To set up Telecom Discovery Builder, copy the prebuilt framework ETL into your Service Graph Connector application scope, attach a schema-compatible temporary data source, and validate the mappings. Then replace that source with the connector’s discovery data source, configure TNI handling where needed, and test the connector before deployment.
Prepare the Telecom Discovery Builder configuration
The framework arrives with the Telecommunications Service Operations Management (TSOM) Core plugin. Activating the TSOM Core plugin makes the generic ETL available in IntegrationHub ETL Studio. The baseline supplies reusable transformation logic for telecom inventory, so connector development starts with existing mappings rather than an empty transformation.
Keep the work in the connector’s application scope. The intended customization point is a duplicate of the framework, with its own source and configuration. This separates connector changes from the core baseline and gives the team a defined place to inspect mappings when the incoming payload changes.
Treat the framework as a template rather than something to configure in place. On the Brazil release the sequence has four stages: create a temporary data source based on the Generic Schema multi source data source from TSOM Core, duplicate the Telco Generic Schema ETL into the connector scope with importSet as the discovery source, replace the temporary source with the connector’s actual discovery data source, then test or deploy the connector. Keep those stages as separate entries in your change log, so that a failed test points to the stage that introduced it.
Before starting, identify the target connector application, its actual discovery data source, and the inventory classes the payload should produce. Prepare a sample that follows the Telco Generic Schema. A sample is optional for creating the temporary source, but it gives testing a concrete expected result.
The data-source creation and ETL duplication procedures require admin. Verify that access for these actions before opening the configuration forms. These steps are written for the Brazil release, so baseline names and available controls may differ on other releases.
Create a temporary source that matches the telecom schema
The temporary source gives the duplicate a compatible import structure before live device data enters the pipeline. A source with unrelated columns may let you start configuration while leaving the ETL without the expected input. Establish the schema first, then move on to transformation testing.
- Switch to the connector’s application scope.
- Navigate to All > System Import Sets > Administration > Data Sources.
- Locate Generic Schema Multi Source v2, or the corresponding baseline source supplied with TSOM Core.
- Open that record and copy the script from Data Loader.
- Select New to create the connector-scoped source.
- Set Type to Custom (Load by Script) and select Data in single column.
- Paste the copied script into Data Loader, then select Submit.
Record which temporary source belongs to this connector. Give the duplicate a data source other than the default one wired into the Telco Generic Schema ETL, so the test source stays easy to tell apart when you review the mapping later. Retaining that distinction makes the later switch to the actual discovery source easier to review.
Duplicate the baseline into the connector scope
Use admin for this action. Confirm that the temporary source exists before beginning, and that the generic ETL installed with the TSOM Core plugin is available. The duplicate becomes the connector’s working transformation, while the original remains the baseline for other connectors.
- Navigate to All > IntegrationHub ETL and select the connector’s application scope.
- Expand the CMDB Application Telco Generic Schema and open the Telco Generic Schema record.
- Select Duplicate to open Duplicate ETL Transform Map.
- Check that Duplicate From contains Telco Generic Schema.
- Select an existing CMDB Application, or use Add new… and supply the application name.
- Set Discovery Source to the import set choice, identified as importSet in the configuration workflow.
- Enter the duplicate’s Name and Description, then select the temporary data source.
- Enable Auto-pull a new import set. Set Preview Size Override for the intended test sample.
- Select Create Duplicate.
Name the duplicate for the connector rather than the baseline, and record its source and inventory coverage in the description so another administrator can tell it apart from earlier experiments.
Open the duplicated ETL and inspect its mappings and settings. Check the selected application and data source before testing.
Validate the duplicate before changing its source
Run a test load or simulation against the temporary source. Review import processing, the CIs produced, and the relationships between them. These checks answer different questions: staged data establishes what arrived, CI inspection shows how it transformed, and relationship inspection shows whether the inventory structure survived ingestion.
For example, a sample containing network equipment and its ports should be checked for both the equipment and port records and their expected connections. Treat that as a test design based on your payload, rather than assuming that an error-free import establishes the complete model.
If the staging data is wrong, return to the temporary source and sample. If staging is correct but target records are wrong, review the duplicate’s mappings. If the CIs are present but their connections are missing, inspect relationship handling. This sequence keeps investigation focused on the point where the observed result first diverges from the expected result.
The target model matters as much as the load. Use the Telecom Network Inventory overview when defining which inventory entities and relationships the acceptance sample needs to cover.
Enable TNI handling and connect the real discovery source
When TNI is enabled, a CI created by the duplicated ETL needs a corresponding TNI entity. TNI must be installed and active before configuring this extension. The action requires admin and an ETL already duplicated into the target application scope.
From All > IntegrationHub ETL, select the CMDB Application associated with the duplicate. In its configuration, select Execute Before Script. Replace the default script with a wrapper accepting input and runId that invokes checkAndUpdateIrePayloadForTni(input) on a new sn_tsom_core.TelcoGenericMappingHelper instance. Select Update to save.
Include linked TNI entities in the next validation pass. A CI appearing in the CMDB does not, by itself, prove that the TNI extension was configured successfully. Inspect the corresponding inventory entity as a separate acceptance check.
After the duplicate works with the temporary source, replace that source in the ETL configuration with the connector’s actual discovery data source. Preserve the schema contract: the production payload still needs to align with the Telco Generic Schema expected by the transformation.
Repeat the validation using representative discovered data. Compare the staged payload, resulting classes, relationships, and TNI entities with the earlier sample. This comparison can expose a difference between simulated data and the actual source without requiring an immediate rewrite of the entire ETL.
For help planning this work, see ServiceNow implementation.
Deploy the connector with clear acceptance checks
Deploy the connector integration into the selected test or production environment after successful duplication and testing. Monitor import runs to establish that real inventory continues to reach the CMDB correctly. Keep a record of the duplicate’s name, application scope, selected source, and expected inventory coverage for handover.
Review the first production results against the same acceptance sample used during testing. Investigate missing classes, absent relationships, and missing TNI entities separately. Avoid accepting the deployment solely because the connector ran: its purpose is to produce the intended inventory structure.
This ETL work sits within a wider discovery design. The ServiceNow Discovery overview explains the neighboring discovery capability, while Discovery and Service Mapping provides context for planning inventory and dependency work together.
Questions about the connector’s operating context
Can telecom connectors coexist with IT and cloud connectors?
Yes. Telecom Service Graph Connectors can operate alongside IT and cloud Service Graph Connectors. When planning the deployment, identify which integration supplies each inventory domain so the team can review overlapping incoming records deliberately.
Which subscription includes Telecom Service Graph Connectors?
Telecom Service Graph Connectors are part of TSOM Visibility and extend the standard Service Graph Connector framework. Telecom Service Graph Connectors are part of the TSOM Visibility subscription, so confirm that subscription covers the telecom connector before you plan the integration.
Where does the MID Server fit?
The MID Server provides the bridge between the ServiceNow instance and the external network management system. The ETL handles transformation of staged data; plan connectivity and ingestion transformation as separate responsibilities within the connector design.
Can this inventory support discrepancy work?
Telecom connector inventory can feed Telecom Discrepancy Identification & Reconciliation. Include the downstream inventory expectations in the acceptance criteria so that ingestion testing covers the records needed for later discrepancy detection and remediation.