OBLYTECH Logo
OBLYTECH Logo

CTI for ServiceNow Customer Service: Calls Open the Right Record

Computer telephony integration (CTI) links a phone system to ServiceNow so an incoming call can open the caller’s record and an outgoing call can start from a phone number on screen. ServiceNow offers a URL-driven pop-up window and two voice integration approaches, OpenFrame and ICC. Both keep the agent in ServiceNow while the call runs.

How a Call Reaches the Agent Screen

A basic form of CTI is a client on the agent’s computer that sends a request to the instance. The request is a URL sent to the instance, and only authenticated users can use it. ServiceNow answers with a pop-up window. The request can identify the caller by name or by phone number, and either one is enough to start the lookup.

Other parameters shape the result. The table below lists the ones the request can carry.

Parameter What it does
sysparm_caller_name Identifies the caller by name
sysparm_caller_phone Identifies the caller by phone number
sysparm_task_id Points the pop-up at an existing task the caller is asking about
sysparm_view Sets the view used to display the data
sysparm_cti_rule Names a custom function to run instead of the default script
sysparm_<field name> Fills an incident field, so sysparm_priority=1 sets priority to 1

The Default Lookup Order

Under the default CTI Processing script, the lookup runs in a fixed order:

  1. The script tries to identify the user by the caller name.
  2. If no user matches, it tries the phone number.
  3. If a user is found and has open incidents, the pop-up shows the caller’s details and those open incidents.
  4. If a user is found but has no open incidents, the pop-up shows a new incident.
  5. If no user is identified and a task identifier was passed, the default script does nothing.

Step 5 is a gap in the default script. The code that would show an existing task is commented out, so an administrator has to enable or rewrite it before task details can appear in the pop-up. Record inserts, updates and deletes must go through a separate function that is not client callable.

Replacing the Default Script

A request can name a custom function with the sysparm_cti_rule parameter, and that function runs in place of the default CTI Processing script. The rule function must be a script entry with the client-callable checkbox ticked. That checkbox might not appear on the form by default. If the function has to change records, it calls a separate function that is not client callable to do the work.

OpenFrame and the Interaction Controls Component

For a fuller setup that keeps calls inside the workspace, CTI uses OpenFrame together with the Interaction Controls Component (ICC). The two do different jobs, and a team can use either one or both.

OpenFrame is the communication frame agents use to place and receive customer calls. TopFrame is the ServiceNow application that hosts the OpenFrame window. The OpenFrame API is a JavaScript library supplied by the telephony partner. It communicates with TopFrame and controls the window’s visual behavior. Integrations should load the minified build of that library. A non-minified copy exists for API reference only.

ICC provides native ServiceNow voice call controls. It needs the Interaction Controls Component (ICC) plugin installed, and it is switched on by ticking the Enable interaction controls check box on the OpenFrame configuration record, which is reached through All > OpenFrame > Configurations. The controls include hold, transfer, mute and disconnect.

OpenFrame embeds the external provider’s telephony interface in the workspace through an iframe. ICC provides native ServiceNow call controls within the CSM Configurable Workspace. OpenFrame also integrates with the Interaction Management System and interaction records.

When an agent selects a phone number to place a call and the contact has two phone numbers, a dialog lets the agent choose which one to call.

Who Can Use CTI and Which Components Are Involved

Agents need one of four roles to use the OpenFrame window: sn_openframe_user, sn_customerservice_agent, sn_customerservice.consumer_agent, or sn_openframe.admin. They must also belong to a user group named in the OpenFrame configuration.

TopFrame is the ServiceNow application that hosts the OpenFrame window. The Interaction Controls Component (ICC) adds native call controls to the agent workspace. For how access is designed across a customer service deployment, see Customer Service Management security and access design.

Screen Pop, Click-to-Dial and Presence

Customer service CTI covers four day-to-day behaviors.

Behavior What happens
Screen pop An incoming call maximizes the OpenFrame window and shows the caller’s details
Click-to-dial Selecting a phone number field places a call, and a dialog lets the agent choose a number when the contact has more than one
Presence sync The agent’s status, which can be Available, Not Available, Busy or Wrap Up, is recorded in the OpenFrame Agent Presence record
Call controls The agent can put a caller on hold, transfer, mute and disconnect from the workspace

Contact center integrations are built for each provider, such as Amazon Connect and Genesys. For escalation of contact center cases, see the Contact Centre Case Escalation Guide. For the wider integration picture, see Customer Service Management integration patterns.

Connecting Amazon Connect to ServiceNow Voice

The Amazon Connect integration is delivered as ServiceNow Voice with Amazon Connect. It is not supported for AWS GovCloud. Before setup, the AWS account needs administrative access. Create a ServiceNow service account so AWS can reach the instance, and ensure the sn_cti_amzn_cct.admin role is available to the setup user. If the team plans to use AI Voice Agents, an administrator must enable that feature in the instance first.

The setup runs in two parts. In AWS, the team creates an Amazon Connect instance. In ServiceNow, the team creates an instance record under the Amazon Connect integration menu. The record takes a name, the AWS resource name, an active flag, and optional override parameters to edit the domain for the Amazon Connect instance parameters. The instance parameters, such as the CCP host and CCP URL, are generated from the instance name.

The Setup Guide related link on the instance record opens the guided setup. Its stages are listed below in the order the guide presents them.

Stage What it covers
Select Application / Home Choosing the application to configure. For AI Voice Agents, enter the Call Context API URL and Voice Service ID
Setup S3 Bucket A bucket that hosts the content CloudFormation deploys
Deploy Stack Provisioning the AWS resources with CloudFormation templates and stacks. When upgrading from a previous release, point the Lambda function to one of the AWS supported versions
Deploy Lex Bot Deploying the Lex bot for voice conversations
Connect Setup Connecting the ServiceNow instance with AWS services
Import Contact Flows Importing the flows and completing the AWS Lambda and OAuth credential setup
Setup Real Time Transcription Setting up the properties in the Amazon Connect integration to enable real-time transcription
Call Recording Events Enabling call recording in Amazon Connect so recording events reach ServiceNow
Setup Authentication Creating the service account that links Amazon Connect with ServiceNow
Additional Configuration Softphone launch settings, user group restrictions and ICC voice controls

Contact flows include default inbound and outbound flows, which come with the subscription, and Transfer to Agent and Transfer to Queue flows. The transfer flows can be reused for ServiceNow Voice for IT service management. You can use your own hold music, up to five seconds long. Queues route contacts from AWS queues to ServiceNow queues. If a queue already exists with the same ServiceNow Voice External ID, update its Provider Queue ID rather than creating a duplicate.

How the Call Workflows Are Organized

CTI has three sample workflows, and each one starts from a different call event. A fourth area, interaction operations, is a separate section and is not a workflow in its own right.

Workflow Starts when
Outbound An agent places a call from an OpenFrame window
Inbound A call is received in an OpenFrame window
Transfer An inbound call is transferred to an agent

Customer service agents use CTI to make and receive phone calls in ServiceNow applications. For the broader product area, see the ServiceNow CSM hub, and for a plain-language overview, read What Is ServiceNow Customer Service Management?.

Interaction Operations

Interaction operations use the OpenframeInteractionUtility script, which provides a create-or-update method for CTI interactions with OpenFrame and the Interaction Management System. It is a separate section from the three sample workflows.

Does a CSM Telephony or Voice Integration Need Its Own Budget, and What Must Be Confirmed Before Cutover?

Yes. A telephony or voice integration usually needs its own budget line because, as of November 2026, the CSM subscription does not cover the telephone system itself. The phone platform, carrier usage, call recording, transcription and the integration build are separate costs. Before cutover, a buyer should confirm the telephone-system account, its entitlements, and who owns each side of the link.

Where the telephony money goes

Split the budget into three groups so each figure can be checked. The ServiceNow side covers CSM entitlements, the voice and call-control components, and any Integration Hub or Workflow Data Fabric subscriptions that transaction capacity can require as of September 2026. The telephone side covers contact-center licenses, carrier usage, recording and transcription. The build side covers design, mapping, authentication, error handling, testing and cutover support. Existing telephone subscriptions are baseline spend and should stay on their own line.

What drives the build effort

The effort depends on how much of the telephony stack the integration touches. A caller lookup that only opens a record is usually the lighter part of the build. Routing, interaction linkage and recording held together are a large one. The biggest variables are:

  • The number of telephone systems, queues and provider configurations in use
  • Whether the link only looks up caller records or also writes interaction records back
  • Whether hold, transfer and mute controls are needed inside the workspace
  • Whether recordings and transcripts must be attached to cases

Define each integration as a lookup, a synchronization or a transaction before it is scoped. Settle that choice before estimating, since changing it later reshapes the scope.

Usage charges to forecast

Channel usage sits outside the user count. The price depends on the quote’s user and consumption meters, so ask how carrier usage, recording and transcription are metered before forecasting them by queue. Setting a license-only telephone price beside a fully loaded CSM model distorts the decision. Price the whole channel setup instead, so routing, recording, AI, integration, support and admin effort are compared on the same basis.

What to confirm before cutover

Confirm these items in writing before cutover:

  1. The telephone-system account exists, its administrator is named, and the entitled ServiceNow application is installed and configured.
  2. Phone numbers on contact records match the formats the caller lookup expects, tested with real inbound numbers from each carrier.
  3. Each telephone-side queue maps to one ServiceNow queue, with no duplicates left from earlier attempts.
  4. Inbound, outbound, transfer, hold and disconnect have each been run end to end with test agents and test numbers.
  5. Recording and transcription stay off unless notice and consent rules in each state, province or territory allow them, and retention periods are written down.
  6. Agents have a documented workaround if the link drops during a live call.
  7. One named owner covers telephone-side changes, because a carrier or contact-flow change can break the link without touching ServiceNow.
  8. Acceptance criteria for handover are written, and the business owner has signed off the test outcomes.

Frequently Asked Questions

What does CTI do in ServiceNow?

It connects a phone system to ServiceNow so a call can open the matching record and an agent can dial from a phone number on screen.

What happens if a call arrives and no user matches the caller?

The default script tries the caller name and then the phone number. If neither matches and a task identifier is passed, the default script does nothing. Showing the task needs an enabled or rewritten version of the commented-out code, plus a separate function that is not client callable.

Which roles do agents need for OpenFrame?

One of sn_openframe_user, sn_customerservice_agent, sn_customerservice.consumer_agent or sn_openframe.admin, plus membership in a user group named in the OpenFrame configuration.

Can a team replace the default lookup logic?

Yes. A request can name a custom function through the sysparm_cti_rule parameter, and that function runs in place of the default script. Record changes still belong in a separate function that is not client callable.

Does ServiceNow connect to Amazon Connect?

Yes, through ServiceNow Voice with Amazon Connect. It needs an AWS account with administrative access, a ServiceNow service account and the sn_cti_amzn_cct.admin role. It is not supported on AWS GovCloud.

Do agents get hold, transfer and mute controls?

Yes. Those controls are part of ICC, once the ICC plugin is installed and the Enable interaction controls check box is ticked on the OpenFrame configuration record.