OBLYTECH Logo
OBLYTECH Logo

Set equipment holder extension classes

Equipment holder extension classes are the sub-classes that extend the Equipment Holder class in the Telecommunications Network Inventory application. There are six: Cabinet, Multi Rack, Rack, Shelf, Slot and Subslot. Each class has its own table, so picking the class that matches your hardware decides where the record is stored.

How the six extension classes map to hardware

Every class in this set extends cmdb_ci_equipment_holder, so each holder shares the same base structure and differs by the kind of hardware it represents. The table name tells you which class a record belongs to.

  • Cabinet (cmdb_ci_container_cabinet): the enclosure that holds telecom gear, such as switches and patch panels, in one secured unit.
  • Multi Rack (cmdb_ci_container_multi_rack): a group of linked racks that houses a large volume of equipment in one location.
  • Rack (cmdb_ci_container_rack): a frame that holds servers, network devices and storage units in a standard form factor.
  • Shelf (cmdb_ci_container_shelf): a platform inside a rack or cabinet for equipment that has no rackmount hardware of its own.
  • Slot (cmdb_ci_container_slot): a receptacle on a host device that takes a component, such as an expansion card or memory module.
  • Subslot (cmdb_ci_container_subslot): a slot located on a card that can accept child cards.

Slots and subslots are tied to their hardware by a Dependent on Hardware relationship, written as contains and contained by. The hardware record is the container and the slot is the contained item, so the direction of that link matters when you review how a device is built.

If your team covers more than one sector, browse the ServiceNow industry pages for the sector you work in, then apply the class rules on this page to each one.

Planning the holder tree before you enter data

Write down the physical hierarchy for one site before you open the workspace. Settle each item’s class and parent first, so the data entry runs in a single pass rather than in corrections later.

A spreadsheet with one row per holder is enough for a single site. Give it columns for class, parent, name source and linked assets. For each piece of hardware, answer four questions:

  • Which of the six classes describes it?
  • Which holder sits directly above it in the tree?
  • Is there a name on the device, or does the card in the slot supply the name?
  • Which network assets will it hold, so you know what the related tabs must link?

Keep naming consistent across sites. The same pattern for racks in every cabinet makes review easier, and it lets the slot and subslot naming rule apply the same way at each location. Organizations in energy and utilities that run the same cabinet type at many remote locations will see the pattern repeat at each one.

Choosing a class and building the holder tree

Build the physical tree from the outside in. In most inventories the cabinet or multi rack comes first, then the racks and shelves inside it, then the slots on each device. Subslots come last, since they sit on cards that are already in a slot. Building in this order means each parent exists before you add its children.

Consider a site with one cabinet holding two racks. A switch that has no rackmount kit sits on a shelf in the first rack, so it gets a Shelf record. A server in the second rack has an expansion slot, and that slot holds a card that accepts its own module. That gives you a Slot record for the expansion slot and a Subslot record for the module slot on the card.

A multi rack works the same way one level up. When several racks are joined into one group, the group is the Multi Rack record and each rack stays its own Rack record beneath it.

Naming matters most for slots and subslots. For a slot, the name is usually discoverable from the device. When it is not, use the name of the card that sits in the slot. For a subslot, the name is discovered from SNMP. If that is not available, use the name of the card in the subslot.

If your plant has changing floor layouts, start with the manufacturing operations pages, then return to the class list above when you begin entering records.

For help planning this work, see ServiceNow implementation.

Defining an equipment holder record step by step

Role required: sn_ni_core.inventory_admin, sn_ni_core.inventory_agent.

  1. Go to Workspaces > Network Inventory Workspace.
  2. Select the list icon, then go to Inventory > Equipment Holders.
  3. Select New, then select the equipment holder type from the list. This choice determines which extension class and table the record uses.
  4. Select Submit. The inventory form opens for the type you chose.
  5. On the Details tab, fill in the form for the holder.
  6. Select Set Inventory Attributes. This creates a reference to the record in the CI table.
  7. On the TNI CI Attributes form, fill in the fields, then select Save.
  8. To attach graphics or documents, select the attachment icon in the right panel, then select Save.
  9. Open the related tabs to record relationships with other network assets.

Once the TNI CI Attributes form is saved, the Telecommunications Network Inventory attribute fields appear on the Equipment Holder form. The related tabs then appear on the form, and you can view or modify their information there.

The Set Inventory Attributes button appears for the equipment generic classes listed in the sn_ni_core.equipment_tables system property. That property takes a comma-separated list, and the documented examples are Computer, Network Gear, Virtual Machine Object, Kubernetes Component and Service Instance. An admin adds classes under All > System Properties > All Properties. If the button does not show on a record where you expect it, check that property value first.

Checks to run after you save

Run these two checks before you link the holder to other assets. They confirm that the attribute step completed.

  • Confirm that the Telecommunications Network Inventory attribute fields appear on the Equipment Holder form. If they do not, go back to the TNI CI Attributes form and confirm it was saved.
  • Reopen the CI record and confirm that Set Inventory Attributes no longer appears.

Reviewing the tree once it is built

After the first pass, compare the tree with the hardware at one location. Walk it from the cabinet down. For each holder, confirm that the class matches the hardware, that the parent is the device it sits in, and that the name follows the slot and subslot rule.

Make corrections in place rather than creating a second holder for the same hardware. A duplicate sits in the tree as a second physical item, which makes the clean-up harder than editing the record you already have.

Keeping holder records current

Use the more options icon on the record for two maintenance actions. Select Add Packs to capture attributes for the configuration item (CI) record behind the holder. Attribute packs are optional, so add one only when the inventory needs the extra fields.

When a holder leaves service, open the more options icon again and select Decommission to decommission its CI record.

A physical move usually means a change to the related tabs rather than a new holder record. Review the related tabs after each change window so the tree matches the hardware on the floor.

Mistakes that create rework

One easy mistake is saving the Details tab before you select Set Inventory Attributes. If you select Save without selecting Set Inventory Attributes, the system creates a CI record but not a Telecommunications Network Inventory CI record. Select Set Inventory Attributes before you save the form.

The second mistake is picking the wrong type at the selection step. The type decides which table the record uses, and the class list earlier in this page is the quickest check before you select Submit.

Questions about holder records and their CI records

Does creating a holder record also create a CI record?

Yes. A new equipment holder record creates a corresponding configuration item record in the Equipment Holder extension class table.

Where do I see the network assets linked to a holder?

Select the brick icon on the record. The Infrastructure Relationships section shows the associated network inventories, grouped by individual network asset instance.

Why is the Open Map button missing?

Open Map gives a visual representation of the selected record. The button needs Service Graph Workspace or CMDB Workspace 3.5.0 or a later version installed on your instance.

What does the Dependency View show?

The Dependency View graphically displays the configuration items that support a specific network asset and the relationships between them. Open it from the more options icon by selecting Dependency View.