OBLYTECH Logo
OBLYTECH Logo

SAP Solutions Architecture

Introduction to SAP Solutions Architecture

An SAP landscape grows one decision at a time, and the architecture is the record of those decisions: which systems run where, how they connect, and how they are secured and recovered. At Oblytech, we set that record out before a migration or new build starts, so the project team begins from a design.

The phases below run from strategy and hosting choices through migration, security and integration to ongoing evolution.

Why Choose Oblytech for SAP Solutions Architecture?

Our SAP Technical Services

Phase 1: SAP Architecture Strategy & Planning

Enterprise Architecture Assessment

  • Analyze existing SAP and non-SAP landscapes to identify areas for improvement.
  • Define a comprehensive SAP architecture roadmap aligned with business strategy.
  • Establish SAP best practices for security, scalability, and compliance.

SAP System Landscape Design

  • Develop an optimized SAP system landscape with high availability and redundancy.
  • Design cloud, on-premise, or hybrid architectures for scalable deployment.
  • Ensure reliable data flow, API connectivity, and security protocols.
Phase 2: SAP Implementation & Migration Architecture

SAP S/4HANA Architecture & Migration

  • Plan and execute SAP ECC to S/4HANA migrations with minimal disruption.
  • Optimize database performance with SAP HANA in-memory processing.
  • Enable a modular, flexible architecture for future enhancements.

Cloud & Hybrid SAP Deployments

  • Design SAP on AWS, Azure, and Google Cloud architectures.
  • Establish hybrid SAP deployments with multi-cloud and on-premise integration.
  • Implement containerized SAP solutions for better resource management.
Phase 3: SAP Security, Compliance, & Performance Optimization

Security & Compliance Frameworks

  • Implement role-based access control (RBAC) and identity management.
  • Ensure compliance with GDPR, HIPAA, and industry-specific regulations.
  • Deploy data encryption, cybersecurity frameworks, and threat monitoring.

SAP Performance & Optimization Strategies

  • Optimize SAP HANA, NetWeaver, and other key components.
  • Conduct system audits, performance monitoring, and load balancing.
  • Implement SAP Fiori UX optimization for better user experience.
Phase 4: SAP Integration & Data Management

Enterprise Integration & API Management

  • Establish reliable integrations between SAP and non-SAP applications.
  • Utilize SAP Process Orchestration (SAP PO) and Cloud Platform Integration (CPI).
  • Develop custom APIs and middleware for cross-platform connectivity.

Data Governance & Master Data Management (MDM)

  • Implement SAP Master Data Governance (MDG) for data consistency.
  • Enable real-time data synchronization and reporting across SAP modules.
  • Design data retention and archival strategies for optimized storage.
Phase 5: SAP Continuous Improvement & Innovation

Advanced SAP Innovations

  • Integrate AI, machine learning, IoT, and blockchain with SAP.
  • Enable predictive analytics and automation for operational efficiency.
  • Develop custom extensions using SAP Business Technology Platform (BTP).

Ongoing Support & Evolution Strategy

  • Provide continuous monitoring and technical support.
  • Plan for future SAP upgrades and digital transformation.
  • Maintain a scalable SAP architecture roadmap for long-term success.

Which architecture decisions shape everything downstream

An SAP landscape is the set of systems, environments and connections that carry the business’s processes, and the architecture is the set of decisions about how that landscape is arranged. The person who should own these decisions is the enterprise architect or CTO, working with the SAP basis lead and the security owner. The decisions are slow to reverse. Once production runs on a particular hosting model or integration pattern, changing it becomes a project of its own, so the time to settle them is before a migration or new build begins, not during one.

Hosting models compared on the factors that drive the choice

The main choice is where the systems run. The options are on premises, a hosted or managed arrangement, a public cloud deployment, or a hybrid in which some systems stay on site and others move. Each option changes who controls patching, backup, network access and the cost profile. The table lists the questions that tend to decide the matter. It is a decision aid rather than a recommendation, because the answer depends on data residency requirements, existing contracts and the skills in the organization.

FactorLargely on premisesPublic cloudHybrid
Control over infrastructure and change windowsFull, held by internal teamsShared, with responsibilities set by the provider’s modelSplit by system, which must be documented
Data location and residencyEasiest to evidenceNeeds region choice and contractual clarityNeeds a map of which data sits where
Exposure to change in the provider’s servicesLowContinuous, so it needs a monitoring routineMixed, with the same routine applied to the cloud part
Typical reason to choose itStrict control or long-standing investmentElastic capacity and a managed platformA phased move with some systems that must stay put

How resilience and recovery requirements are set

High availability and disaster recovery are often specified as a single phrase in a project brief, and that phrase hides three different requirements. The first is how long the business can tolerate a system being unavailable during working hours. The second is how much recent data the business can afford to lose. The third is how long a full recovery is allowed to take. Each requirement points to a different design: redundancy within a site, replication to a second location, or a documented restore process that has been rehearsed. A recovery plan that has never been exercised is an assumption, so the architecture should include a restore test on a schedule, with the results recorded.

Landscape design also decides how many non-production environments exist and what each one is for. A shared quality environment used by three projects at once produces test conflicts that look like defects. A clear purpose for development, quality and sandbox systems, with a refresh policy for copies of production data, removes much of that friction.

Where integration design should be fixed early

The integration layer is the part of the architecture that most often picks up unplanned complexity. Point-to-point connections multiply quickly, and each carries its own credentials, mappings and monitoring. An architecture decision should state whether integrations pass through a central layer, whether specific high-volume flows use direct connections, and who owns monitoring for each.

Master data is the other half of the integration question. If customers, suppliers and materials are maintained in several systems, the architecture needs a rule for which system is the source for each attribute. Without that rule, every integration turns into a reconciliation exercise.

Security and compliance decisions the architecture must carry

Access design, encryption and audit logging belong in the architecture, not in a later hardening phase. The architecture should say how users authenticate, how roles are structured, how privileged access is granted and recorded, and how the landscape is watched for unusual activity. Data-protection obligations and sector regulation add requirements that vary by country and industry. The architecture should name each requirement and the control that meets it, so an auditor can trace the design back to the obligation without a separate narrative.

How to tell an architecture review from a delivery project

An architecture review produces decisions and a target picture. It does not build anything, and its output is a document a delivery team can execute. Buyers sometimes expect the review to deliver configuration or code and are disappointed. The reverse also happens: a delivery team is asked to make architecture decisions as it goes, and the result is a landscape that reflects the order of the work rather than a considered design. Keeping the two activities separate, with a sign-off between them, is one of the simplest protections available.

The S/4HANA implementation and migration page is the related pointer for migration, and the architecture should be settled before a migration plan is committed.

How long should an architecture review take?

Its length depends on the number of systems, the number of integrations and the availability of the people who know the current landscape.

Should we choose a hosting model before choosing a release?

The two are often best decided together, because the release can limit which hosting options are supported and the hosting model can affect the migration method.

What should an architecture decision record?

The options considered, the requirement each one met or failed, the owner who accepted the trade-off and the date it should be revisited.

Is a hybrid model a compromise?

It can be a sound end state, but it is also a transition state. A hybrid landscape needs more documentation and monitoring than either pure model, and the plan should say which systems move later.

How capacity and growth are planned into the landscape

Sizing is often treated as a hardware question, but it is really a question about how the business will use the system across the period the architecture must cover. Transaction volumes, peak concurrent users, batch runtimes and the growth in retained data all feed the sizing. A useful starting point is the set of peaks the business already experiences: a month-end close, a seasonal sales surge, a payroll run or a year-end inventory count. Each peak should be mapped to the load it creates, and the architecture should show how the landscape absorbs that load without degrading the other workloads running at the same time.

Growth needs an explicit assumption and an owner. An architecture built for today’s data volume and user count will come under strain within a few budget cycles if the business expects to add entities or sales channels. Documenting the growth assumption, and the point at which the landscape would need to change, turns a future surprise into a planned decision. Archiving and data retention policies belong in the same conversation, because they change how fast the database grows and what it costs to keep it responsive.

Next step on a landscape decision

If the target landscape is still open, write down the systems in scope, the recovery requirements you already have and the integrations that cannot change. Bring that list to a technical conversation. Discuss your SAP landscape architecture once that list is written down.

Work with Oblytech on SAP Solutions Architecture

At Oblytech, we design and implement high-performing SAP architectures that drive efficiency, security, and innovation. Whether you’re migrating to SAP S/4HANA, adopting cloud solutions, or enhancing security frameworks, our SAP architects are here to help.

Where SAP process automation fits in the architecture

SAP process automation is a workflow layer that sits on top of systems that already hold the data, so the architecture question is less about which tool to buy and more about which systems a workflow is allowed to call and who owns each step when it fails. Settle those two points before any process is modelled, because they decide whether the automation is still maintainable after its first release.

Typically the workflow engine runs on the SAP Business Technology Platform, while the systems of record stay where they are. Each call from a workflow into an S/4HANA or non-SAP system is an integration with its own credentials, error handling and change control. A workflow that reaches into five systems carries five dependencies, so list them before the first step is built.

The table compares the three places process logic usually ends up. None is right in every case.

PlacementWhere it tends to fitWhat it makes harder later
Workflow on SAP BTPApprovals and cross-system steps that touch several SAP and non-SAP applicationsEach connected system needs its own connection, monitoring and owner
Logic inside the core SAP systemSteps that only touch one module and must run inside its transactionUpgrades and custom code now carry the process logic
Custom middlewareOrganisations that already run a mature integration layerProcess logic is spread across interfaces that few people read

The common failure here is building the workflow first and deciding its placement afterwards. By then the workflow is usually wired into production under an undocumented service account, and moving it becomes a project. A practical order runs as follows:

  • Name the business owner and the technical owner of every step.
  • List every system the workflow reads from or writes to, with the account it uses.
  • Confirm each system can accept the call under least-privilege authorisation.
  • Choose the placement only after the first three answers are on paper.

The point of this order is that the placement follows from the dependencies rather than the other way round. Teams that skip it usually find the dependencies during testing, when each one is more expensive to resolve.

Where a workflow depends on a migration still in flight, the sequencing belongs with S/4HANA migration planning, and the connection work itself is covered by SAP technical services for custom integrations. Once the workflows are live, ongoing SAP support and optimisation keeps the monitoring and the authorisations current.

SAP Software Solutions: Which Product Family Fits Your Landscape

SAP software solutions fall into a few families, and the right one depends on what the business has to run, not on which product name is newest. In most implementations, the core system holds the finance, stock and order records, and the platform layer around it carries the custom apps, approvals and integrations. Decide which system owns the core records first, then choose the products that extend it.

Three questions separate the options in practice:

  • Where do the authoritative finance, stock and order records sit today, and how many other systems keep copies?
  • Does the work need screens, workflows or apps the core system does not provide, and who maintains them after go-live?
  • How many systems must the solution talk to, and does the organisation already run an integration layer?

The table below compares the usual starting points. None of them is right for every business.

NeedTypically fitsMain trade-off
A full ERP core for a large or multi-entity groupSAP S/4HANAA longer programme, with data migration and process design before go-live
A packaged ERP for a mid-sized business with a smaller footprintSAP Business OneHeavy custom structure is harder to carry, so process fit matters more
Approvals and workflows that span SAP and non-SAP systemsSAP Business Technology Platform servicesEach connected system needs its own owner, credentials and monitoring

The common mistake is buying a product family for its feature list before the record ownership is settled. Teams often build reports and workflows against copies of data that nobody is accountable for. A short fit check against the current process map usually answers the question faster than a feature comparison does.

Confirm editions, licensing and supported releases on your own instance and with the vendor, because these change over time. If the real question is whether to stay on an existing release or move, the SAP upgrade services page sets out that path. For the wider range of SAP work, see our SAP solutions overview.

ServiceNow guides on this topic

Guides from the Oblytech ServiceNow library that explain the practice behind this page.

More in this section