To apply a quick task filter in Dispatcher Workspace, open the filter beside the task search field, choose a criterion, operator, and value, then select Filter task panel. Use skill, parts, or SLA criteria to narrow the list. Choose the combined task panel and calendar option when both views should use those conditions.
Apply a quick task filter in Dispatcher Workspace
The role required for this action is wm_dispatcher. Navigate to All > Field Service > Dispatching > Dispatcher Workspace, then select Dispatcher Workspace. Before filtering, decide which dispatching question you need to answer: which tasks need a particular skill, which require particular parts, or which need attention because of an SLA breach.
- Open the filter icon beside the task search field. Alternatively, open the task search field drop-down and select Quick Filters.
- Select the criterion that represents your question, followed by an operator and a value.
- For an additional condition, select + Add Filter. Choose AND or OR to combine your conditions.
- Select Filter task panel to apply the conditions to the list.
- Inspect the remaining tasks against the question you started with.
Nonmatching tasks disappear from the task panel list until the filter is cleared. Treat the shortened list as a selected view of work. A task disappearing from this list does not mean that its work has been completed. Before handing over a dispatching queue, explain the conditions behind the view so another dispatcher can interpret what is visible.
The labels and behavior here follow Brazil, with the same application steps in Australia; check availability on your instance and release. For wider operating habits around queue review, see field service management best practices.
Choose criteria that represent the dispatching decision
The available criteria are State, Window End, Skill, Parts, and SLA Breach. Each has an operator set suited to its value type. Select the criterion first, then use the operators available for it. Do not assume an operator seen under one criterion will appear under another.
Window End uses date and time comparisons: Before, After, and Between. Use it when the decision depends on the task’s window ending relative to a time boundary. For example, a dispatcher planning work around an upcoming cutoff can use a time condition before adding another constraint.
The remaining criteria support operators such as Include Any, Include All, Exclude All, Contains, and Starts With, according to the criterion. Read the chosen operator alongside the value before applying it. An inclusion question and an exclusion question can produce very different working lists even when they mention the same skill or part.
Use Skill to find tasks carrying a skill requirement. This criterion tests whether the skill is present on the task. It does not evaluate whether the skill is mandatory, its required level, or its expiration status. A match therefore helps identify relevant work, but it is insufficient evidence that a particular technician meets the task’s requirements.
Use Parts when part requirements define the subset you want to inspect. Keep the decision narrow: identifying tasks associated with a part is a different check from deciding whether those tasks are ready for assignment. Build that distinction into dispatching reviews to avoid the assumptions covered in common field service management mistakes.
Combine conditions without losing the base queue
All selected quick filter criteria share the same logic operator. Mixed logic is not supported. With AND, a task must satisfy the selected conditions together. With OR, matching one of the selected conditions can qualify it, subject to the task base filter.
The task base filter remains an additional AND restriction. For example, Pending Dispatch or All Active Tasks still defines the starting population.
- Use AND when the dispatching question requires the conditions together, such as a skill requirement alongside a window end condition.
- Use OR when either selected condition should bring a task into view within the base queue.
- If the question requires some conditions joined by AND and others by OR, separate the review into simpler passes.
Before applying a multi-condition filter, say the intended rule in one sentence. Then compare it with the selected operator. If the sentence needs both “and” and “or,” the intended rule may exceed the supported logic. Splitting the review makes the selection easier to explain and the resulting list easier to check.
When an expected task is absent, inspect the base filter as well as the quick filter. A correctly configured quick condition cannot bring a task into a base queue it does not satisfy.
Choose the task panel or calendar deliberately
Filter task panel updates the task list. To extend the selection to the calendar, open the arrow beside that control and select Filter task panel and calendar. Choose this scope before comparing the two views, particularly when a dispatcher needs to relate a selected task list to scheduled work.
The calendar represents nonmatches differently: quick calendar filtering dims nonmatching tasks and events instead of removing them. The quick calendar filter only applies in day and workday calendar views, so switch to one of those views before comparing the calendar with the task panel. A dimmed calendar item and an absent task panel item can therefore reflect the same conditions. Check how each view presents the result before treating the difference as an inconsistency.
The task panel and calendar can use different criteria and operators, or share the same ones. Their defaults can also be saved independently or scoped to both.
Select Save as default when the filter should apply automatically when Dispatcher Workspace opens. Reserve a default for a recurring review need. For temporary investigations, consider whether saving would cause a later shift to begin with an unexpectedly narrow view. Record the default’s owner and the handover expectations in your field service management governance model.
Check SLA details before deciding the next action
SLA Breach helps isolate work for attention, but a filtered result still needs inspection. To view SLA details on a task, the role required is wm_admin or wm_dispatcher.
The task card in the task panel shows the time remaining before the SLA breaches. In the calendar, a bar under the task changes color as the SLA progresses. The Task SLAs list separates actual time left, which runs on the clock, from business time left, which counts only business-calendar hours. In the default work order SLA mapping, priority 1 is Critical and priority 4 is Low, so a lower number means more urgent work. Compare urgency with the work requirements before choosing what to investigate next.
To see a work order’s SLAs, open the work order form and select the Task SLAs related list. To review every task with an SLA, go to All > Field Service > Work Order > Work Order Tasks With SLAs, where tasks behind schedule are highlighted by how delinquent they are. Inspect Actual elapsed time, Actual elapsed percentage, Actual time left, Business elapsed time, Business elapsed percentage and Business time left.
Business elapsed percentage and business time left use the business calendar; without a business calendar, they equal their actual elapsed percentage and actual remaining time counterparts. This distinction matters when comparing a clock-based impression of urgency with the time reported for an SLA.
Keep filter results responsive and explainable
For Skill or Parts conditions using Contains or Starts With, enter complete words where possible. Very short fragments can broaden the result and affect performance. Start with the term that represents the intended requirement, then inspect whether the returned tasks fit it.
Additional conditions can increase response time, especially when several search related records such as skills or parts. AND performs better than OR. Use AND when it expresses the decision correctly; do not change the decision merely to use a faster operator. OR across multiple conditions can be slower with a large base queue such as All Active Tasks.
If results take longer after a change, review the breadth of the base queue, the number of related-record conditions, and partial text values.
Questions about dispatching filter handovers
What should a dispatcher record when reporting an unexpected result?
Record the base filter, selected criteria, operators, values, and affected task number. Include whether the issue concerns the task panel or calendar. This gives the next reviewer a specific selection to examine instead of a general report that work is missing.
How should a team choose between two reasonable defaults?
Compare the work each default would leave outside the initial view. Choose according to the recurring dispatching responsibility, and document when a broader review is needed. A default should support a known routine rather than silently define the team’s entire workload.
What is a sensible filter acceptance check during rollout?
Prepare tasks with known matching and nonmatching requirements, then compare the selection with the expected outcome. Include a case outside the base queue. That tests the business interpretation of the filter as well as the dispatcher’s ability to apply it.
When should a filter request become a process discussion?
Escalate the question when dispatchers disagree about which work deserves attention, even though they agree on the filter results. Establish the selection rule and handover responsibility first. Agree who acts on the filtered work before changing the conditions. Otherwise each review reopens the same question about priority.
For help planning or carrying out this work on your instance, see our ServiceNow implementation services.