A Salesforce design can look complete on a whiteboard and still fail once real users, data volumes and integrations arrive. Testing it against Well-Architected review questions before the build means walking each question against the written design and logging each point where the design cannot answer it. Those gaps become the work to finish before the build.
Why a design needs a structured test before the build
Many design problems in Salesforce are cheap to fix on paper and expensive to fix after release. A data model that splits one customer across three objects, or an approval path that depends on a field no one can fill in, shows up quickly when someone reads it against a checklist. Open-ended questions tend to get optimistic answers. A structured review forces each answer to point at a specific part of the design, and that is what makes the gaps visible.
Set up the review around one written design
The review needs a single document to test. Before the first session, write the proposed design on a few pages. Cover the business process it supports, the objects and fields it uses, the automation that runs on them, the integrations that read or write the data, the users who touch it, and the reports that depend on it. If a piece is still undecided, write that down as undecided. Blank sections still give you input, because the blanks become the first findings.
Keep the group small. Two or three people who can speak for the business process, the data and the integrations will get further than a long meeting with the whole project team. Assign each question to one named person who writes the answer in their own words and points to the section of the design it describes.
Decide the scope of each question in advance
Some questions apply to the whole org and others apply to one feature or one release. Mark each question with its scope before the session starts. Otherwise the group spends twenty minutes deciding whether a reporting question applies to a pilot team that has no reports yet.
Walk the five areas with the design open
The Well-Architected guidance for Salesforce groups its ideas under five areas: Trust, Reliability, Operational Excellence, Resource and Cost Optimization, and Fairness. Use those areas as the frame for the review. Take them one at a time, and do not skip an area because the design looks simple. Simple designs often fail in the areas nobody thought to ask about.
Trust: who can see and change each piece
Start with access. For each object and field the design touches, list which user groups can read it, which can create or edit it, and which can delete it. Check that those grants come from permission sets built around a job function, not from a profile someone copied from a colleague. A design whose access rules cannot be put into a short table is usually not ready for review.
Ask how changes are recorded and approved. Who signs off a change to a validation rule or a flow, where that sign-off is kept, and whether a reviewer can tell from the record who changed a field and when. If the answer is a shared login or a spreadsheet that nobody updates, log it as a gap. If your team is working out how to group those grants, see permission set design for small teams.
Reliability: what happens when a step fails
Reliability questions are about failure paths. Pick three key transactions in the design and trace each one from start to finish. For each, ask what happens if an input is missing, an outside call times out, or a user saves the same record twice. Write the expected outcome beside each case. Where no outcome can be written, the team has found a decision to make before the build.
Ask how the design is tested. Name the environment where each change is proven before production, and the data that environment holds. A sandbox with stale data hides the failures the review is trying to find. Check the refresh schedule against the test cycle, and note which scenarios need data the sandbox will not contain. For the planning side of this, see sandbox refresh planning.
Operational Excellence: how the design is run and watched
Operational questions ask who runs the design after go-live. Write down the owner of each automation, the monitoring the team will use to spot errors, and the routine for reviewing failures. Ask how a support person would learn that an integration has stopped sending data. If the answer is that a user will report it, the design lacks monitoring, and that goes in the gap record.
Look at change management too. How often are releases planned, who approves them, and how are urgent fixes logged afterwards? A design that depends on one administrator to make each change carries operational risk, however well the functional design is built.
Resource and Cost Optimization: what the design will consume
Look at volume before you look at features. For each automation, list the objects it reads and writes, how many records a normal day or month will generate, and what happens at the peak the business expects. Then check the platform limits the design depends on, along with the figures that apply to your edition and release, before you rely on them. Record each figure next to the design element it constrains. A process that handles a bulk load one record at a time may look fine in a demo and fail in production. For more on how those limits shape admin design choices, see governor limits for admins.
Fairness: how the design treats different users and records
Fairness asks whether each group of users gets a fair route through the process. Check whether people who rely on assistive technology can complete the steps, and whether the language the process uses matches the language the people in it speak. Where a score, routing rule or approval depends on a field, write down what the field means, who maintains it and who checks it. A decision that nobody can explain is hard to defend later, so record the reasoning behind each automated decision in the design.
Record the answers the design cannot support yet
A review that finds no gaps has probably asked the wrong questions. Log each finding in the same format so the group can sort and assign them later. Each entry should contain:
- The question, quoted as the review states it
- The part of the design that should answer it
- What the design says today, or that it says nothing
- The person who owns the decision that would close the gap
- Whether the gap blocks the build or can wait for a later release
Keep the wording plain. Say the design cannot answer the question because a decision is open or the data is not yet available. “Needs work” tells no one what to do. Gaps that block the build go to the decision owner before any component is created. Gaps that can wait get a date for the next review. Each open item should close either with a changed design or with a named decision. For help planning this work, see Salesforce implementation.
Turn the gaps into design changes and a retest
After the session, update the design document rather than the meeting notes. Each change gets a version note and a reference to the gap it closes. Then retest the questions the change touches. A full second review is rarely needed, but each change still needs a check against the areas it affects.
Validation is where many designs break quietly. A new rule that looks harmless to the business can block a record an integration writes overnight. Before the design passes, list each validation rule it adds, and for each one name the integration and the user path it could affect. For the detail on keeping those rules from disrupting integration traffic, see validation rules that do not break integrations.
Once the gaps are closed, record the review result on the design itself: the date, the participants, the open items that remained, and the decision that accepted each one. That record is what the team reads when the design changes later. Without it, the review is forgotten once the build starts.
Questions about using this review before a build starts
Can one administrator run the whole review?
One person can walk the checklist, but the answers will be thinner. Questions about access, failure paths and volume usually need the owner of the process and the owner of the data. If one person covers both roles, have them answer in writing and ask a second person to read the answers before the session closes.
Should the review come before or after requirements sign-off?
Run it after the requirements are written and before the build is estimated. Requirements describe what the business wants, and the review tests whether the proposed design can deliver it without disturbing anything else. Running the review earlier means testing a design that has not been described yet. Running it after the build starts makes each finding more expensive to fix.
What if the design relies on a feature the team has not used before?
Mark that feature as untested in the gap record. Then build a small proof in a sandbox and log the result against the question it answers. A general description of a feature is not a substitute for a test in your own edition and release, because behavior depends on configuration and on the release in use.
Does the review replace testing?
No. The review tests the design on paper. It surfaces missing decisions, unclear access and failure paths that nobody traced. Test cases still prove that the built configuration behaves as the design describes. The two cover different ground, and the review should come first so the test cases are written against the decisions it closed.