OBLYTECH Logo
OBLYTECH Logo

ServiceNow Mega Menu: Topics, Levels and Advanced Navigation

The Employee Center mega menu is the drop-down navigation in the portal header. Its items come from a taxonomy of topics, and a topic appears when it is active and has connected content the viewer can open. The standard menu shows three levels. Advanced Portal Navigation adds layout control, side navigation and menu items that are not topics.

What decides which topics appear in the mega menu

The taxonomy linked to the Employee Center portal record determines the menu. By default, the topics and child topics in that taxonomy appear as mega menu items.

Two conditions filter what a reader sees. The topic must be active, and it must have connected content such as catalog items, knowledge base articles or quick links. A reader must be able to open at least one of its connected content items.

The taxonomy depends on the Employee Experience Taxonomy plugin, identified as sn_ect. Install and activate that plugin first. The base Employee taxonomy installs with it and includes IT, HR, Workplace, Legal and Procurement menus.

How the three-level menu displays

The standard mega menu displays three levels: a root topic, a child topic 1 and a child topic 2. The IT path is a clear example: IT, then Hardware, then Printers. Root topics sit in the header, and child levels open when a reader clicks the menu.

Layout follows the number of child topic 2 items under each child topic 1. In the Australia release, the rules are these:

Child topic 2 items under one child topic 1 How the menu displays it
None The child topic 1 appears as a simple list under its root topic
Up to 10 A single column
More than 10 Two columns
More than 20 Two columns showing 20 child topic 2 items; the rest are listed through the Sub-Topics widget on the child topic 1 page

Expanded layout allows four levels, one menu item plus topics up to three levels deep. Standard layout allows three. Employee Center uses the standard layout out of the box, and Employee Center Pro uses the expanded layout. Topics from one hierarchy cannot be mixed with another.

Building the topic tree

Start by cloning the default taxonomy. Go to All > Content Taxonomy > Taxonomies, open the default Employee taxonomy, select Clone, enter a name and select OK. The clone copies the taxonomy and its contents. To change the default taxonomy, clone it first and make your changes in the clone.

Edit the clone, select Update, create a root topic and associate it with the clone. Then create child topics: go to All > Content Taxonomy > Topics, open the parent, select the Child Topics tab, choose New, fill in the form and select Submit. Child topic creation needs the taxonomy_admin role plus one of the user criteria Taxonomy Manager, Taxonomy Contributor, Topic Manager or Topic Contributor. Repeat for deeper levels, staying within the three-level limit.

Connected content comes next. Go to All > Content Taxonomy > Connected Content, select New, fill in the form and select Submit. Then enable user criteria on the topics to set topic-level visibility. Associate the taxonomy with the portal you created, and deactivate the existing taxonomy so search picks up content from the new one.

Loading the mega menu asynchronously

The mega menu can load in the background so the homepage stays responsive. Find the three properties by entering sys_properties.list in the navigation filter.

  • sn_ex_sp.megamenu_async_load switches asynchronous loading on or off. It is off by default. When it is on, a skeleton loader appears while the menu loads.
  • sn_ex_sp.megamenu_async_load_skeleton_view controls what a reader sees while data arrives. When it is on, the skeleton stays until the data is ready. When it is off, the previous session’s menu stays on screen until fresh data arrives, then the page updates.
  • sn_ex_sp.megamenu_async_timeout sets the load limit in milliseconds. The default is 15000, or 15 seconds. After that, the load stops and a message asks the reader to try again later.

Checking that a change has reached readers

Topic changes are saved in the session cache, so a reader who is logged in keeps the old menu until logging in again. If the mega menu is empty, check whether the Employee Experience taxonomy demo data is installed. Select Load demo data during installation or repair. For other checks on the portal, see the Employee Center troubleshooting guide.

Advanced Portal Navigation as a separate record

Advanced Portal Navigation, or APN, is managed at All > Employee Center > Advanced Portal Navigation. An APN record builds the primary menu from topics, Service Portal menu items or both. It offers two navigation styles.

Top navigation appears in the header as a mega menu and supports up to four levels of hierarchy. Side navigation is a left-hand, icon-driven menu with two levels. Only the first level of child items shows in the left menu, and deeper levels open on hover or click. Single-click sync covers all APN hierarchy levels, replacing level-by-level sync.

Only one APN record can be active per portal. Activating a record replaces the current Employee Center menu, so deactivate any other active record first. Existing customers must activate the APN record after upgrading to the latest release, and for Employee Center and Employee Center Pro the record starts inactive for them. Once APN is active, you manage root-level topics and menu items from the APN table, not from the taxonomy or the Service Portal menu.

Setting up an APN record

Open the Advanced Portal Navigation list, select New or open a record, then select Active and Submit or Save. A pop-up asks whether to bring over the existing navigation. Choose Skip to build from nothing, or Yes to fetch the existing menu items, topics and associated quick links.

Build the hierarchy with New, which creates an item or adds one from the available list, or with Sync hierarchy, which fetches the existing items. Quick links are not fetched for an existing hierarchy, so add them by hand. For a sync to pick up Service Portal menu items, those items must be associated with the portal the APN record configures.

Finish by completing the Navigation menu item related list and selecting Update. The fields below are available in the base system from Employee Center version 31.

Field What it controls
Source A taxonomy topic or a Service Portal menu item
Topic A taxonomy topic. Only active topics are available.
Menu item An item taken from the Service Portal menu
Order The position of the item relative to other items
Active Only active records are synced
Render as Menu or Modal window
Submenu display type Expanded or Standard, shown only when Menu is chosen at root level.
Widget and Widget parameters Used for a Modal window. Parameters are name-value pairs.
Browse button Shows the browse option. At root level, you can set its display text.
Browse button display text Generated from the topic for taxonomy sources, for example Browse HR systems

Newly synced items keep their existing order, and a topic without an order value receives 999999.

At root level, blank display text shows the default label, Browse all. In standard view the browse option appears at root level only; in expanded view, at root level and the first level. A root item with no child items and no active quick link shows no Browse button. Disabling the Browse button hides it on desktop only.

Sync status, updates and reordering

The sync status field shows Never synced, In progress or Completed. While a sync is in progress, you cannot update or delete the APN record or its menu items. An email reports the results and the number of changes. To show the sync status field, deactivate the Hide sync status UI policy under All > System UI > UI Policies.

Taxonomy and Service Portal menu changes do not reach the primary navigation on their own. Run Sync hierarchy to bring them in. To pull in menu changes alone, use Sync menu changes from the order list and confirm. New items then appear at the end of the menu straight away. For the wider setup sequence, see the Employee Center best practices page.

Adding non-taxonomy links to the primary navigation

Links that are not topics, such as a standalone page, go through the Service Portal menu. Go to All > Service Portal > Menus and set the Application scope to Employee Center, which is required before a menu item can be added. Open the menu through its preview, select New in the Menu Items related list or open an existing item, fill in the form and select Submit. For a broader view of how Service Portal navigation is designed, see the Service Portal navigation design article.

Org Chart appears by default with the Content Delivery plugin, and Employee Forums appears in Employee Center Pro with the Communities plugin.

Frequently asked questions

Why does a topic not show in the mega menu?

A topic shows when it is active and has connected content. The reader also needs access to at least one of that topic’s connected content items. If the whole menu is empty, check that the Employee Experience taxonomy demo data was loaded during installation or repair.

How many levels can the menu show?

The standard mega menu shows three levels: a root topic, a child topic 1 and a child topic 2. Top navigation in Advanced Portal Navigation shows up to four, and side navigation shows two.

Why does a root item have no Browse button?

A root item with no child items and no active quick link shows no Browse button. Disabling the Browse button hides it on desktop only.

Does editing the taxonomy update the navigation automatically?

Not in an active APN record. Changes to the taxonomy or the Service Portal menu do not reach the primary navigation on their own. Run Sync hierarchy to bring them in.