ServiceNow Manufacturing Commercial Operations (MCO) lets dealers request reimbursement for warranty and recall repairs through the dealer portal. Claim jobs record parts, labor and other charges for manufacturer review. Pre-authorization establishes coverage before work begins, while approval decisions distinguish payable jobs from rejected charges or requests needing more information.
Friction usually sits in the gap between what the dealer can see and what the manufacturer needs to see. A missing record, a labor code that does not match the repair, or a charge that skipped pre-authorization can send a claim back and forth.
Who does what in a warranty claim
Four roles carry the work.
- Manufacturing operations admin: creates manufacturer-side repair claims in the CSM/FSM Configurable Workspace Repair list. Creating dealer records requires manufacturing operations admin (sn_mfg_cmn.manufacturing_operations_admin).
- Dealer service advisor (sn_dealer_mgmt.dealer_service_advisor): submits pre-authorization requests through Dealer Portal.
- Warranty specialist (sn_claim_cmn.warranty_specialist): creates pre-authorization requests in the workspace and reviews and approves submitted pre-authorizations.
- admin: submits repair claims through the dealer portal and configures portal access. These requirements apply to those specific actions; test dealer permissions before rollout.
Raising a repair claim from the dealer portal
A repair claim has two parts. The claim details record describes the job, and one or more claim jobs carry the cost lines. Each claim job is typed as Warranty or Recall, and the form that opens next changes with that choice.
For portal submission, navigate to Dealer Portal > Catalogs > Customer operations > Repair claim. Complete Claim details, select Continue, then Add claim jobs. Set Type to Warranty or Recall, complete the job fields and select Submit. On the manufacturer side, a Manufacturing operations admin can start a claim through Workspaces > CSM/FSM Configurable Workspace > List > Repair, then New.
Claim details
The claim details form asks for the asset repaired, the user raising the request, and the dealer. The product usage field records the number of assets used, which gives the manufacturer insight into how customers use the product.
Consumer is populated from the install base. External work order holds the work order reference as a string. Before continuing, compare that reference, the Asset and Dealer against the repair record; this gives a returned claim a traceable starting point.
Claim jobs and cost blocks
The repair claim form is split into blocks, and each block calculates its own amounts.
- Parts: enter Part number, Quantity, the unit of measure, Base amount before tax and Tax rate. The form calculates Claimed amount using the entered values.
- Labor: enter Labor code, Duration, Base amount and Tax rate. Duration units include Year, Hours, Month and Days.
- External services: describe the outside work and enter its Base amount and Tax rate.
- Miscellaneous: describe the additional services and enter Base amount and Tax rate.
Claimed job amount combines the claimed amounts for parts, labor, external services and miscellaneous services. Attachments hold evidence supporting the claim. Check each cost block before relying on the job total; a correct total does not establish warranty coverage.
The repair action offers Repair, Replacement or Software update. The causal part replacement field opens when the action is Replacement, or on a recall job when the remedy type includes replacement.
Pre-authorization before the work starts
High-cost repairs often need approval first. A pre-authorization request confirms that a repair, a parts purchase or a labor charge is covered under a warranty or service agreement. A warranty specialist makes that decision. The dealer service advisor opens Dealer Portal > Catalogs > Customer operations > Pre-authorization, completes the request, selects Continue and adds claim jobs. After completing the jobs, select Save and Submit. For the general entitlement concept, see entitlements explained.
Pre-authorization jobs are either Warranty, covering repair, replacement or service the warranty includes, or Goodwill, covering repair services the manufacturer may provide free or at a discount at its own discretion. Keeping the two apart in the record shows which basis applies.
A pre-authorization has a validity window, and the platform enforces it. A claim can be submitted while its pre-authorization is valid. After the window passes, submission is blocked with an error. Track the expiry date from the moment approval arrives.
After the warranty advisor approves the request, the Create claim option is enabled for the dealer.
How the manufacturer reviews and approves claims
Reviewers work in the CSM/FSM Configurable Workspace. Approve, reject and partial decisions leave a summary in Claim Summary. From Activities, select Review & approve. Four decisions are available.
- Approve all: approves the claim jobs together.
- Reject all: rejects the claim jobs together.
- Partially approved: lets the reviewer approve, reject or delete individual jobs, or reduce an Approved amount.
- Send back: returns the claim to the dealer for additional information.
The partial option separates payable jobs from jobs requiring a different decision. For example, approve a covered repair job and reduce another job’s Approved amount when its claimed charge exceeds the accepted amount. Use Send back when information is missing, recognizing that this returns the claim to the dealer. Check Claim Summary after the decision so the recorded outcome agrees with the intended job-level treatment.
Anomaly checks on incoming claims
Claims raised through the dealer portal can be screened for suspicious patterns. With the admin role, enable the initially inactive skill through All > ServiceNow Otto Admin > Skills, then Customer > MCO > Detect Claim Anomaly. Its checks include:
- Similar claim patterns.
- Duplicate claims.
- Reused dealer images.
- Usage mismatches, where recorded product usage looks inconsistent.
- Abnormal spikes in claims from a dealer.
- Mismatched or incomplete supporting documents.
A flagged claim appears in the Agents portal with a Reject status. The reviewer selects a record whose Potential action is Reject/Suggested, selects Review & approve, and reads the generated analysis before deciding. The flag starts the review and does not replace it.
Recall claims use the same path with a campaign attached
A recall claim requests reimbursement from the manufacturer for repair work tied to a recall campaign. The dealer selects the asset being repaired, sets the claim job type to Recall, and picks a corrective action. The part number, remedy type and repair details fill in from that action, and the dealer checks them before submitting.
Setting up the dealer channel
Claims depend on dealer and partner records being right before anyone submits.
Dealer records
Dealers are created in the CSM/FSM Configurable Workspace under MCO Setup, using the manufacturing operations admin role. Dealer numbers carry the prefix DLR. The external code field holds the identifier the dealer carries in an outside system such as an ERP or CRM, so a claim can be traced to its source. The business function is Sales, Sales and service, or Service only.
Channel partners
Channel partners are managed in Partner Relationship Management, with numbers prefixed CHPRTNR. The fields that matter for claims work are the parent channel partner, the status (Suspended or Terminated), and the Business function, which describes the partner’s commercial activity, such as sales, distribution, implementation, service delivery or customer support. Creating a channel partner requires admin; use Partner Relationship Management > Channel Partners in the workspace, select New, complete the form and Save.
Turning on the dealer portal
Check these workflows against your installed application version and release before granting access. The portal needs configuration before any dealer logs in. Enable the dealer portal feature flag in MCO Setup, create dealer accounts with roles for claim submission, recall access and reporting. Run an end-to-end test cycle with dealer user accounts, submitting a test claim through the portal. Check approval progression, captured data, status notifications and access to the appropriate reporting views. Test recall visibility as well as claim submission; a working login alone does not establish that these workflows are accessible. For the general self-service portal concept outside manufacturing, see customer self-service portal.
Dealers can also submit a product non-conformance issue report from the portal, under quality issue management.
Common slowdowns to plan for
A few patterns cause many of the delays in dealer claims work. Each can be reduced with setup and a short routine.
- An expired pre-authorization blocks submission, so track approval dates and convert approved requests promptly.
- A claim raised with the wrong job type shows the wrong fields. Confirm Warranty or Recall before entering costs.
- Auto-populated repair details are a starting point. A quick check before submission helps avoid a return.
- Missing documents lead to a send-back loop. Attaching the supporting record on the first submission typically helps avoid a send-back.
Questions about claim references and supporting records
Can an approved pre-authorization populate a new claim job?
Yes. Pre-auth case line lists the previously created repair pre-authorization lines associated with the claim. Selecting a pre-authorization brings in part and miscellaneous details. Compare the populated values with the completed repair before submitting.
Can a service agent change recall repair details?
Yes. Repair details initially comes from the selected corrective action, but the service agent can modify it. Use that field to describe the repair performed while retaining the connection to the relevant corrective action.
How should a dealer choose a parts quantity unit?
Match the recorded quantity to its packaging or counting unit. Available parts units include Case, Pack, Carton, Kit, Each, Bundle and Box. Treating a kit as individual parts can make the quantity misleading even when the part number is correct.
What distinguishes a dealer number from an external identifier?
The generated DLR number identifies the dealer record in MCO. External code preserves the corresponding identifier from another system. Keep both in reconciliation checks so an ERP or CRM reference can be matched without replacing the MCO record number.
Where this sits in the wider manufacturing setup
This page covers claims between a manufacturer and its dealers. For the claims model in ServiceNow customer service, see claims management. For the wider set of manufacturing applications, see the ServiceNow for manufacturing overview. Customer-facing service requests are covered on customer service management for manufacturing.
For help planning this work, see ServiceNow implementation.