OBLYTECH Logo
OBLYTECH Logo

Known Error Database in ServiceNow: What It Is and How It Works

A known error database, usually shortened to KEDB, is the record of problems whose cause is understood and whose workaround is documented, so that the next incident with the same symptoms can be resolved quickly. The ServiceNow documentation describes this practice through problem records and known error articles rather than a feature named KEDB. The idea is spread across problem records, knowledge articles that agents search during an incident, and the links between the two.

KEDB is an ITIL concept that ServiceNow stores as ordinary records

A known error database is a catalog of faults that have been diagnosed, with a workaround recorded even when the permanent fix is still waiting on a change. The reason it exists is practical. Without it, agents who meet an old fault often start diagnosis again, and the engineers who already solved it have no way to see the repeat. For the wider picture of how known errors fit into problem management, see our ServiceNow known error overview.

You do not need a separate store to run this practice. The same facts sit in problem records, change records and knowledge articles. That is why the question of where a known error lives matters more than the name you give the store.

How problem records and knowledge articles share the work

A known error normally starts as a problem. An engineer investigates a recurring incident, finds the cause and records a workaround on the problem record. The record moves through the problem life cycle states. The Problem Management Best Practice — Madrid — State Model plugin is activated by an administrator through the Migration Utility, because it includes features that are not compatible with the previous version of Problem Management. The exact states, fields and approval steps depend on your release and on which plugins are active, so check the problem settings in your own instance before you design a process around them.

The knowledge article is the part the agent sees. Someone writes the symptoms in the words users actually type, gives the workaround as numbered steps and links back to the problem record so engineers know where the article came from. Keep the article as the reader’s view and the problem record as the engineering view. Mixing the two into one long document is a common mistake, because the article tends to go stale as the engineers update their notes.

A change record usually comes into the picture later. It holds the permanent fix once one is scheduled, and it is the signal that tells the owner the known error entry is ready for review.

Creating the known error article from the problem record

Open the problem record and choose Create Known Error Article under Related Links. That link appears when the Primary Known Error article field on the Analysis Information tab is empty, so if you cannot see it, check whether an article is already attached to the problem.

Use Search for Duplicates while you fill in the article form. It matches on short description, category and topic, so write the short description in the words an agent would type. Click Publish when the draft is ready, which sends it for review and approval.

How a KEDB differs from the general knowledge base

A general knowledge base answers how-to questions, such as how to reset an account or request a new laptop. A known error entry is narrower. It describes one fault, the symptoms that point to it, the cause as far as it is understood and the state of the permanent fix. The two get mixed up in search results, and an agent who searches for an error message wants the known error, not the onboarding guide.

Aspect General knowledge article Known error entry
Question it answers How do I complete this task? Why is this failing, and what do I do until it is fixed?
Typical reader End user or agent Service desk agent during an incident
Lifespan Maintained while the process exists Reviewed for retirement once the permanent fix is in production
Linked record Often none The problem record it came from

How agents find a known error while handling an incident

During an incident, agents are more likely to search for guidance than to open the problem module, so the knowledge article is usually the part they see. Titles matter when agents scan results. A title that reads like the symptom, such as “Intermittent timeout on the order sync job”, is easier to recognize than one that carries an internal reference number. Write the title from the alert text, the error message or the user’s description, and include the error code in the body as useful context.

Choose the short description with care, because it is the text the duplicate search matches on. The same fault can be described in different ways by different groups. Pick one wording, note the others in the description and retire the duplicates rather than leaving them to compete. Search problems are often naming problems rather than tool problems.

Communicating a workaround from the problem record sends a notice to each related incident that a workaround is available, so the next person who works one of those tickets can see it. Automating that linking is part of broader workflow automation, and our piece on how ServiceNow supports enterprise workflow automation covers the general approach.

Communicating a workaround to the incidents already open

Enter the workaround in the Analysis information section of the problem record and save the record. Then choose Communicate Workaround under Related Links. The system sends a notice to each related incident that a workaround is available, so the desk does not have to update each open ticket by hand.

The action informs the people working those incidents. It does not create a knowledge article, so the searchable entry still needs its own step.

Who should own each known error entry

Ownership is where many known error efforts quietly fail. Problem managers want the record to show the root cause, service owners want the workaround to be safe, and the service desk wants the article to be short. Agree on one owner for each entry and make that owner responsible for the review date. An entry that nobody reviews after the permanent fix ships becomes a trap, because agents will keep applying a workaround that no longer applies.

Recurring errors that cross system boundaries are the hardest to own. Our page on integration monitoring and error ownership covers error ownership for integrations.

Adoption is the last step. Agents are more likely to use a known error database when they trust it, which means entries get reviewed and stale ones get closed. Treat the rollout as a change to how people work rather than a content project. Our page on AI adoption and change enablement is relevant if the rollout also changes how agents work.

Setting a Valid to date so an entry does not outlive its fix

On the known error article form, the Valid to field sets the date after which the article is deleted from the database, and after that date the article no longer appears in search results. Check the field label and behavior on your own instance before you rely on it.

Set the date when the entry is created, and base it on the change record that carries the permanent fix rather than on a calendar guess.

Known error database questions people ask

Does ServiceNow have a separate KEDB module?

The documentation describes known error articles created from a problem record. Those articles are stored by default in the knowledge base named Known Error, and the problem record carries the workaround. Check your release notes and your own instance, because the available options depend on the version and on which plugins your organization has licensed.

Can a known error exist before the root cause is found?

Usually not in the strict ITIL sense. In ITIL terms a known error is recorded once the cause is identified, and a tested workaround is what makes it usable. Early findings belong on the problem record as investigation notes, and the known error state comes once the workaround is reliable enough to hand to the service desk.

Should every incident with a workaround become a known error entry?

No. A one-off fault that is unlikely to return does not need an entry. Create entries for faults that recur, that cost agents time each time they come back, or that have a safe workaround the desk can apply without involving an engineer.

Who should close a known error entry?

The person responsible for the entry, after confirming that the permanent fix is in production and the workaround no longer applies. Closing it should be a deliberate step with a short note explaining why, not something that happens because the ticket count has gone quiet.