OBLYTECH Logo
OBLYTECH Logo

Dispute Rules and Content Packs

ServiceNow dispute rules content packs connect dispute questionnaires with network-specific reason codes and eligibility logic. For a Mastercard upgrade from Australia to Brazil, start by checking transaction fields, then test changed decision inputs, questionnaire answers, and ineligibility outcomes. Keep Mastercard, Visa, and Nacha checks separate because their content serves different dispute processes.

Scope the ServiceNow dispute rules content pack review

Begin with a short inventory: the installed content pack, its application version, the platform release, the transaction source, and the dispute categories your team handles. Use the Australia-to-Brazil path for the upgrade review described here. Check behavior on your instance and application version before adopting an expected result, because the Brazil Mastercard changes span several application versions.

Dispute Rules Content Pack for Mastercard supports dispute intake, categorization, and chargeback eligibility assessment. It requires Financial Services Card Operations (sn_bom_credit_card). Visa supplies a VROL-based questionnaire for determining dispute reason codes and a decision table for eligibility rules. Nacha supplies ACH return reason codes and determination logic. Record the questionnaire and decision table covered by each acceptance test.

For the wider service design, connect dispute work to your banking case management use cases. Record who owns transaction data, questionnaire design, and acceptance decisions. These are recommended project responsibilities, rather than additional application roles.

Check the Mastercard data before changing rules

Start with data availability. The Australia changes introduce fields on Financial Transaction Authorization and Financial Transaction. The transactionAmountLocal field is extended to Financial Transaction Authorization; it already exists on Financial Transaction. After upgrading, check that the new fields exist and contain values for the transactions used in testing.

  1. Choose representative authorization and clearing transactions for the dispute categories in scope.
  2. Check authorization inputs such as adviceReasonCode, merchantAdviceCode, originalMessageTypeIdentifier, transactionAmountLocal, and transmissionDateAndTime.
  3. Check clearing inputs such as businessServiceIdCode, cardDataInputCapability, cardholderAuthenticationCapability, and servicecode.
  4. Trace each missing value back to its source before drawing a conclusion about the eligibility decision.

Brazil adds a transit transaction type indicator on Financial Transaction, sourced from transitProgramCode in the Mastercard clearing API. It supports values 01 through 10. The TFRR and FRIL conditions use the indicator from Financial Transaction rather than Financial Transaction Authorization. Include a test where the authorization and clearing values differ so the assessment reveals which source is being used.

Also check the processing_code and merchant_advice_code choices on Financial Transaction Authorization. For example, processing_code includes 00 Purchase and 01 Withdrawal. Preserve the distinction between a missing source value and a valid choice. A field being present does not establish that the integration supplies the value needed for a particular dispute.

Turn changed eligibility conditions into paired tests

Write an expected result for the individual condition under review. Then create a matching case and a nearby case that should not match it. Keep other inputs stable. This approach helps distinguish a changed rule from an unrelated condition that also makes the dispute ineligible.

Test the renamed amount comparison

For Refund posted as a purchase, the Mastercard 4853 – Credit Posted as a Purchase decision table changes its comparison. The condition makes a dispute ineligible when its amount exceeds twice the original transaction amount, replacing the earlier not-equal comparison. The decision input changes from dispute_amount_neq_twice_transaction_amount to dispute_amount_gt_twice_transaction_amount.

Search your customizations for the old input reference and update affected references. Test amounts below, equal to, and above twice the original amount. Assess this condition separately from the final overall decision: another condition can still affect eligibility. Save the input values with the expected comparison result so a reviewer can reproduce the test.

Separate fraud reporting from fraud timing

The Brazil updates change fraud-report checks across RC 4837, RC 4849, RC 4870, and RC 4871. For the affected RC 4837 and RC 4849 conditions, an empty fraud report ID makes the dispute ineligible. The affected RC 4849 conditions no longer check the Mastercard fraud type. For Mainland China domestic RC 4870 transactions, the condition checks whether the fraud type is not 04 or the report ID is empty.

Use separate cases for a missing report ID, a populated report ID, and the applicable fraud types. Version 5.3.1 also changes the RC 4871 timing condition: it evaluates fraud types 00, 01, or 02 and a dispute raised more than three days after the report date, without requiring a report ID for that condition.

For RC 4870 and RC 4871 in version 5.2.2, and RC 4837 in version 5.3.1, repeat fraud chargeback checks use Fraud CB count before auth date. The threshold is two or more, counting chargebacks submitted before the disputed transaction’s authorization date. Include a chargeback submitted after authorization in the test data, then verify that it does not inflate that input.

For help planning this work, see ServiceNow implementation.

Verify questionnaire dependencies and rule retirement

The Colombia rules for RC 4837, RC 4870, and RC 4871 depend on questionnaire answers. The condition checks that the answer to the question “This dispute is due to (Mastercard)” matches the decision table’s reason code, and that the answer to the reversion of payment claim question is Yes. A No answer does not make the dispute ineligible under this rule.

The question is presented for the applicable Mastercard reason codes when the acceptor country is Colombia and the billing currency is Colombian Peso. Test both answers with the same eligible question context. Then test a transaction outside that context. Preserve the question response alongside the decision result; reviewing transaction attributes alone would miss the changed dependency.

Include removed conditions in regression testing. RC 4849 no longer includes the condition concerning a police complaint or coercion claim affidavit. RC 4837 removes the wallet identifier 101 condition combined with e-commerce indicators 221, 222, or 225. These removals apply to new and existing installations. Check that a local customization has not retained the retired behavior.

Keep rule ownership reviews separate from payment-network eligibility testing.

Test Nacha and Visa as separate acceptance tracks

For Nacha, follow the dispute sequence from initiation through submission. An agent creates the dispute case on behalf of a customer, or a customer starts in the customer portal. The user supplies the financial account, disputed transactions, questionnaire answers, and required supporting documents before submission for investigation. Check the resulting return reason against the content pack’s determination logic and the documentation requirements for that code.

Nacha ships ten reason codes and their determination logic. It adds no tables or custom roles; chargeback reason codes reside in Financial Services Operations Core. The Financial Services Card Operations roles govern access:

  • sn_bom_credit_card.dispute_agent has read/write dispute access and can trigger NACHA determination through the parent workflow.
  • sn_bom_credit_card.dispute_viewer has read-only access, including determination results.
  • sn_bom_credit_card.dispute_manager has managerial and reporting access, including determination results.

Test those actions with the corresponding role. Do not infer Mastercard administration permissions from the Nacha access model. For Visa, validate questionnaire-driven reason selection and the associated eligibility decision.

Record the acceptance decision

For each failed test, retain the application version, transaction inputs, questionnaire answers, expected condition, and observed result. Assign the next investigation to data mapping, questionnaire behavior, decision logic, or a customization. This is a recommended review sequence; it avoids changing several inputs before the cause is understood.

Before accepting the upgrade, rerun the changed conditions and a selection of unaffected dispute categories. Ask the dispute process owner to review the reason shown to the agent as well as the eligibility outcome. In most reviews, a correct decision with no recorded inputs is hard to defend during a later incident analysis.

Answers to common questions about Nacha, effective dates and blank codes

Does a domain field establish Nacha domain separation?

No. Nacha domain separation is unsupported. A domain field can exist without the business logic needed to manage separated data. Treat an isolation requirement as an architecture decision before approving the application for that environment.

How should effective-date logic be tested?

Use dates around the relevant rule boundary. The days_until_mastercard_rule_effective_date input calculates days until the fixed effective date and supports RC 4808 and several fraud decision tables. Record the evaluation date with the test so the result remains explainable later.

Can a blank merchant advice choice have meaning?

Yes. The merchant_advice_code choices include blank (no value) Retry with PIN. Include this case in your data checks and distinguish it from an integration failure rather than treating blank content as proof of missing data.

Do all Nacha reasons require the same supporting statement?

No. R07 requires a Written Statement of Unauthorized Debit, while R24 does not. Build document checks by reason code rather than applying one upload requirement across the acceptance list.

Can another content pack’s checklist be reused unchanged?

Reuse the review format, then replace its dependencies, inputs, and expected outcomes. A checklist written for a non-payment integration should not supply payment dispute acceptance criteria.