OBLYTECH Logo
OBLYTECH Logo

Cloud Rightsizing and Unused Resource Reclamation Explained

Rightsizing and unused resource reclamation are two recommendation features in ServiceNow Cloud Cost Management. Rightsizing proposes a smaller size for an over-provisioned resource, while unused resource processing proposes powering off or terminating one with little real work. Each recommendation carries a monthly saving and a confidence rating.

Two features that answer different questions

Both features sit in ServiceNow Cloud Cost Management, and each successful Billing Download job refreshes both sets of recommendations. Rightsizing asks whether a running resource is larger than its workload needs, and its fix is a resize. Unused resource processing asks whether a resource does meaningful work at all, and its fix is a shutdown or termination. For the wider picture, start with the plain-language guide to cloud cost visibility.

On AWS, the analysis takes the average of the top 20 percent of CPU readings over a 14-day window. An average below 1 percent routes the resource to unused resource processing. An average above 1 percent and below 40 percent routes it to rightsizing. Reviewing both lists side by side therefore helps.

Aspect Rightsizing Unused resources
Question answered Is this resource larger than its workload needs? Is this resource doing useful work?
AWS routing rule Top-20-percent average CPU between 1 and 40 percent Top-20-percent average CPU below 1 percent
Proposed action Resize to a recommended size Power off or terminate
Settings location Optimization, Rightsizing, Settings Optimization, Unused resources, Settings

How the analysis builds its numbers

The analysis reruns each time billing data refreshes. For AWS it collects 14 days of CPU and memory readings, looks up rates in the price sheet tables, applies any discounts, and compares potential cost with the cost actually billed.

Recommendations for AWS come from CPU usage alone. Memory decides the target size. The recommended size is chosen so that peak memory across the window stays at or below 80 percent of it.

Some AWS resources are excluded from the analysis. These include Auto Scaling group members, burstable instances, instances outside a VPC, instances without an EBS root volume, instances without enhanced networking, non-HVM virtualization types and Spot instances. If a resource is missing, check this list first.

Azure recommendations combine Cloud Cost Management analysis of billing, usage and policy data with recommendations from the Azure Advisor service, which refresh when the integration job completes.

Google Cloud recommendations come from the Google Cloud compute engine and are displayed as they are. A resource that appears under both unused and rightsizing is kept under unused, with the reason “Recommendation already present in unused”.

Reading confidence before approving

Confidence reflects how much usage history exists and whether the change stays within one instance family and generation. The rules below are the rightsizing confidence definitions.

Confidence Usage history Family or generation
High At least 10 days Current and recommended are identical
Medium Fewer than 10 days Current and recommended are identical
Low Any length Current and recommended differ

A low rating means the move crosses a family or generation boundary, so the workload may behave differently on the new hardware. Treat it as a planning question rather than a routine approval.

Settings, thresholds and exclusions

Before configuring anything, run Discovery on each service account, confirm the billing and price sheet downloads have completed, and enter the discount rate for each service account. The settings require the insights admin or insights owner role.

The rightsizing settings include an enable checkbox, enabled by default. The after-resize exclusion period holds a freshly resized resource out of the analysis for a set number of days while the new size is monitored. The minimum is seven days, and the resource cannot be removed from the list during that window. On Azure, Azure Advisor can recommend another resize after seven days regardless of this setting, and a longer period suppresses the Advisor recommendation for the extra time.

The minimum savings threshold is measured over a 30-day period. A recommendation that saves less than the threshold does not appear. The notification threshold works on overall cloud spend. It compares the saving from applying all rightsizing recommendations with total spend, and when the share passes the configured percentage, which defaults to 15 percent, an email goes to the users or groups you name.

Unused resources settings follow the same pattern, with an Azure SQL auto pause interval that defaults to 60 minutes of idle time and a maximum snapshot age that defaults to 90 days.

Memory needs its own setup. On AWS, memory statistics are not collected automatically. You publish them to Amazon CloudWatch and then define a matching custom metric in Cloud Cost Management, choosing the provider, the service category, the service accounts, the aggregation (average, minimum or maximum), the metric type and a threshold percentage. Cloud Cost Management checks the namespace and metric name. If no memory data is returned, the analysis uses the resource’s maximum memory as its basis.

Exclusions come in two kinds. An analysis exclusion keeps a resource out of recommendations while cost and usage collection continues. A global exclusion hides a resource from reports without changing the analysis, and the global list shows virtual machine resources. Production systems that must keep running are typical candidates for a global exclusion. For reclamation of software rather than cloud resources, see the ServiceNow software reclamation rules.

Scheduling a job and what the states mean

Select resources on the New tab and choose Schedule. The dialog asks for a job type, a unique job name, a run date and time, and an approval type. A change template field appears when auto-approval is selected. Resources that were scheduled before but did not resize can be placed in a new job from the Declined or Failed tab using Reschedule.

With auto-approval, the system generates a Standard Change request, approves it, and adds the resource to the job’s resize list. With manual approval, a Normal Change request goes to a change group member, and the resource stays on the reports until that person acts. Saving the job creates the change requests immediately, and the job runs at the scheduled time. A resource sits in Pending until it is approved or rejected. Approval moves it to Approved. Rejection moves it to Declined, and it stays on the report with no action taken. The governance model for cloud cost visibility covers the wider sign-off questions.

From Cloud Cost Management v11.0.0, the insights admin and insights owner roles inherit the change read role rather than the change write role. These users can see change requests created from a schedule but cannot create them directly. A change creator user must be configured before recommendations can be scheduled. For who holds each of these responsibilities, see the roles, responsibilities and RACI guide.

When a resize fails on AWS

A job runs in batches grouped by provider, service account and region. A resource that is ON is stopped, resized and restarted. A resource that is OFF is resized but not started. A restart can fail, for example when the new size exceeds a quota for that resource type or when an availability zone is constrained.

If any modified resource in a batch fails to restart, each resource in that batch is rolled back to its original size and restarted. The change requests are updated, and the affected items show Failed on the report. OFF resources in the batch are not rolled back or marked failed. On Azure, the Azure Update service performs the rollback rather than Cloud Cost Management.

Stopped AWS RDS databases fail to resize with an invalid state error, so start the database first. For a checklist to run before resizes go live, see the testing and acceptance checklist.

Working the tabs and moving resources

The rightsizing report’s New tab holds candidates, refreshed after each billing download. Scheduled, Declined, Failed and Excluded tabs hold items that need Reschedule, Exclude or Remove-from-exclusion actions. Completed items need no further action. Resources can be moved between jobs with the same dialog, and a scheduled job’s planned date can be edited before it runs.

Frequently asked questions

Which list should I review first, rightsizing or unused resources?

Review them as two queues. An unused item asks whether the resource should exist at all. A rightsizing item has a real workload that is oversized.

Why does a recommendation show low confidence?

A low rating means the recommended size belongs to a different instance family or generation. The rating is based on how much usage history exists and whether the family or generation changes. Look at the family change and test the workload on the new family before approving.

Why is a resource missing from the recommendations?

Check the AWS exclusion list first, covering Auto Scaling group members, burstable instances, instances outside a VPC, non-EBS root volumes, missing enhanced networking, non-HVM virtualization and Spot instances. Then check the Excluded tab, and whether the recommendation was dismissed in the Google Cloud console. For data-side causes, the troubleshooting guide for cloud cost visibility is the next place to look.

Why did a resize fail on a database?

One cause on AWS is trying to resize a stopped RDS database. Start the instance first. Quota limits and constrained availability zones can cause failed restarts, and the batch rollback returns the resource to its original size.

Who gets notified when a job changes?

When a job includes a resource owned by another user, or the job was created by a different user, an email goes to the resource owner or the job creator. Separately, the threshold notification goes to the users or groups named in the settings whenever the share of incorrectly sized spend passes the configured percentage.