation that closes a case should require a reason and a short note, so the closed case explains why no visit took place. Without that note, a closed case reads like a completed job in reports, and the visit numbers look better than the work done. A rule that blocks closure while a dispatch is still open is worth considering too, but test it before it goes live. For design considerations, see validation rules that do not break integrations.

Record the cancellation reason as a choice from a fixed list, not as free text alone. Free text helps the person on the customer call, but reports need a value they can count. The service lead should set the list, so that whoever cancels a visit picks from it rather than inventing a new reason on the spot.

Keep the case note in step with the dispatch

Each status change on the dispatch should leave a short trace on the case. A line such as “Visit canceled by customer, reschedule requested for Tuesday morning” is enough. Copying the full dispatch notes onto the case invites contradictions.

Write the trace in the same order each time: what changed, who changed it, and what the next step is. A consistent order lets a reader scan a long case quickly. When a technician records an outcome, the case note should say whether the job is complete, partly complete or needs a second visit. Those three outcomes map to different case statuses, so write the mapping into the design notes rather than leaving the reader to guess.

Check the shared status after each change

Before the process goes live, run these checks after each kind of change.

  1. Confirm the case status matches the dispatch status for each pairing in your design notes.
  2. Confirm the case note names the change, the person who made it and the next step.
  3. Confirm the role that made the change appears on your permission list for that action.
  4. Confirm a canceled dispatch leaves the case in one of your agreed outcomes.
  5. Confirm a reopened case gets a new closure entry rather than an overwritten one.

Run the list again after any change to statuses, roles or automation. A status added for one team can quietly break a pairing another team depends on, and the first sign is often a report that stops adding up.

Test the cancellation path before release

Cancellation touches more records than the normal path, so test it with the same care you give to creating a dispatch. Build a short set of test cases. Include a dispatch canceled before the technician leaves, a dispatch canceled after arrival, a dispatch canceled and then rebooked, and a case with two dispatches where one is canceled and the other completes. After each test, read the case status and the case note, not only the dispatch.

Run the tests as each role that will use the process. A test that passes for an administrator can still fail for a dispatcher who lacks one grant, and that failure would otherwise show up on a live job. Prepare the test data before the test window opens, and check that it includes the dispatch records you plan to test. The planning notes are in sandbox refresh planning.

If the cancellation logic touches many cases at once, for example when a site closure cancels a run of visits, review the batch size as part of the design. The notes on processing limits for administrators are in processing limits for admins.

For help planning this work, see Salesforce implementation.

Questions about canceled visits and reopened cases

Can a case have more than one dispatch open at the same time?

Yes, a case can need more than one visit, for example a diagnostic visit followed by a repair visit. Decide whether the case status follows the latest dispatch or waits until all open dispatches are finished. Following the latest dispatch is simpler to run, but it hides a second visit that is still pending, so write the rule into the design notes before anyone builds the status logic.

Who should hear first when a customer cancels a visit?

The owner of the case should see the cancellation first, because that person holds the customer conversation. Route the notice to the queue or user who owns the case, not to the dispatcher who booked the visit, since the dispatcher often has no further part in the outcome. Keep the notice short and include the cancellation reason, so the owner can decide the next step without opening the dispatch.

Should a reopened case keep its first closure date?

Keep the first closure in a separate field or history entry, and let the current closure date reflect the latest close. If both dates sit in one field, time-to-close figures mix two pieces of work and stop meaning what the team thinks they mean. If reports need the first closure, decide that when the fields are designed rather than after the reports are built.

What should happen when a technician finishes a visit but the dispatch still shows as scheduled?

Treat the dispatch as out of date until someone corrects it. The process rule is that the technician records the visit outcome on the dispatch first, and the case status changes after that. Do not let the case move ahead of the dispatch, because the case would then describe work the dispatch record cannot support when someone checks it later.