OBLYTECH Logo
OBLYTECH Logo

Create a part requirement

To create a part requirement in Dispatcher Workspace, open an eligible work order task, select New in the Part Requirements related list, enter the part model, quantity, and delivery deadline, then click Save. The creation action requires wm_dispatcher. Review the saved requirement before treating the parts as sourced or delivered.

Prepare the work order task before adding parts

Start with the task that needs the material. A requirement attached to the wrong task can contain a plausible model and quantity while still giving the dispatcher the wrong basis for planning. Check the task number against the work being arranged before opening its parts list.

The supported task states for this creation procedure are Awaiting Qualification, Qualified, Assigned, and Work in Progress. Draft tasks are also supported when Apply Work Order template in draft status is enabled. Check that configuration and the available fields on your instance and release before using the Draft route.

Work order templates can add part requirements to a work order task automatically. Inspect the existing requirements first, especially when the job began from a template. A manual addition should represent a material need that is missing, rather than a second entry for a need already recorded.

Before entering data, establish which model the work needs, the total quantity, the delivery deadline, and whether the task depends on that part. These are decisions about the job, so a dispatcher should resolve uncertainty with the person specifying the work. For planning questions across teams, use the field service requirements workshop questions.

Create a part requirement in Dispatcher Workspace

Use the wm_dispatcher role for this action. The following sequence starts from the workspace navigation and ends with saving the requirement against the selected task.

  1. Navigate to All > Field Service > Dispatching > Dispatcher Workspace.
  2. In the task panel or calendar, select the number of the eligible work order task.
  3. Find the Part Requirements related list and click New.
  4. Review Service order task to check the association, then complete the form fields, starting with Model and Required quantity.
  5. Review Required by date and decide whether Mandatory applies to this part.
  6. Click Save, then inspect the saved result and any message at the top of the form.

When several visits or tasks belong to the same work order, keep the material requirement tied to the task that will use it. As a working check, compare the task you opened with the Service order task value before saving.

If the part is out of stock, a message at the top of the form identifies it. Treat that message as a reason to review material availability before making a dispatch commitment. A requirement records the demand; a stock warning still needs attention after the form has been completed.

Enter the model, total quantity, and deadline deliberately

Model and Required quantity describe the demand

Model is where the part the job calls for is recorded. Required quantity records the full amount needed to satisfy that requirement. Establish those two values together: a correct quantity for the wrong model does not describe the material the technician needs.

Use the total demand when assessing Required quantity. Reserved quantity has a different purpose: it shows how much has already been sourced. For example, if the work needs four units and two have been sourced, the demand is still four units. Do not reinterpret the required amount as the remaining gap.

Required quantity locks once every unit of the requirement has been sourced. That behavior matters when someone asks why a quantity can no longer be edited. Compare the reserved amount with the total demand before escalating a field-access problem. If someone requests a different amount after sourcing, first establish what has changed in the job and which existing requirement that change concerns.

Required by date needs an operational check

Required by is the day the full set of parts has to be on site. Its initial value comes from the task’s expected travel start time, and the date can be changed manually when necessary. Review the populated date against the actual material need instead of accepting it without checking.

For example, a job may need parts ready before the technician begins the planned trip. Use that business need to assess the date presented on the form. This is a planning judgment; it should be agreed with the people arranging the work rather than inferred from a convenient calendar opening.

Mandatory expresses dependency

Mandatory is ticked when the task cannot be carried out without this part. Decide this from the work itself. Ask whether the technician could perform the task without the item, and use the answer to guide the selection. Keep the decision separate from how quickly the item can be obtained.

Read the saved record without confusing the indicators

A successful creation produces a record with an SOPR-prefixed number in the sm_part_requirement table within Service Order Management. Number is generated automatically. Record that identifier when following up on a specific material need so that another dispatcher can distinguish it from similar requirements.

The form separates the requested amount from sourcing and delivery information. Read the values together before describing the requirement as ready for the visit:

  • Required quantity: the total number of parts the task needs for this requirement.
  • Reserved quantity: the quantity that has already been sourced.
  • Sourced: shows that the whole required amount is reserved and a request to move it from one stockroom to another is in place.
  • Delivered: shows whether the transfer order lines for this requirement have reached their destination.

A saved requirement establishes the requested material. It does not, by that fact alone, establish reservation or delivery. Make dispatch decisions using the relevant quantities and indicators instead of using the presence of a requirement number as proof that material is ready.

When the next question is how material requests fit the wider inventory process, see field service parts and inventory requests. Keep the immediate handoff specific: identify the task, the requirement number, the model, the amount needed, and the delivery deadline.

Check problems at the point where they occur

If creation does not appear available, check in this order: that the Part requirements are needed by agents option is enabled on the Field Service Configuration screen, the selected task’s state, and that you hold the wm_dispatcher role. Those checks address eligibility and access before anyone changes the requested material. Avoid switching tasks just to find a form that opens, because that can move the demand away from its intended work.

If the saved demand looks duplicated, compare it with the requirements present before manual entry. Template-generated requirements are a reason to inspect the related list early. During review, compare the task, model, quantity, and business need rather than relying on similar descriptions alone.

If the delivery plan looks wrong, revisit the Required by date value and the task’s expected travel start time. If the amount looks wrong, distinguish the total demand from the sourced amount. These checks separate a data-entry issue from a material availability issue and make follow-up more precise.

For broader operating checks, use field service management best practices. For help planning this work, see ServiceNow implementation.

Questions about requirement descriptions and team handoffs

Why is Short description missing from the form?

Short description is not displayed by default. Its absence does not mean a dispatcher failed to supply the model or quantity. Review the fields that define the material need rather than using the visibility of this descriptive field as a completion check.

Where does Short description come from for an incident-based work order?

When a work order originates from an incident, problem, or change request, the requirement inherits its short description from that originating record. This explains why a description can reflect the original service issue rather than a part-specific phrase entered by the dispatcher.

Should two requirements with similar descriptions be treated as duplicates?

As a review practice, establish what each record represents before deciding that. Similar wording can be insufficient to distinguish separate material needs. Ask the person responsible for the work to resolve ambiguity, using the record numbers to keep the conversation tied to the intended entries.

What should a dispatcher include when handing a requirement to another team?

A concise handoff can pair the record identifier with the unresolved decision: for example, whether the specified model meets the work need or whether the delivery deadline is achievable. Include the decision owner in your working notes and state the consequence for the planned visit. A question about model suitability needs a different answer from a question about whether the requested material can arrive in time.