ServiceNow uses the Model Context Protocol in two directions. The MCP Server Console publishes tools from a ServiceNow instance to outside AI clients. The MCP Client lets ServiceNow AI agents call tools hosted on external MCP servers. On the server side, each connecting client signs in with OAuth 2.0.
Two directions of traffic on the platform
Model Context Protocol, usually shortened to MCP, is a shared way for an AI application to find and call tools, data sources and services that live somewhere else. The protocol has two roles. An MCP server hosts the tools and handles requests. An MCP client is the side that asks for them. ServiceNow plays both roles, and it is worth keeping them apart when you plan a setup, because they are configured in different places and they answer different questions.
When ServiceNow is the server, the question is: which of our records, actions and skills should an outside assistant be allowed to use? The MCP Server Console is where you build that answer. Outside AI clients connect to the server, authenticate with OAuth 2.0 and then get the list of tools the server exposes.
When ServiceNow is the client, the question flips: which external tools should a ServiceNow AI agent be able to reach? The MCP Client gives agents access to tools hosted outside the instance and published through an MCP server that is registered in AI Agent Studio. Adding an MCP server in AI Agent Studio lets a ServiceNow AI agent use the Model Context Protocol as one of its tools. For the wider picture of how ServiceNow connects to other systems, see the ServiceNow integrations hub. For the service side of agent work, see the AI and agentic automation service page.
Creating an MCP server in the MCP Server Console
The console is a separate application. In the Brazil release, it is available through the ServiceNow Store and needs the Now Assist application to be activated before it works. The setup wizard now embeds OAuth client registration, so an administrator no longer has to switch to a second console to finish the job.
The role that does this work is the AI administrator. Either sn_mcp_server.admin or admin will do. To find the console, use the All menu, or Admin, and open MCP Server Console. Then go to the Configuration tab, choose Servers, and select Create server.
The server form asks for five pieces of information:
| Field | What goes in it |
|---|---|
| Label | An internal name you pick for the server |
| Name | Created automatically from the label; it becomes part of the endpoint address |
| Application | The application scope the server belongs to, which is the current one |
| Short description | A plain statement of what the server does and what it is for |
| Tools | The tools the server will expose to clients |
Adding tools means selecting Add tools, searching for the tools you want, and selecting Add. Tools must sit in the same application scope as the server. If a tool you need does not exist yet, the form offers Create tool, which opens a separate process for building one.
There are three ways to leave the form. Create makes the server active straight away. Save as draft keeps the server saved but switched off, so you can review it and activate it later from the server record or from the Servers list. Deactivate turns off access for an existing server, and it can be done from the same two places. A draft suits a server whose tools are still being tested.
After the server is created, its Server URL field fills in automatically. The address follows this pattern: the instance host, then the sncapps mcp-server path, then mcp, then the server name. Clients connect to that address. Because the name is generated from the label, settle the label before the first save so the address reads well from the start.
Tools, annotations and the Quickstart Server
A tool defines the functionality and the data a server exposes, along with the actions a client may take. Tools can be built from existing capabilities, including Now Assist skills, and from several other categories.
The Brazil release added annotations for all supported tool types. Annotations appear in the tool list a server returns to a client, and they let clients such as Claude apply their own permission policies.
Brazil also added tools built from Playbooks and from Searches, as an early availability feature, so an administrator can expose those to MCP clients as well.
For a faster start, the console offers a preconfigured Quickstart Server. It includes four tools: case summarization, incident summarization, look up case records, and look up incident records. Both summarization tools are AI skills. A team that only needs to test the flow end to end can start with the Quickstart Server and then add its own tools once the connection works.
Connecting outside AI clients over OAuth
Clients authenticate with OAuth 2.0 and then get a list of available tools.
The AI administrator creates and configures the server first and adds the tools. Last, each client is configured with the server details and the authentication details. For the OAuth profile itself, see the OAuth profile explainer.
The Brazil release also added client authorizations, which let an administrator create OAuth clients inside the MCP Server Console instead of going to a separate place. It also added third-party identity provider integration for user authentication, so people signing in through an outside provider can be recognized when they use a server.
Constraints that shape the design
Several limits affect what you can build, and they are worth knowing before anyone draws up a plan. For the general pattern behind connections like these, see the integration pattern explainer.
Servers have to be stateless and remote. A server cannot hold a session for one client across calls, and it has to be reached over the network rather than run as a local process. Transport is Streamable HTTP. Tool calls return a single JSON response by default, and Server-Sent Events are optional when streaming is wanted. Stdio is not supported.
Resources and prompts, two other parts of the protocol, are not supported. Tools and the server must share one application scope, so a tool that lives in another scope cannot be added.
The MCP rate limit is not currently configurable, and changing it requires a service restart. A team planning heavy use should factor this in before go-live.
Monitoring, availability and regional limits
The Brazil release added a monitoring dashboard for MCP server and tool performance and usage across a chosen period.
Access to some features depends on your license, so confirm which features your instance includes before you commit to a design.
Data travels from the customer instance to a centralized ServiceNow environment, which can sit in a different data center region, and it can also pass to a third-party cloud provider such as Microsoft Azure. ServiceNow uses inputs, outputs and edits to outputs to develop its AI products, and customers can opt out through the AI Opt-Out page. These points belong in any review that involves personal or regulated data.
Frequently asked questions
Is MCP a ServiceNow product, or a standard?
MCP is a standard protocol for AI applications to reach tools and data. ServiceNow implements it in two places: the MCP Server Console, which publishes instance tools to outside clients, and the MCP Client, which lets ServiceNow AI agents call external MCP servers.
What is the difference between the MCP Server Console and the MCP Client?
The console makes ServiceNow the server, so outside assistants can list and call tools on your instance. The MCP Client makes ServiceNow the caller, so an agent you build can use tools that live on another MCP server.
Who is allowed to set up an MCP server?
The AI administrator creates servers and adds tools. Creating a server requires the sn_mcp_server.admin role or the admin role.
Can I test an MCP server before clients can reach it?
Yes. Save the server as a draft instead of creating it. A draft is not active, so it does not accept client connections until you activate it from the server record or the Servers list.
Do MCP servers on ServiceNow support every part of the protocol?
No. Resources and prompts are not supported, stdio is not supported, and servers must be stateless and remote. Tools over Streamable HTTP are the supported path.
What does the Quickstart Server need to work fully?
It includes four tools for looking up and summarizing case and incident records. The tools available depend on the applications installed on the instance, such as ServiceNow Otto for CSM or ServiceNow Otto for ITSM.