OBLYTECH Logo
OBLYTECH Logo

Safe Workplace Employee Health Screening Setup Guide

Setting up Safe Workplace for entry comes down to four linked pieces: installing the Employee Health Screening application, setting entry thresholds and reset rules, defining the requirements that decide who counts as cleared, and deciding whether vaccination records feed those requirements. The screen handles the door, and the status page shows each person’s position. For the wider suite, see the health and safety management hub.

Install the apps in a sensible order

Installing Employee Health Screening is an admin task, started from the list of all available applications under System Applications. The app ships with demo data and installs any store applications and plugins it depends on, so read the dependency dialog before confirming.

Decide on demo data at install time. Once skipped, a store application’s demo data cannot be loaded later, so load it on a development or test instance.

If part of the Safe Workplace suite is already present, the remaining apps install in a fixed sequence, starting with Emergency Outreach and then Employee Health Screening, with Vaccination Status near the end. Install them in that order.

The install also creates roles and tables. The health monitor role records returning employee details; the administrator role configures properties and temperature overrides.

Table What it holds
Request for Entry Results of screening events, plus status lookups when auto-create is on
Location Override Sites where employee temperature thresholds differ from the global setting
Employee Health Verification Health verifications employees submit

Set entry thresholds and reset rules

Properties sit under Employee Health Screening, then Properties. Set them before the first screen, since they govern entry.

Property Effect when set
Clear health verification daily Resets responses to No each day; off by default
Time to reset health verifications Sets the daily reset time in each user’s local time; midnight by default
Limit health verification submissions to once per day On allows one submission per day; off allows unlimited
Enforce cleared status as condition for Health Screening On requires a Cleared status to enter
Track temperature On stores readings; off uses the threshold for the entry decision and stores nothing
Disable temperature check for vaccinated employees Hides the Temperature field for vaccinated employees
Fever cutoff in Fahrenheit and Celsius Readings at or above the value are treated as a fever
Show QR code for entry Displays a QR code after a verification is submitted

Two choices deserve a decision before go-live. The temperature storage switch comes first: with it off, the threshold still gates entry, but no history exists to report on, and turning it on later starts recording from that point. The threshold itself should be the figure your organization has adopted. When one site needs a different threshold, create a location override rather than changing the global value. For incident reporting, see OSHA 300 injury and illness reporting.

Define what counts as cleared

A health and safety requirement turns a person’s records into one status, Cleared or Not Cleared. A requirement applies to employees or to visitors, not both, so a company needing both builds two. They are built in Flow Designer, and none is active on save.

The Employee Readiness Core application ships with pre-built requirements that can be activated unchanged. Each of the six below treats a person with no matching record as Not Cleared. The seventh pre-built requirement, Testing Requirement Satisfied, works the other way: a person with no test result is Cleared unless they are a potentially exposed contact.

Requirement What clears it
Employee Health Verification A verification submitted within the past seven days
Self Report A self report with the status Returning to work
Visitor Invitation A visitor’s agreement, submitted within the past two days
Exposed Contacts A Cleared status from the Contact Tracing exposed contacts record
Privacy Consent An employee’s answer of I Agree
COVID-19 Vaccine A record in the vaccine profile table from Vaccination Status

For a custom requirement, work through this sequence:

  1. In Workflow Studio, create an action in Employee Readiness Core with an input that references the proof record, such as the health verification table.
  2. Add a script step that runs on the instance, setting requirement_status to cleared or not_cleared. For the verification requirement, the status is cleared when the response is yes.
  3. Add a choice output named requirement_status, return it from the action, and publish.
  4. Under Employee Health and Safety Status, create a Health and Safety Requirement. Set the name, the applicable group, the default status and, if fulfillment expires, the valid-for period. Add an action link if employees should complete the task from the status page. Then add the previous records table and condition, so earlier completions count.
  5. Create a flow triggered on created or updated proof records, run for each unique change. Pass the trigger record to your action, then add Update User Requirement with the user, requirement, status and, when a valid-for period is set, the trigger datetime.
  6. Return to the requirement, choose the flow, click Update, then Activate.

Step 4 is the step to check before activation. Flows fire on new or changed records, so anyone who finished the task before activation stays Not Cleared unless earlier records were included.

Add vaccination status where policy requires it

Vaccination Status lets HR departments track the status of user vaccinations. Users submit records of completed vaccinations and can update their own status. Whether to collect this data is an organizational decision tied to workforce planning.

Setup covers data retention, reminder emails, exemptions, privacy consent and the vaccine types people may select. Users report a vaccination and its date, review earlier responses, or request an exemption with a reason. An admin or manager then confirms the status or approves the exemption in the Employee Readiness Core Approval Portal.

The dashboard appears under Self-Service, then Dashboards, for users holding the Vaccination Status admin or Employee Readiness Core admin role.

Widget Type What it shows
Vaccine Approvals Pie Approved, awaiting review, and rejected responses
% of Health and Safety Users with Complete Vaccinations Single score Share of health and safety users considered complete under your dose settings
Vaccine Responses (Monthly) Stacked bar Monthly responses reporting a vaccination against those reporting none
Employee Vaccination Status Rate (Monthly) Line Fully vaccinated users over time, kept current by a daily history job

The single score depends on the dose count behind it, so settle that count first. The organization also carries legal responsibility for collecting and keeping this data, and the default template wording is a starting point to adjust under data protection and employment law.

Set up the status page and visitor notices

Employee Health and Safety Status properties control visitor email. One message confirms a scheduled visit when an employee invites a guest. A second, sent a set number of days before the visit, asks the visitor to agree to safety policies. The visitor must answer yes before the Visitor Invitation Requirement clears.

On the employee side, the status page lists each requirement to meet before returning or visiting. Time-limited requirements show the time remaining, and the page shows requirements for the current location by default.

The verification form is reached from a link in an organization email or notification, or from the health section of the app. Employees should tick the acknowledgement once they can honestly agree to all the statements. The confirmation screen lists each requirement with a link to any open item, and shows an entry code when QR codes are in use. For the employee-facing portal around these pages, see Employee Center.

Run the entry screen

On a phone, a monitor taps Scan for Entry and reads the person’s QR code, or types a user ID if there is no code. On a computer, the monitor checks the person’s status under Employee and Visitor Status, then opens the request entry form.

Field Entry
Location The site being screened
Person The person being screened
Temperature unit Set for the location
Temperature The numerical reading
PPE Yes or No

Submitting returns an allow or deny message. A Not Cleared status with a deny policy means giving the person the next steps your policy sets, then moving to the next person in line.

Admins can review entry requests and denials, with their reasons, in the Employee Health Screen Overview dashboard under Employee Health Screening. For HR requests that fall outside screening, see HR case management.

Mistakes to avoid in the first weeks

Early problems usually come from ordering. Settle temperature storage before the first screen, not after weeks of readings you cannot report on.

Turning on enforced cleared status before any requirement has records is a mistake to avoid. Six of the seven pre-built requirements default to Not Cleared, so the first arrivals would be refused until they submit. Activate requirements, let records build, then enforce.

Forgetting previous records leaves people who finished the task blocked. Include them before activation.

Frequently asked questions

Does turning on temperature tracking store readings?

It stores readings when the track temperature property is on. When it is off, the threshold still decides entry, and the reading is not kept. The default is off.

Can one requirement cover both employees and visitors?

No. Each requirement applies to one group, so a company needing both creates two.

How long does a health verification keep an employee cleared?

The pre-built Employee Health Verification Requirement is valid for seven days. A custom requirement sets its own period when Use duration is selected.

Can a vaccinated employee skip the temperature check?

Yes, when the disable temperature check property is on. The Temperature field is then hidden for vaccinated employees.

Does an employee see the same requirements at each site?

Not necessarily. The status page shows requirements for the current location by default, and requirements can be targeted by audience. A person can be cleared for one site and not another.

For neighboring topics, the HR service delivery and risk management sections cover the wider ServiceNow platforms these apps sit within.