OBLYTECH Logo
OBLYTECH Logo

Product Offering Catalogs and Categories in ServiceNow Sales CRM

Product offering catalogs in ServiceNow Sales CRM are the top-level containers that agents browse while they build opportunities, quotes and orders. A catalog holds categories, categories hold product offerings, and specifications describe what gets fulfilled behind each offering. This guide explains how those layers relate and the order to set them up in the CRM Workspace. For a general overview of the term, see the product catalog basics page.

How the catalog, categories and offerings fit together

Product Catalog Management groups product offerings so agents can find what a customer needs while a lead, opportunity, quote or order is open. A catalog sits at the top, categories sit beneath it, and a category can hold child categories or product offerings. The offering is the thing a customer buys: a physical good or a non-tangible service that can be configured. For a separate explainer on catalog items, see the catalog item page.

Browsing follows the category tree. Search is the other route, by keyword, and administrators can turn on AI Search, which combines semantic and keyword matching so requests can be phrased in ordinary language. Customers can browse the product catalog in the Business Portal, select products and their options, and create orders in Order Management. The Order Management section is the next place to look for that side of the flow.

Three other entities sit alongside the tree. Families group offerings that share features. Characteristics capture the choices a customer makes. Specifications describe the product, service or resource records the order is fulfilled through. A category answers where an agent finds an offering, a family answers what else shares its features, and a specification answers what has to be delivered. Readers who need the service side of this can start with the service offering explainer.

Setting up the catalog and its publishing states

Build the catalog first. In the CRM Workspace list view, go to Offerings, then Product Offering Catalogs, and select New. The form takes a generated number, a name, images, a description, a state, start and end dates, a code and a Default setting.

The Default setting marks the catalog agents see first, but agents can switch to another default catalog.

Saving places the catalog in Draft. Publishing moves it to Published and opens the Categories tab, which is the cue for the next step. The supported life cycle states are Draft, Published, Retired and Archived.

Building the category tree and linking it to a catalog

Categories are the working middle layer. Each is created under Offerings, then Product Offering Categories. The Leaf setting decides the shape of the branch, so settle it before you add anything underneath. A leaf category can hold product offers but no subcategories. A category that is not a leaf can hold subcategories but no product offers.

To attach a category, open its Catalogs tab, select New, choose the published catalog, and save. Then publish the category from its Details tab. Parent and child relationships are set on the Parent categories and Child categories tabs.

Category state What it means
Draft Created but not yet published
Published In the catalog and open to updates
Retired No longer active, and it cannot be updated
Archived No longer available for use

A published category can be deleted, retired or archived when no product offerings are attached to it. The setup sequence publishes the category before the next step, which is creating product offerings in it.

Using families for shared rules

A family is a collection of offerings that share features or come in several variations. Families nest in a multi-level tree, such as Hardware, then Computers, then Laptops. The point is to apply attributes, business rules and updates at the family node instead of editing each offering.

Rules are not inherited down the tree. A rule written for Computers does not reach Laptops or the offerings beneath it, so write the rule for each family it should cover. This is the detail that often catches teams out.

Families also support reporting, since sales data can be rolled up by family for forecasting. To create one, go to Offerings, then Product Offering Families, and enter a name, a description and an optional parent. A family cannot be its own ancestor or descendant, and a loop is blocked with an error.

Adding characteristics that shape the offer

Characteristics capture the preferences that change what a customer can choose. Add them from the Product Offering Characteristics tab of an existing offering. You pick a characteristic and an option, creating either if needed, then set the type, order and flags.

Mandatory means the customer must complete that option before the order can finish. Default marks the pre-selected choice. Customer input required means the buyer must supply a value. Options carry an order number, and option 1 appears first. These can be added to offerings that are not yet published.

Specifications and what they drive during fulfilment

A specification describes how a product, service or resource is built and delivered. The offering is what the customer buys. The specification is what the business sets up to deliver it. Specification relationships link the two and determine how an approved order breaks down.

Each relationship has a source specification, a target type of product, service or resource, and a target specification. The target can still be in Draft, so it does not have to be published before you select it.

Relationship type Effect on the order
Composed of The order decomposes into a single service order
Realized as The source is delivered as the target specification
Bundles Each bundled target becomes its own order line item
Requires The target resource is needed to deliver the promised services

The Mandatory flag decides whether the target is included. A mandatory target comes with the source each time. An optional target is included when the customer selects it. For example, an SD-WAN service package might treat its edge device and controller as mandatory, and a security add-on as optional.

Quantity works through a minimum, default and maximum on the relationship. On a product specification, a quantity characteristic can map the customer’s entry onto the target. Decomposition then creates the matching number of domain orders for the target. The Order field sets sequence when there is more than one relationship.

Changing published catalogs and specifications

Published offerings accept minor updates only to the fields the minor-update topic lists, and those changes need the admin role. Small changes go through a minor update, which needs the admin role. You can change the name, display name, description and sellable setting, and switch allow multiple configurations from unselected to selected. You can also change customer input required, order and mandatory on characteristics, and the display name and order of product offering relationships.

Any other change, including adding a child offering, needs a new version of the parent offering. A new version is created from a published offering: the next version of the offering is displayed, you make and save your changes in the Details tab, and then you publish it.

Published specifications follow their own minor-change path. Name, display name, description, line, external code and order can be edited, and characteristic options can be added. Changes take effect on save.

Configurable offerings and their blueprints

A configurable offering, sometimes called a complex offering, has several characteristics and one or more product relationships. Tick Configurable on the offering, even before adding characteristics, so the CPQ Configurator is used. Then select Create Configuration. The sync moves through Sync Not Initiated, Sync initiated and Sync success.

The sync generates a blueprint holding the attributes, related rules, configurator layout, configurable child products and enrichments. Enrichments are scripts that fetch external data such as pricing during configuration. Rules defined in Product Catalog Management must be updated there, not in the blueprint, although new rules and fields can be added in the blueprint. If the sync fails, the Configuration Errors tab shows the errors.

While the offering is in Draft, Update configuration revises it. Publish runs another synchronization, and the product offering is then published to the product catalog.

Checking the hierarchy before you publish

On a product offering, the Catalog Hierarchy tab shows the offering tree. The Show specification toggle switches to the specification view, which lists the services that enable the product, the resources that deliver them, and the relationships between specifications. Selecting a node opens its high-level details, and the filter displays the branch under a chosen node. Use the view to confirm that linked entities are defined correctly before the offering reaches an order.

Frequently asked questions

Can I add product offerings to a category before the category is published?

Publish the category first. Attach it to a published catalog, publish it from its Details tab, and then add the offerings.

Why does a family rule not reach its sub-families?

Rules are not inherited through the family hierarchy. Write a separate rule for each family that needs it.

Can I change a published product offering?

Small changes can go through a minor update with the admin role. The minor-update topic lists the fields that can change in place. Other changes are made by creating a new product offering version, following the version steps.

Can customers order directly from the catalog?

Yes, but only for authorized customers by default. The catalog is visible in the Business Portal to users with the customer role who are registered in the CRM software, and the CustomerPortalCatalogAccessUtil script extends visibility to other users. Customers can then create orders from the Business Portal. Confirm your release and entitlements before planning a customer-facing rollout.