OBLYTECH Logo
OBLYTECH Logo

Screen Flows on Experience Cloud Pages: Placement and Guest User Limits

Screen Flows can be placed on Experience Cloud pages, and the right spot depends on whether the flow needs a record to run. Record-dependent flows suit record pages, and flows that need no record can sit on other Experience Builder pages. Whether a flow can serve as a global action is the placement question most likely to need a sandbox test before the design is locked, and guest users need narrow permissions whatever placement you choose.

Where Screen Flows fit on Experience Cloud pages

Before you build, decide which kind of page the flow needs to live on. The placement rule depends on whether the flow needs a record to run.

  • Record-contextual flows belong on Experience Cloud record pages, where the flow receives the record it works on.
  • Global flows do not need a record and can be placed on other Lightning or Experience Builder pages.
  • Form-style screens are a common reason teams reach for a Screen Flow, because the questions, their order and any branching live in one builder that a non-developer can read.

When a team cannot decide between a record page and a global page, ask whether the first screen needs a record to show anything. If it does, build a record-contextual flow and place it on the record page. If the screen collects fresh input, a global flow is the simpler choice, because it avoids a record dependency the guest never needed.

The table below sets the three placements side by side, with the check each one needs before you build.

Placement Needs a record to run? Confirm before you build
Experience Cloud record page Yes The record reaches the flow as expected in a guest test.
Other Experience Builder page No The page template and guest access work on a sandbox copy of the site.
Global action in the header Depends on the flow The flow works as a global action on a sandbox. If it does not, plan an Aura wrapper during scoping.

Check the site template before you plan the layout, because the page structure you build around a flow depends on the template you chose. Confirm the placement on a sandbox copy of the site first. A flow that renders correctly in the builder can still behave differently for a logged-in user than for a guest, so the builder preview does not settle the question on its own.

Global action placement needs a sandbox test before you design around it

A global action is a button or quick action that opens from the global header, not from a specific page. Moving a flow to that location late in a project is costly, so test it early. Build a minimal version of the flow, add it as a global action on a sandbox, and check that the screen opens and completes the way the design assumes.

If the test shows that the flow cannot serve the header action directly, a common fallback is to wrap the flow in an Aura component and expose that component where the global action needs it. In practice this is extra build work, not a configuration toggle. Plan for the wrapper during scoping, because the navigation, the component packaging and the permission model all change once a wrapper is involved.

Scope this early. Ask whether the action must appear from the header on every page, or whether a link on the page where the user already works covers the same task. A page-level placement avoids the wrapper work entirely.

Guest user limits to plan for

Guest users are the part of the design that most often needs a second review. Running a flow in System Context gives it access that ordinary permissions do not, so treat each use as an exception that needs a reason. Where you can, keep guest flows on ordinary permissions.

  • Use System Context for guest users only where the operation cannot work with the access a guest normally has.
  • Give the guest only the fields the flow reads or writes. Permission sets with limited field access keep that grant visible to a reviewer.
  • Grant guest profiles access only to the flows they need. Each flow a guest can run is one more path into your data, so keep the list short and review it whenever flows change.
  • In a Get Records element, select only the fields the screen needs. Assume that any record data the page loads can be read by a guest using browser developer tools, so a field you did not need is a field you have exposed.
  • Where an operation needs elevated access, keep it in a separate subflow so the surrounding screens stay at guest level. Confirm on a sandbox that the subflow runs with the access you expect before you rely on it.

A guest on an unauthenticated community is where System Context can look like the quickest way through a step that ordinary permissions cannot support. Use it when it is necessary, keep the scope of each use small, and record why it is there. For help planning this work, see Salesforce implementation.

Checks to run before a flow goes live on a guest-facing page

Use this sequence on a sandbox before you publish the page. Each step catches a different kind of failure, and the earlier checks are cheaper to fix.

  1. Confirm the page type. Record-contextual flows go on record pages, global flows go on other Experience Builder pages, and any flow meant for a global action passes the sandbox test first, with an Aura wrapper if the test calls for one.
  2. Log in as a guest user with the profile the site will use, and run the flow from start to finish. A flow that works for an internal admin can fail for a guest on a field they cannot see.
  3. Open the browser developer tools while the flow runs and check which record fields appear in the responses. Remove any field the screen does not display.
  4. List every flow assigned to the guest profile and remove any that a guest no longer needs.
  5. Test the sign-in path. A guest who later logs in should see the same screens without a permission gap. The login behavior is covered in Experience Cloud login options.

Repeat the check after each release. A change to a flow, a profile or a site template can move a field from visible to hidden, and the guest test is usually the quickest way to catch it.

Keeping a Screen Flow page maintainable after launch

A flow on a community page is not a one-off build. Someone has to review it when the site changes, when a moderator asks for a new screen, or when a platform update alters how a flow element behaves. Put the flow on the same review calendar as the rest of the community.

The moderation routine is the natural place to check guest access. A monthly pass that reviews flow assignments, guest profile grants and the fields returned in developer tools keeps the design from drifting. The steps are set out in the Experience Cloud community manager moderation routine, which you can adapt to include flow checks.

Keep the automation logic in one place. If a flow passes data to a second flow, record the handoff and the fields it carries, so a later edit does not expose a field that the guest was never meant to see. The broader design of these handoffs is covered in Salesforce automation workflows, and the way configuration changes are tracked is covered in Salesforce configuration and customization.

Questions about Screen Flows on Experience Cloud pages

Can a Screen Flow go on a record page in Experience Cloud?

Yes, when the flow needs the record it runs against. The record context passes into the flow, so the screens can show that record’s details. A flow with no record dependency belongs on another Experience Builder page, because a record page adds a dependency the guest never needed.

What should I do if a flow will not work as a global action?

Confirm the limit on a sandbox first, since that test settles it for your release. If the flow cannot be placed directly, the common workaround is an Aura wrapper around the flow, exposed as the component the global action uses. Plan for that wrapper in scoping rather than during testing.

Should guest users run flows in System Context?

Only when the operation cannot work any other way. Keep the parent flow at guest level, move the elevated operation into a subflow, and test that subflow on a sandbox. Document why the System Context use exists so a later reviewer does not have to reconstruct the reason.