Bank account ownership verification in ServiceNow runs through the Relish Data Assure API. You build each bank check with its institution, country and bank identifiers, then an admin turns on the ownership step in the Bank Details Validation flow. The response returns a status and an overall result, and the result reflects whether the details and ownership checks passed.
Build the bank validation request
The request carries a validations array, and each bank check goes in as one object inside it. The bank validation input object has eight parameters. Five are required: type, input, externalId, name and country. Two identifiers are conditional, swiftCode and routingNumber, and iban is optional.
Type, input and externalId
The type field is an enum. For banking verification, set it to bank. The input field is an object that holds the bank details. The externalId is a string you supply to identify the check. It must be unique across all validations of this type, so build it from a record reference rather than a counter that restarts. That keeps two checks in the same batch from sharing a value.
Institution name, country and bank identifiers
The name field is required and needs at least one character. The country field takes an ISO 3166-1 code, either alpha-2 or alpha-3, two to three characters long. The swiftCode field is required when there is no routing number, and routingNumber is required when there is no SWIFT code. The iban field is optional and also needs at least one character.
When the supplier record has both a SWIFT code and a routing number, the parameters do not say how the check uses each identifier. Run a test record with both before you rely on the result.
Read the status and result values
Each response carries a status and a result. Status takes one of four values: PENDING, PROCESSING, COMPLETED or ERROR. Result takes one of five values: PASSED, PASSED WITH CAUTIONS, FAILED, REVISION REQUIRED or NOT VALIDATED.
Two arrays carry the detail. The validationSummary array gives a summary for each validation type, and the validations array gives the detailed result for each individual check.
Set a process rule that waits until status reaches COMPLETED or ERROR before anyone acts on the result. Nothing in the response fields shows that order, so the rule has to come from your team. Log each status and result next to the externalId and the request time, so a response can be matched to its change request later.
Deciding what each result triggers
The results name outcomes but not the action each one should trigger. Decide those actions before go-live and write them down with the team that owns supplier records. A PASSED WITH CAUTIONS result and a FAILED result are different outcomes, and the process should say what each one does. Cover NOT VALIDATED and REVISION REQUIRED in the same table.
A table with three columns works well for this: the overall result, the step the reviewer takes, and the person who signs off. Keeping the table in one place means reviewers answer the same way, and the rollout tests below can check against it.
Turn on bank account ownership validation
By default, the bank check covers the bank routing number and address details. Ownership validation extends the check to the bank account number and account ownership information. The option lives in the Bank Details Validation flow, not in the request body. The bank validation input parameters include no ownership field, so the request fields stay the same.
Before you start, install the SLO Connector for Relish Data Assure plugin (x_reliq_slo_connec) and confirm the other plugins the Relish integration requires are in place. The admin role is required to make the change.
Make the change with these steps:
- Go to All, then Process Automation, then Flow Designer.
- Search for the Bank Details Validation flow and open it.
- Find the fourth step, which contains the Use Bank Information for Ownership option.
- Set Use Bank Information for Ownership to Yes.
- Save and publish the flow.
Yes means Relish validates both bank details and bank account ownership. No means Relish checks routing numbers and address details without ownership. Confirm the step number on your instance before you edit it. If the option is not in fourth position, search the flow for the option name.
How the overall result is set after you enable ownership
With ownership validation on, all banking information change requests are checked for both bank details and account ownership. The overall result follows the least favorable outcome of the two checks, which gives three combinations:
- Bank details pass and ownership fails: the overall result is FAILED.
- Bank details pass and ownership passes with cautions: the overall result is PASSED WITH CAUTIONS.
- Both checks pass: the overall result is PASSED.
The three combinations above do not cover a failed bank details check, so the overall result for that case is not stated here. Test that case before you rely on it.
Plan the rollout before you switch ownership on
Once the option is set to Yes, the check applies to all banking information change requests from that point on. Tell the people who submit supplier bank changes before the flow goes live, so they know a request may now depend on the ownership result as well as the details.
Ownership validation checks the bank account number, so the intake form has to collect that number alongside the routing details. Confirm which fields your form collects before you switch the option on. Pick a switch date, and send the first set of requests after it to a named reviewer. Ask reviewers to record the externalId beside the overall result, so a failed check can be traced back to the request that produced it.
For help planning this work, see ServiceNow implementation.
Test the setup before you rely on it
- Submit one change request with bank details that you know are valid, and confirm the overall result reads PASSED.
- Submit one change request that you expect ownership validation to fail, if your test data allows it, and confirm the overall result reads FAILED.
- Check that validationSummary has an entry for each validation type in the request.
- Open the validations array and confirm each bank check returns its own detailed result.
- Set the option to No, publish the flow again, submit one more request, and confirm the result reflects routing numbers and address details without ownership.
Keep the test records in one log and note the externalId of each request. When you re-run a case after a fix, give it a new externalId and note both values in the log, so the earlier result stays readable.
Related checks in the same banking workflow
Banking verification sits alongside three related tasks: verifying banking information, verifying a supplier location change request, and conducting sanction screening. Each one has its own setup, and each has its own parameter reference. Address verification and sanction screening parameters are kept in their own reference pages.
For context on how banking checks fit into wider financial workflows, see ServiceNow banking use cases for loan servicing and case management. Other industry pages are listed under ServiceNow industries.
Questions about bank account ownership checks in Relish
Does turning on ownership validation change the request fields?
No. The bank validation input parameters include no ownership field, so the request body is the same whether the option is set to Yes or No. The change happens in the Bank Details Validation flow, which sets how far the check reaches.
What does account ownership cover in this check?
When the option is set to Yes, Relish verifies the bank account number along with the account ownership information. The ownership information is not defined further on this page, so read the validations array to see what a given check returned. The word ownership here refers to the bank account. For record owner rules in Salesforce, see partner manager account ownership rules in Salesforce.
Why would a request show REVISION REQUIRED?
REVISION REQUIRED is an overall result, and the overall line does not state the cause. Find the detail for the check that did not pass in the validations array, correct the bank details behind it, and submit a new request.
Does the change apply to requests already in progress?
The new result set applies to banking information change requests validated after the option is enabled. Whether requests already in progress are re-checked is not described here. Check that on your instance before the switch date, and list any open requests that would need a new submission.
Can a request with only an IBAN pass the input check?
Not by itself. The iban field is optional, and the input rules require a SWIFT code or a routing number. Add one of those identifiers along with the IBAN, and include the required name and country fields as well.